The released pool should match the approved standard size, installation pathway and selected options recorded for the project.
Start Project BriefAuremont Pre-Dispatch + Project Release
Auremont project release should connect the configured pool, current documents, equipment, logistics information and dispatch record. The exact factory test procedures and numerical acceptance criteria remain tied to the supplied configuration and current supporting evidence.
The released pool should match the approved standard size, installation pathway and selected options recorded for the project.
Use the current project CAD and final equipment / option schedules rather than generic catalogue drawings or an earlier configuration.
Where supplied with the order, completion photographs can record the finished shell, exterior, equipment bay and selected options before packing.
The packed pool should be checked against the final supplied-scope record, including selected equipment and project-specific accessories.
Shipping dimensions, configured dry weight, lifting information and receiving requirements must be taken from the current order documents before crane planning.
Packing / loading information should identify the configured unit and any separately packed accessories or documentation travelling with the order.
Project release evidence
The purpose of the release pack is traceability: the receiving team should be able to see what pool was released, what was included and which current project documents apply to it.
Standard size, project / order reference and current released configuration
Visible finish, selected colour / cladding pathway and obvious transport-sensitive areas
Installed / supplied equipment against the final schedule, with access preserved
Presence, location and released project details where the option is included
Baja shelf, spa division, steps or other project-selected internal configuration where applicable
Correct manual, automatic or sliding-deck pathway and separately packed components where applicable
Configured controls, lighting and related equipment where included in the supplied package
Current shipping envelope, dry weight and lifting / receiving information for the configured unit
Pool unit plus any separately packed equipment, accessories, manuals or project documents
Approved CAD, equipment schedule, operating / care information and warranty information available for the supplied package
Evidence rule
Factory tests can be valuable evidence, but the exact test method, specimen, duration, acceptance criteria and configuration matter. Auremont only relies on a test or certificate where the current supporting information applies to the supplied product or project.
Only state the exact factory test method, duration and acceptance criteria after they are confirmed for the supplied configuration.
Record the factory test scope only where it is confirmed for the installed equipment and destination electrical configuration.
Do not imply a full operating test unless the actual equipment and test process are documented for the order.
Automatic / sliding-cover operating tests and any safety or load evidence must be tied to the exact supplied cover.
Do not publish leak, pressure or structural performance claims without current evidence for the actual panel / installation.
Use current material, coating and test information applicable to the supplied components and exposure pathway.
Dispatch-to-site handoff
The destination team still needs to confirm receiving, crane setup, prepared support, local connections and commissioning. The release pack should be kept with the project record through handover.