Auremont Pre-Dispatch + Project Release

Know what should be confirmed before the pool leaves the factory.

Auremont project release should connect the configured pool, current documents, equipment, logistics information and dispatch record. The exact factory test procedures and numerical acceptance criteria remain tied to the supplied configuration and current supporting evidence.

01

Configured-order record

The released pool should match the approved standard size, installation pathway and selected options recorded for the project.

02

Approved project documents

Use the current project CAD and final equipment / option schedules rather than generic catalogue drawings or an earlier configuration.

03

Visual completion evidence

Where supplied with the order, completion photographs can record the finished shell, exterior, equipment bay and selected options before packing.

04

Equipment + accessory record

The packed pool should be checked against the final supplied-scope record, including selected equipment and project-specific accessories.

05

Transport + lifting information

Shipping dimensions, configured dry weight, lifting information and receiving requirements must be taken from the current order documents before crane planning.

06

Packing + dispatch record

Packing / loading information should identify the configured unit and any separately packed accessories or documentation travelling with the order.

Project release evidence

Keep the order identity and the evidence together.

The purpose of the release pack is traceability: the receiving team should be able to see what pool was released, what was included and which current project documents apply to it.

01

Pool identity

Standard size, project / order reference and current released configuration

02

Shell + finish

Visible finish, selected colour / cladding pathway and obvious transport-sensitive areas

03

Equipment bay

Installed / supplied equipment against the final schedule, with access preserved

04

Viewing window

Presence, location and released project details where the option is included

05

Internal layout

Baja shelf, spa division, steps or other project-selected internal configuration where applicable

06

Cover system

Correct manual, automatic or sliding-deck pathway and separately packed components where applicable

07

Controls + lighting

Configured controls, lighting and related equipment where included in the supplied package

08

Logistics data

Current shipping envelope, dry weight and lifting / receiving information for the configured unit

09

Packing list

Pool unit plus any separately packed equipment, accessories, manuals or project documents

10

Project documents

Approved CAD, equipment schedule, operating / care information and warranty information available for the supplied package

Evidence rule

Do not turn an unconfirmed factory capability into a public performance claim.

Factory tests can be valuable evidence, but the exact test method, specimen, duration, acceptance criteria and configuration matter. Auremont only relies on a test or certificate where the current supporting information applies to the supplied product or project.

Water / leak testing

Only state the exact factory test method, duration and acceptance criteria after they are confirmed for the supplied configuration.

Electrical / control testing

Record the factory test scope only where it is confirmed for the installed equipment and destination electrical configuration.

Heating / filtration run test

Do not imply a full operating test unless the actual equipment and test process are documented for the order.

Cover cycle testing

Automatic / sliding-cover operating tests and any safety or load evidence must be tied to the exact supplied cover.

Viewing-window test evidence

Do not publish leak, pressure or structural performance claims without current evidence for the actual panel / installation.

Coating / corrosion evidence

Use current material, coating and test information applicable to the supplied components and exposure pathway.

Dispatch-to-site handoff

Release documentation should support the next team, not stop at the factory gate.

The destination team still needs to confirm receiving, crane setup, prepared support, local connections and commissioning. The release pack should be kept with the project record through handover.

01Configured pool released
02Packing + logistics record
03Freight / receiving
04Crane placement
05Local connections
06Commissioning + handover