Protect the pool structure by lifting from the intended structural load path.

Current framed-pool instructions require lifting forces to be carried by the steel frame. WPC cladding, viewing glass and the FRP liner are not lifting points.

Lift from steel frame onlyTwo lifting points each sidePre-installed lifting lugsProject lifting plan required
ORDRAN architectural pool technical informationTechnical planning information · final project documents control.

Product details

Current technical guidance

Apply these requirements only to the pool construction or project condition they relate to. Final project drawings, local engineering and component documents govern.

01Load path
Steel support frameCurrent ORDRAN handling instruction for the framed WPC pool family.
02Lifting points
Two points per side · lugs pre-installedCurrent documented handling information. Final sling geometry, centre of gravity and crane plan remain shipment-specific.
03Do not lift from
WPC cladding · glass · FRP linerThese elements are not intended to carry sling forces.
04Project data still required
Dry weight · CoG · rigging geometryThese remain configuration-specific release documents.
05Receiving
Local crane / forklift planDestination contractor confirms plant, access, ground bearing and exclusion zones.

ORDRAN is supply-only. Local engineering, foundations, lifting, installation, utilities, barriers, approvals and commissioning remain destination project responsibilities unless expressly included.

Applications + project fit

How to use this information.

Lifting is a structural task

The handling plan must follow the pool's actual structural frame and approved production information.

Protect glazing

Viewing windows must be isolated from sling contact, impact and twisting during handling.

Protect finished surfaces

WPC, gel coat and exposed pool finishes require soft protection and controlled rigging.

Destination responsibility

ORDRAN is supply-only; crane selection, operator, lift planning and local safety controls remain with the destination project team.

Applications
Project planningArchitects + specifiersLocal contractorsResort developersPool project teamsInternational supply

Connected project pathway

Everything you need to take the next project step.

ORDRAN · Architectural Pool Systems
Related pathwayProject Upload Tool
Regional project pathwayORDRAN Architectural Pool Systems for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Technical informationNeed a datasheet, drawing, test report or tender submittal?

No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.

Request technical information

Ready to review the project?

Send the dimensions, quantity, destination and the information you already have.

Apollo NZ Global

New Zealand + international project supply. Practical product pathways.
Apollo NZ Global is supply-only unless a written project scope states otherwise.

sales@apollonzglobal.com
Project