Lifting is a structural task
The handling plan must follow the pool's actual structural frame and approved production information.
Start Project BriefORDRAN Technical Library · Lifting + Handling
Current framed-pool instructions require lifting forces to be carried by the steel frame. WPC cladding, viewing glass and the FRP liner are not lifting points.
Technical planning information · final project documents control.Product details
Apply these requirements only to the pool construction or project condition they relate to. Final project drawings, local engineering and component documents govern.
ORDRAN is supply-only. Local engineering, foundations, lifting, installation, utilities, barriers, approvals and commissioning remain destination project responsibilities unless expressly included.
Applications + project fit
The handling plan must follow the pool's actual structural frame and approved production information.
Viewing windows must be isolated from sling contact, impact and twisting during handling.
WPC, gel coat and exposed pool finishes require soft protection and controlled rigging.
ORDRAN is supply-only; crane selection, operator, lift planning and local safety controls remain with the destination project team.
Connected project pathway
Made-to-measure architectural pools developed around project geometry, infinity or overflow edges, windows, water systems, wellness functions and destination logistics.
Open pathway Selection guideAUREMONT vs ORDRAN Pool Selection GuideChoose the pool family from fixed standard geometry versus made-to-measure architectural requirements before detailed specification begins.
Open pathway Project briefORDRAN Architectural Pool Project BriefCompile geometry, edge, window, water-system, access and destination requirements.
Open pathway TechnicalORDRAN Technical CentreReview current ORDRAN construction families, base, lifting, water-system, QA, warranty and project-information resources.
Open pathway Project briefORDRAN Architectural Pool Project BriefCompile made-to-measure geometry, architectural intent, water systems, logistics and project-stage information for review.
Open pathwayReview this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.
No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.
Ready to review the project?