ORDRAN PLUNGE · Compact architectural pools
Compact water architecture for villas, courtyards, suites and smaller premium spaces.
ORDRAN PLUNGE is the compact project family for private villas, suites, courtyards, glamping and smaller wellness spaces. It prioritises efficient dimensions, integrated equipment and architectural finish without reducing the pool to a generic spa product.

Product details
ORDRAN PLUNGE project framework
These are the fields the final project will control. Numerical values and performance claims remain tied to the selected production system and documented project information.
ORDRAN is supply-only and does not include physical site inspection. Apollo reviews the product against dimensions, drawings, photos, access information and intended use supplied by the purchaser. The purchaser independently arranges and manages all onsite works, installation, services, approvals and commissioning.
ORDRAN technical sheet
ORDRAN PLUNGE · compact framed pool

FRAMED POOL PROJECT SYSTEM
Specify the pool, the site interface and the receiving plan together.
ORDRAN PLUNGE is more useful when treated as a coordinated project package rather than a shell dropped onto site. The documented pool construction stays fixed; equipment, integration and local works are resolved around the actual project.INSTALLATION RELATIONSHIP
Three project interfaces. None should be guessed on site.
Use the framed pool as an architectural object on a compliant concrete base, while protecting the WPC finish and keeping plant, pipework and inspection access serviceable.
Coordinate deck levels and finishes around the pool without assuming the pool cladding is a deck support. Local deck structure, drainage and access panels remain project-designed.
Possible only where local engineering resolves retaining, drainage, moisture exposure and future service access. Do not treat the framed WPC system as an automatically fully-inground pool.
Documented framed-pool base: fully hardened C25 concrete or higher, minimum 150 mm thickness and level tolerance ≤3 mm/m. Local soil, reinforcement, drainage, seismic, flood and other site engineering remain with the destination project team.
CONFIGURED EQUIPMENT
Freeze named equipment before production release.
These are configuration pathways, not automatic standard inclusions. Brand, model, capacity, voltage, controls and warranty must be confirmed in the final equipment schedule.
LIFTING + LOGISTICS CONTROL
The finished pool is lifted from its structural frame — not its finishes.
FROM BRIEF TO SWIMMING
A controlled six-stage project pathway.
Confirm destination, intended use, available envelope, installation relationship, window intent, equipment and access.
Freeze the selected PLUNGE or LINEAR architecture and identify project-specific options and interfaces.
Confirm production drawing, base information, named equipment schedule, services and destination requirements.
Confirm packed envelope, dry weight, route, local crane plan, rigging information and receiving sequence.
The destination team prepares the base, lifting operation, placement, connections, barriers and local approvals.
Complete the documented post-install full-water leakage check, then local commissioning and handover.
WHICH FRAMED POOL?
ORDRAN PLUNGE or ORDRAN LINEAR?
ORDRAN PLUNGE · Villas · suites · courtyards · glamping · compact wellness
ORDRAN LINEAR · Long plots · villas · boutique hospitality · compact lap use
PLUNGE POOLS NZ · VERIFIED PRODUCT PATHWAY
Plan a compact plunge pool around real dimensions, access and use.
New Zealand purchasers comparing plunge pools with full-size swimming pools can start with this documented ORDRAN PLUNGE configuration. Unlike an unverified modular concept, this reference has a dedicated technical sheet. Suitability still depends on the actual site and completed manufacturer quotation.
How large is the documented pool?
The ORDRAN PLUNGE reference has an external footprint of 3.9 × 2.2 m and an internal water-body size of 3.0 × 2.0 m. The recorded framed reference includes a tempered-glass viewing window; project-specific final dimensions and inclusions are confirmed from the current drawings.
Is it suitable for a small NZ section?
Begin with a dimensioned layout showing boundaries, the house, access, deck circulation, foundations, pool services and maintenance space. The pool can be compact without being a simple no-works installation; local safety, fencing and building requirements remain site-specific.
How does delivery and lifting work?
Confirm truck and crane access, weight from the exact packed technical schedule, crane radius, overhead obstructions, placement sequence, site bearing and the contractor's lifting plan. An indicative footprint is not proof that the pool can reach its final location.
What should an NZ supply quotation include?
Provide your site town, plan, pool footprint, intended use, installation arrangement, water-treatment and electrical requirements, lifting/access photographs and preferred programme. Request the documented PLUNGE technical product pack and a written scope of the proposed supply.
Apollo supplies the selected product and available documents. The purchaser separately appoints local pool, civil, electrical, lifting and compliance professionals.
ORDRAN PROJECT QUESTIONS
What to know before configuring ORDRAN PLUNGE.
What construction family is ORDRAN PLUNGE?
The documented PLUNGE configuration uses WPC exterior cladding, a galvanized-steel support frame, a seamless FRP liner and a tempered-glass viewing-window pathway. Final equipment and project interfaces are confirmed for the supplied configuration.
What base does the documented ORDRAN PLUNGE require?
The current framed-pool installation documentation requires fully hardened C25 concrete or higher, at least 150 mm thick and level to within 3 mm per metre. Local soil, reinforcement, drainage and other site engineering remain with the destination project team.
Can ORDRAN PLUNGE be deck integrated or partially recessed?
Deck integration and partial recessing can be project pathways, but the local design must preserve structural support, drainage, moisture control and future service access. The framed WPC construction should not be assumed to be an automatically fully-inground pool.
Is ORDRAN a standard-size pool range?
No. ORDRAN is the made-to-measure architectural pool pathway. Final length, width, depth and internal geometry remain bounded by the selected construction system, structural requirements, manufacturing limits, freight and the approved project documents.
Does ORDRAN include installation?
ORDRAN is supply-only. Foundations, lifting, placement, local installation, electrical, plumbing, barriers, approvals and commissioning remain with the client and local project team unless the written quotation expressly includes something different.
Does ORDRAN carry out physical site inspections?
No. Project review is remote and uses dimensions, drawings, photographs, levels, access and crane information, destination details and other project information supplied by the client and local project team.
How is an ORDRAN pool project started?
Start with the architectural pool brief: intended use, desired geometry, edge condition, viewing-window intent, water systems, access, destination and project stage. The closest ORDRAN production pathway is then configured around that brief.
Applications + project fit
Designed around the project brief.
Small footprint, proper pool logic
Circulation, treatment, heating and maintenance access remain part of the design even where the water footprint is compact.
Hospitality-ready pathway
Suitable configurations can be repeated across premium suites, villas or glamping units with controlled equipment and finish schedules.
Window option
Selected raised or deck-edge arrangements can incorporate viewing windows once panel engineering is documented for the project.
Compact framed construction
The current 3.9 m configuration gives ORDRAN a documented small-pool construction pathway using WPC exterior cladding, galvanized-steel framing and a seamless FRP liner.
Wellness adjacency
Compact pools can connect naturally to hot/cold, spa and recovery briefs where the equipment strategy supports the intended use.
Connected project pathway
Everything you need to take the next project step.
Made-to-measure architectural pools developed around project geometry, infinity or overflow edges, windows, water systems, wellness functions and destination logistics.
Open pathway Selection guideAUREMONT vs ORDRAN Pool Selection GuideChoose the pool family from fixed standard geometry versus made-to-measure architectural requirements before detailed specification begins.
Open pathway Project briefORDRAN Architectural Pool Project BriefCompile geometry, edge, window, water-system, access and destination requirements.
Open pathway Technical1 technical documentOpen the technical documents connected to this product or system.
Open pathway Project briefORDRAN Architectural Pool Project BriefCompile made-to-measure geometry, architectural intent, water systems, logistics and project-stage information for review.
Open pathwayReview this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.
Ready to review the project?
