Technical & Specifier Centre
One place for current Apollo product information.
Search public handbooks, product pages, fitment material, specifications and project-planning tools. Drawings, certificates, warranties and other product documents are included where available for the relevant system.
Product guides & specifications
Find helpful product information.
Browse product information where available, or ask our team for the details relevant to your selected model and project.
CADARN APERTA
ARKEN Architectural Louvre Systems
ORZENZA Steel & Aluminium Outdoor Systems
LUNVIQ Outdoor Roller Screen Systems
FASGAR Architectural Roof Systems
Sports flooring
Pickleball
KNOTTR 3x3 Basketball Systems
LUTHVAR 5-on-5 Basketball Systems
Gym & Functional Fitness Flooring
Artificial Turf Solutions
Product guides are provided for planning. Please confirm the latest specifications and suitability for your exact model and location before ordering. Apollo supplies products only; local site works, engineering and installation are arranged separately.
Ask Apollo Technical
Search Apollo's technical library in plain language.
Ask a question about an Apollo product or project pathway and get an answer from the current technical information available on the website.
Technical search does not calculate pricing or replace project-specific engineering and professional advice.
Apollo Reference Library
Project guides, templates and technical references.
Use these resources to prepare scopes, compare options and structure project information before quotation and project review.
Project guides
Reusable references for briefs, specifications, procurement and technical submissions.
A practical starting point for project use, dimensions, quantities, destination, timing, drawings and other information that helps Apollo review the requirement.
Open guide 02SpecificationSpecification & Tender GuideA cross-category project guide covering product identity, current technical information, project-specific requirements, local responsibilities, substitutions and required documents.
Open guide 03Technical documentsTechnical Document GuideA practical guide to using datasheets, test reports, certificates, calculations, manuals, drawings and warranties for the relevant product and project.
Open guideDomain references
Planning guides, comparison matrices and technical pathways.
Apollo Technical Reference Data Library
Downloadable public planning matrices for sports facilities, outdoor architecture, water & WASH, modular development, project technology and pool project evidence.
Open reference 02Professional gatewaySpecifier & Procurement Reference Library
One professional gateway for technical information, specification guidance, comparison matrices, procurement resources and RFP tools.
Open reference 03Project referencesProject Resources, Templates & Matrices
A practical index linking Apollo project guides, working templates, project checklists and comparison matrices from one professional reference page.
Open reference 04SpecificationApollo Specification Toolkit
Generic specification clauses plus substitution review, technical-document request and pre-tender coordination schedules.
Open reference 05Professional templatesProcurement Templates & Project Checklists
Copyable and downloadable procurement, technical-submittal and international RFP templates for working project teams.
Open reference 06Public-sector procurementPublic-Sector & Development Tender Readiness Guide
A tender-planning reference for schools, councils, developers and commercial teams covering project scope, technical submittals, substitutions, lifecycle, logistics, responsibilities and structured tender returns.
Open reference 07Project planningApollo Project Library
Filterable project references, verified case studies, applications and planning guides connected to Apollo products and project pathways.
Open reference 08Sports surfacesComplete Sports Flooring Selection Guide
A planning guide for comparing modular tile, roll-out, impact-flooring and sled-turf pathways around base condition, drainage, repair and operating requirements.
Open reference 09Stadium & venueStadium Seating & Grandstand Selection Matrix
Compare portable bleachers, retractable seating, aluminium and steel grandstands, covered stands and fixed stadium seating around venue type, scale and project interfaces.
Open reference 10Stadium & venueStadium Seating & Grandstand Project Planning Guide
Plan the full spectator-infrastructure brief around venue use, circulation, accessibility, structure, weather cover, technical information, freight, installation responsibilities and lifecycle support.
Open reference 11Gym flooringRubber Gym Tiles vs Rolls
A practical comparison of modular repair, joint patterns, impact zoning, broad-area coverage, transitions, substrate preparation and maintenance strategy.
Open reference 12Court planningComplete Pickleball Court Planning Guide
Footprint, run-off, base, drainage, surface, equipment, access, lighting and future-use considerations brought together in one planning reference.
Open reference 13ArchitectureArchitectural Façade Technical Design Guide
A technical coordination reference covering façade system selection, support concepts, joints, corners, forming, perforation, finishes, samples and project-specific requirements.
Open reference 14ArchitectureArchitectural Façade Specifier & Tender Centre
System selection, conceptual details, finishes, samples, mock-ups and tender wording organised for architects, consultants and project teams.
Open reference 15SportsSports Specifier & Procurement Centre
Sports surfaces, court infrastructure, lighting, seating, covered venues, technical evidence and project-brief pathways organised around the actual facility.
Open reference 16Outdoor architectureOutdoor Architecture Specifier Centre
Louvre, fixed, retractable, blind, shade and enclosure systems organised around structure, drainage, controls, exposure and exact-system evidence.
Open reference 17BuildingsBuildings & Large Structures Specifier Centre
Clear-span, steel and modular building pathways organised around geometry, design criteria, envelope, technical evidence, logistics and local responsibilities.
Open reference 18Public realmPublic Realm Specifier & Procurement Centre
CIVARO and public-space schedules organised around environment, accessibility, fixing, lifecycle, maintenance and tender evidence.
Open reference 19Pools & wellnessPools & Wellness Specifier Centre
Modular pools and wellness systems organised around site readiness, lifting, hydraulics, services, drainage, barriers and maintenance access.
Open reference 20Outdoor architectureComplete Outdoor Blind Planning Guide
Opening size, structural fixing zones, exposure, fabric outcome, operation and controls considered before a Velaris configuration is selected.
Open reference 21Pools & wellnessComplete Modular Pool Planning Guide
A site-first reference covering delivery and lifting access, foundation strategy, drainage, services, barriers and local project responsibilities.
Open reference 22Pools & wellnessORDRAN Standard vs Made-to-Measure Guide
Compare four transferred reference sizes with ORDRAN made-to-measure pool possibilities without mixing supplier-specific specifications.
Open reference 23Pools & wellnessORDRAN Pool Selector
Choose between standard-size planning references and made-to-measure configurations, then carry the selection into an enquiry.
Open reference 24Pools & wellnessORDRAN Technical Centre
Architectural pool technical planning across CUSTOM, INFINITY, PLUNGE, LINEAR, structure, windows, water systems, lifting, QA and project-information resources.
Open reference 25Pools & wellnessORDRAN Technical Centre
System anatomy, installation routes, hydraulic flow, equipment-bay planning, acrylic-window interfaces, manual and automatic covers, sliding deck covers and delivery logic.
Open reference 26Pools & wellnessPool Contractor & Ownership Planning
Site preparation, placement, commissioning, handover, owner care, cover maintenance, acrylic-window care, coastal upkeep and service-record planning.
Open reference 27Pools & wellnessAuremont Options Centre
Compare viewing windows, WPC integration, Baja shelves, pool + spa, counter-current, water treatment and the three current cover pathways before final configuration.
Open reference 28Pools & wellnessAuremont Multi-Pool Schedule Builder
Structure repeated pool types, quantities, option packages and staged releases for development and hospitality programmes.
Open reference 29Pools & wellnessAuremont International Logistics Planner
Plan destination, receiving, shipment stages, truck access, crane readiness, storage and local site interfaces for international pool supply.
Open reference 30Pools & wellnessAuremont Buyer FAQ
Scope, crane, standard-size, installation, utility, cover, international-delivery and multi-pool answers linked to the relevant Auremont planning pathways.
Open reference 31Pools & wellnessAuremont Pre-Dispatch + QA Centre
Configured-order identity, project release evidence, equipment, packing, logistics and evidence-control guidance before dispatch.
Open reference 32Pools & wellnessAuremont Installation-Day Checklist
Receiving, lifting, placement, local connections, first operation, cover/window checks, commissioning and handover for the destination project team.
Open reference 33Global projectsGlobal Project Readiness Matrix
A concise international-project matrix covering destination, climate, local requirements, freight handover, site interfaces and receiving documents.
Open reference 34Power & energyRHELGAN Generator Specification & Quotation Template
A controlled generator schedule for ratings, electrical configuration, components, enclosure, environment, fuel, controls, testing, documentation, warranty, freight and explicit project exclusions.
Open reference 35Global projectsGlobal Market × Product Capability Matrix
A market-by-market view of Apollo product pathways across current target regions.
Open reference 36Resorts & developmentResort & Destination Development Planning Guide
A multi-zone planning reference for resort RFPs covering Apollo systems, project-specific supply, climate, guest operations, logistics and local responsibilities.
Open reference 37Global supplyInternational Kitset Supply Planning
A practical international-supply reference for destination, handover point, packaging, freight scope, receiving requirements, documents, unloading and local responsibilities.
Open referenceUse the current product page, applicable technical documents and project quotation when product-specific specifications, approvals or project performance need to be confirmed.
Technical Document Guide
Use each document within its actual scope.
This reference helps project teams understand how datasheets, test reports, certificates, calculations, drawings and warranties relate to the selected product and project.
| Document type | What it can support | What it does not establish by itself |
|---|---|---|
| Product datasheet / specification | Published dimensions, materials, configurations, components and product-level characteristics stated for the identified model or family. | Prove suitability for every site, local code, wind zone, structural interface or unlisted configuration. |
| Independent test report | The test method, specimen, configuration and measured result recorded by the issuing laboratory for the tested scope. | Automatically extend the result to different sizes, materials, fixings, assemblies or installation conditions. |
| Certificate / product listing | The certification, listing or conformity scope stated by the issuing body, including the products and conditions actually covered. | Cover unrelated models, expired scopes, omitted accessories or project conditions outside the certificate. |
| Engineering calculation | The loads, geometry, material assumptions, supports and calculation basis stated in that specific engineering package. | Transfer automatically to another site, span, substrate, foundation or loading condition unless those items are included and checked. |
| Installation manual | The manufacturer's documented installation, setup, operation or maintenance pathway for the identified product. | Replace site measurement, structural adequacy, local trade competence, statutory approvals or project-specific engineering. |
| CAD / BIM / project drawing | Geometry, coordination, interfaces and dimensions represented in the current drawing or model for design development. | By itself prove structural performance, certification, fire performance or destination compliance unless the document explicitly carries that verified evidence. |
| Warranty document | The stated warranty period, covered components, exclusions, maintenance conditions and claim pathway for the identified product. | Act as independent proof of engineering performance, code compliance or suitability for every environment. |
Use the exact current document for the exact product and configuration. Where available documentation does not cover the project condition, confirm the requirement through project-specific technical review.
Technical Reference & Source Policy
Evidence before assertion.
Apollo publishes technical planning resources to make complex project decisions easier to navigate while keeping primary rules, product evidence, installed outcomes and project engineering properly separated.
Primary sources first
Where a governing body, standards organisation or regulator controls the requirement, Apollo identifies or links to that source and treats it as authoritative for the material it owns.
Evidence types stay separate
A rule, product test, certificate, installed-facility result and project-specific engineering decision are not interchangeable. Apollo keeps those boundaries explicit.
Review dates matter
Technical references carry review or modification information where practical. Final design should use the current source documents and the appropriate project-specific professional review.
Stable citation pathway
Citable resources use stable canonical URLs, identify Apollo NZ Global as publisher and, where appropriate, expose primary references through machine-readable structured data.
Corrections are reviewed
Material factual corrections are checked against the underlying source and the public resource is updated rather than preserving a known technical error.
Use the resource title, Apollo NZ Global as publisher, the displayed edition or review date, and its canonical URL. Cite the original governing body or standards publisher when its rule or document is the underlying authority.
Send the page URL, the specific statement and the source that should be reviewed to sales@apollonzglobal.com.
Apollo Specification & Tender Guide
Write the requirement so technical information and responsibilities stay clear.
This cross-category reference helps architects, consultants and procurement teams describe Apollo systems without turning indicative information into guarantees or hiding project-specific responsibilities inside the product specification.
| Specification area | Include | Avoid |
|---|---|---|
| Product identity | Name the exact Apollo product or system family and the configuration being specified where known. | Do not carry a family-level feature, dimension or certificate across every model by implication. |
| Technical values | Use dimensions, materials, finishes, test results and other values supported by the current product page and applicable technical documents. | Do not convert indicative or different-model information into a project guarantee. |
| Project-dependent requirements | State the project criteria that still need confirmation: loads, exposure, substrate, foundations, services, fixing, local compliance, access or installation conditions. | Do not present an unresolved site condition as though it were already confirmed product performance. |
| Scope + responsibilities | Separate Apollo product supply and any expressly included support from local engineering, site measurement, civil/electrical work, installation and approvals. | Do not hide local project responsibilities inside a generic phrase such as complete system unless the written scope defines them. |
| Alternatives / substitutions | Assess an alternative against application, dimensions/interfaces, materials, current technical information, maintenance, warranty/spares and destination requirements. | Do not treat price, appearance or a broad category match as proof of technical equivalence. |
| Document control | Reference the current Apollo product page, current quotation and current technical documents for the selected product or project package. | Do not allow an old downloaded file or superseded model reference to override current project information. |
Reusable early-stage clauses
Copy the framework, then adapt it to the actual project.
These are generic coordination clauses, not legal advice and not a substitute for the project team's own specification, engineering or statutory review.
Current information clause
Product selection and specification shall be based on the current Apollo product page, current project quotation and current technical documents issued for the selected system. Superseded saved files should not be used where they conflict with current project information.
Technical information clause
Where a project requires stated performance, certification or testing, use current technical information applicable to the exact product and configuration offered. Different sizes, materials, fixings or assemblies may require separate review.
Supply-scope clause
Apollo's quoted scope is product supply and specifically stated supporting information. Site measurement, local engineering, foundations, civil or electrical works, installation and statutory approvals remain with the purchaser's appointed project team unless expressly included in writing.
Alternative / substitution clause
Any proposed alternative shall demonstrate equivalent project suitability against the specified application, dimensions and interfaces, material and finish, technical documentation, warranty and spares, maintenance requirements and destination conditions. Price or visual similarity alone does not establish equivalence.
Technical submittal clause
Technical submittals shall identify the exact product, model, material, finish and configuration offered and shall include the current project-relevant drawings, data sheets, test reports, certificates and other documents requested by the project team. Documents for a different model or configuration should be clearly identified.
Samples and mock-ups clause
Where samples or mock-ups are required, the approved sample or mock-up shall establish the agreed visual, material or assembly reference for the project within its stated scope. Approval of appearance does not by itself establish structural, fire, weather, code or other performance compliance.
Revision and change-control clause
Drawings, schedules and technical documents shall carry a revision or issue date. Any change to dimensions, materials, finishes, loads, interfaces, accessories or other project-critical information after approval shall be identified and reviewed before manufacture or procurement continues.
Packaging and logistics clause
The quoted supply scope shall identify the agreed packaging method, crate or bundle identification, shipping dimensions and project handover point. Import clearance, onward transport, unloading, storage and site movement responsibilities shall remain with the party identified in the written project scope.
Warranty and spare-parts clause
The supplied warranty, exclusions, maintenance conditions, claim pathway and responsible legal entity shall be identified before order. Where lifecycle support is material to the project, spare parts, replacement components and expected replacement lead times shall be confirmed separately.
Product-specific technical values should be checked against the current product page, relevant technical documents and project quotation. Use the Technical Document Guide when reviewing a report, certificate or calculation for a tender requirement.
Search + filter
Find a document or technical pathway.
Public resources stay open to customers and specifiers. Approved trade partners can use the secure portal for partner-only material as it is added.
No current public download matches this product scope. The technical pages below may still contain useful planning information, or send Apollo the exact datasheet, drawing, test, certification, BIM/CAD, warranty or tender requirement you need.
Technical product library
Specifications, planning guidance and current product pages.
These entries stay searchable alongside downloadable files so product information is not hidden simply because a PDF has not been published.
Linkable project resources
Field checklists for better product briefs.
These concise checklists are designed to be bookmarked, shared with project teams and linked directly from specifications, club notes, school planning documents or partner resources. Each checklist points to the fuller Apollo planning guide.
LUTHVAR sports-turf project checklist
Capture the field and technical requirements before the exact turf construction is selected.
- Primary sport and level of play
- Field footprint and shared-use requirements
- Federation / tender requirement
- Base, levels and drainage status
- Water, infill and shock-layer strategy
- Goals, perimeter, lighting and spectators
- Maintenance, installation and testing responsibilities
Professional procurement templates
Use these working templates when a project needs a repeatable procurement or document-management structure.
- International project procurement checklist
- Technical submittal register
- International project RFP checklist
- Copy, CSV download and print / save PDF pathways
Sports court surface briefing checklist
Use this before comparing modular tile and roll-out surfaces.
- Existing base material and condition
- Falls, drainage and ponding
- Primary and secondary sports
- User groups and operating intensity
- Maintenance and repair pathway
Pickleball conversion briefing checklist
Capture the whole playing envelope before choosing a surface.
- Usable footprint and run-off
- Existing hardstand condition
- Permanent or staged conversion
- Net, fence and access layout
- Lighting and future expansion
Modular pump track site checklist
Define the rider group and surrounding site as well as the track footprint.
- Rider ages and progression
- Usable footprint and levels
- Drainage and surrounding surface
- Delivery and assembly access
- Supervision, circulation and expansion
All-season ski facility briefing checklist
Define the training programme, site geometry and operating model before selecting SLOPEspan terrain.
- Target disciplines and athlete levels
- Available length, width, levels and gradient
- Dry, wet-assist or snow-over operating intent
- Base, drainage, water, power and access
- Coaching, viewing, run-out, safety and future expansion
Stadium seating & grandstand project brief checklist
Define the venue, spectator system and local project interfaces before a seating layout is treated as a procurement package.
- Venue type, operating model and intended spectator capacity
- Preferred seating / bleacher / retractable / grandstand pathway
- Room or site drawings, levels and available footprint
- Client-side aisle, access, accessibility and egress criteria
- Structure, foundations, roof / exposure and engineering interfaces
- Destination, freight handover, receiving and local installation team
Outdoor blind opening checklist
Record the structural and operating details that width × drop alone cannot answer.
- Clear width and drop
- Cassette and guide fixing zones
- Exposure and weather direction
- Fabric outcome: shade, view, privacy or rain
- Manual, motorised or smart-control pathway
Outdoor roof specification checklist
Coordinate structure, drainage and future enclosure before accessories.
- Freestanding, wall-mounted or roof-only
- Overall dimensions and support points
- Rainwater discharge pathway
- Future blinds, glass or walls
- Controls, lighting and local engineering interface
SVALDR elemental outdoor project checklist
Coordinate the complete landscape before individual fire, water, screen or planter products are frozen.
- Site plan, main views and circulation
- Fire / cooking fuel and hot-zone intent
- Water, drainage and maintenance access
- Planting, soil, irrigation and filled loads
- Screen sightlines, lighting, services and exposure
Modular pool delivery and site checklist
Plan the final position together with the transport and lifting route.
- Pool size and installation level
- Truck and crane access
- Foundation and local drainage
- Filtration, heating and service access
- Deck, barrier and local pool-safety interfaces
Expandable building destination checklist
Turn the intended use and destination into a project-ready building brief.
- Operational use and occupancy
- Room, wet-area and service needs
- Climate and exposure
- Foundation, utilities and unloading
- Local engineering and approval responsibilities
International supply document checklist
Define the handover point, receiving party and required documents before shipment.
- Destination and receiving point
- Importer and customs responsibility
- Final product list and packing scope
- Required drawings, manuals and certificates
- Onward transport, unloading and storage
Resort & destination-development RFP checklist
Give Apollo enough project context to review suitable systems and any additional product requirements without turning the brief into a generic product list.
- Destination, project stage, key count or overall development scale
- Drawings, BOQ or product schedules where available
- Required project zones and approximate quantities
- Climate, coastal exposure and known technical requirements
- Programme, freight constraints, receiving and local installation responsibilities
Rooftop camping and vehicle fitment checklist
Treat vehicle limits and travel rhythm as the hard boundaries of the setup.
- Exact vehicle, year and rack system
- Published roof and payload limits
- Tent and awning configuration
- Water, storage and electrical additions
- Full setup and pack-down test
Pickup canopy fitment checklist
Confirm the pickup and complete touring role before freezing a TerraRise configuration.
- Make, model, year, market and cab
- Bed / tray length and current accessories
- Canopy-only or rooftop-camping intent
- Finished payload and storage plan
- Photos, fitment notes and local vehicle requirements
Outdoor live-fire site checklist
Plan the cooking zone, guest zone and local fire responsibilities before fixing the location.
- Cooking format and service pattern
- Stable non-combustible support strategy
- Fuel handling and storage
- Wind, smoke and guest circulation
- Cleaning, maintenance and local fire review
Interactive planning tools
Use the technical centre with the project tools.
PP tile or roll-out flooring?
Compare existing base, drainage, replaceability, continuous finish, maintenance and sport-specific feel.
How many courts fit the site?
Use the Sports Court Planner to turn the available footprint into a better first brief.
Standard or custom CADARN?
Configure dimensions, mounting, controls and enclosure intent before requesting review.
Rotating louvres or a roof that physically retracts?
Use the APERTA configurator when the project needs a retractable aluminium roof, open-sky operation and standalone, wall-mounted or roof-only pathways.
Which RIDEspan layout pathway?
Match the available site, rider group and deployment goals using the Pump Track Planner.
Architect & specifier workflow
Turn product information into a project pack.
Use the dedicated architect/specifier pathway for early product coordination, then save products to My Project, compare systems and build a Tender & Specification Pack for project review.
Approved trade & project partners
Trade / Partner Portal.
Approved partners receive dedicated access to trade resources, project support, product data and partner-only material. Public customers do not need an account to use this Technical Library.
Public Technical Library · no account requiredNext public step
Turn the technical research into a project decision.
Send Apollo the current drawings, dimensions, quantity and destination when the project is ready for manual review.
Still comparing?
Move back into product discovery.
Use the product search to narrow systems by project need, or browse the full product directory before building the brief.
