Apollo NZ GlobalBuild Project Brief

Apollo public reference index · permanent links

Project standards, templates, checklists and matrices in one stable index.

This is the public link directory for Apollo's professional project resources. Consultants, contractors, procurement teams, manufacturers and project partners can bookmark one page, then link directly to the exact standard, checklist, working template or comparison matrix they need.

6public standards
4working templates
16project checklists
15comparison matrices
5specification tools

01 · Apollo public standards

Rules that control how Apollo briefs, specifies, verifies and publishes.

These are durable operating references. They define the information standard and evidence boundary before a product or supplier claim is carried into a project.

01Project briefing

Apollo Project Brief Standard

Separates the minimum useful project brief from stronger review information and later-stage specification, freight and document requirements.

Open standard
02Specification

Apollo Specification & Tender Standard

Cross-category framework for product identity, verified technical data, project-dependent requirements, local responsibilities, substitutions and document control.

Open standard
03Technical evidence

Technical Evidence Guide

Explains what datasheets, test reports, certificates, calculations, manuals, drawings and warranties can support — and where their scope stops.

Open standard
04Supplier review

Apollo Supplier Qualification Standard

Public manufacturer-review framework covering identity, production capability, technical evidence, export readiness, project support and lifecycle support.

Open standard
05Manufacturer evidence

Manufacturer Submission Evidence Standard

Public evidence standard for manufacturers covering product identity, model applicability, specifications, drawings, testing, certification, engineering, warranty, QC, export packaging and project support.

Open standard
06Evidence publication

Project Evidence Publication Standard

Rules separating verified case studies, anonymised evidence, representative applications and planning frameworks so public project claims stay evidence-based.

Open standard

02 · Working templates

Reusable project-control tools for real procurement work.

Open the live template to copy it, download CSV or print / save PDF. Direct anchors remain stable so teams can link to the exact tool.

01Working template

International Project Procurement Checklist

A working checklist for scope, evidence, commercial terms, quality control, logistics, local responsibilities and handover.

Open template
02Working template

Supplier Due-Diligence Checklist

A structured review of supplier identity, manufacturing ownership, engineering, technical evidence, quality, export readiness, warranty and lifecycle support.

Open template
03Working template

Technical Submittal Register Template

A document-control template for requested, received, reviewed and approved technical project information.

Open template
04Working template

International Project RFP Checklist

A structured international project brief covering site, drawings, scope, performance, climate, documentation, programme, freight and local works.

Open template

03 · Project checklists

Briefing prompts that lead into the deeper authority guide.

The checklist itself has a permanent anchor in the Technical Centre. Each one also links onward to the full planning guide so the short reference and deeper explanation stay connected.

01

Professional procurement templates

Use these working templates when a project needs a repeatable procurement, supplier-review or document-control structure.

  • International project procurement checklist
  • Supplier due-diligence checklist
  • Technical submittal register
  • International project RFP checklist
02

Sports court surface briefing checklist

Use this before comparing modular tile and roll-out surfaces.

  • Existing base material and condition
  • Falls, drainage and ponding
  • Primary and secondary sports
  • User groups and operating intensity
03

Pickleball conversion briefing checklist

Capture the whole playing envelope before choosing a surface.

  • Usable footprint and run-off
  • Existing hardstand condition
  • Permanent or staged conversion
  • Net, fence and access layout
04

Modular pump track site checklist

Define the rider group and surrounding site as well as the track footprint.

  • Rider ages and progression
  • Usable footprint and levels
  • Drainage and surrounding surface
  • Delivery and assembly access
05

All-season ski facility briefing checklist

Define the training programme, site geometry and operating model before selecting SLOPEspan terrain.

  • Target disciplines and athlete levels
  • Available length, width, levels and gradient
  • Dry, wet-assist or snow-over operating intent
  • Base, drainage, water, power and access
06

Stadium seating & grandstand project brief checklist

Define the venue, spectator system and local project interfaces before a seating layout is treated as a procurement package.

  • Venue type, operating model and intended spectator capacity
  • Preferred seating / bleacher / retractable / grandstand pathway
  • Room or site drawings, levels and available footprint
  • Client-side aisle, access, accessibility and egress criteria
07

Outdoor blind opening checklist

Record the structural and operating details that width × drop alone cannot answer.

  • Clear width and drop
  • Cassette and guide fixing zones
  • Exposure and weather direction
  • Fabric outcome: shade, view, privacy or rain
08

Outdoor roof specification checklist

Coordinate structure, drainage and future enclosure before accessories.

  • Freestanding, wall-mounted or roof-only
  • Overall dimensions and support points
  • Rainwater discharge pathway
  • Future blinds, glass or walls
09

SVALDR elemental outdoor project checklist

Coordinate the complete landscape before individual fire, water, screen or planter products are frozen.

  • Site plan, main views and circulation
  • Fire / cooking fuel and hot-zone intent
  • Water, drainage and maintenance access
  • Planting, soil, irrigation and filled loads
10

Modular pool delivery and site checklist

Plan the final position together with the transport and lifting route.

  • Pool size and installation level
  • Truck and crane access
  • Foundation and local drainage
  • Filtration, heating and service access
11

Expandable building destination checklist

Turn the intended use and destination into a project-ready building brief.

  • Operational use and occupancy
  • Room, wet-area and service needs
  • Climate and exposure
  • Foundation, utilities and unloading
12

International supply document checklist

Define the handover point, receiving party and required documents before shipment.

  • Destination and receiving point
  • Importer and customs responsibility
  • Final product list and packing scope
  • Required drawings, manuals and certificates
13

Resort & destination-development RFP checklist

Give Apollo enough project context to qualify existing systems and source missing categories without turning the brief into a generic product list.

  • Destination, project stage, key count or overall development scale
  • Drawings, BOQ or product schedules where available
  • Required project zones and approximate quantities
  • Climate, coastal exposure and known technical requirements
14

Rooftop camping and vehicle fitment checklist

Treat vehicle limits and travel rhythm as the hard boundaries of the setup.

  • Exact vehicle, year and rack system
  • Published roof and payload limits
  • Tent and awning configuration
  • Water, storage and electrical additions
15

Pickup canopy fitment checklist

Confirm the pickup and complete touring role before freezing a TerraRise configuration.

  • Make, model, year, market and cab
  • Bed / tray length and current accessories
  • Canopy-only or rooftop-camping intent
  • Finished payload and storage plan
16

Outdoor live-fire site checklist

Plan the cooking zone, guest zone and local fire responsibilities before fixing the location.

  • Cooking format and service pattern
  • Stable non-combustible support strategy
  • Fuel handling and storage
  • Wind, smoke and guest circulation

04 · Comparison matrices

Direct links to Apollo's comparison tables and decision frameworks.

Knowledge-centre matrices are discovered from the live resource registry, so this section expands automatically as new matrix-backed authority guides are added.

01
Architecture

Architectural Façade System Selection Matrix

Compare the design role, application, ventilation, shaping potential, weight consideration and key review issue across façade system families.

Open matrix
02
Climate & Global Projects

International project document register

Use this as a starting structure. Not every project needs every document, and additional jurisdiction-specific evidence may be required by the local project team.

Open matrix
03
Climate & Global Projects

International supply handover comparison

The quote should state the actual handover point. These common structures change which freight and receiving tasks sit inside the supplied scope and which remain with the purchaser or local project team.

Open matrix
04
Climate & Global Projects

Regional project-planning comparison matrix

This is a question-setting framework only. It highlights issues that often deserve early attention; it does not describe every project or replace country-specific engineering and statutory review.

Open matrix
05
Climate & Global Projects

Resort development zone planning matrix

Use this matrix to identify the dominant project questions in each zone before sourcing begins. It is a briefing tool, not a fixed package or promise that every category will be supplied on every project.

Open matrix
06
Climate & Global Projects

Supplier qualification evidence matrix

Use this matrix before a supplier is relied upon for a significant project. The required depth should increase with structural, safety, technical, programme and commercial risk.

Open matrix
07
Global projects

Global Market × Product Capability Matrix

Live market-by-market view of Apollo product priorities across the controlled regional product matrix.

Open matrix
08
Global projects

Global Project Readiness Matrix

International-project comparison covering destination, climate, local requirements, freight handover, site interfaces and controlled receiving documents.

Open matrix
09
Outdoor Living & Architecture

Outdoor blind material pathway comparison

Use this as an early comfort-and-use comparison. Exact fabric construction, openness, dimensions, wind behaviour and weather performance remain model- and project-specific.

Open matrix
10
Pools & Wellness

Modular pool installation relationship matrix

The same modular pool can create very different site interfaces depending on how it relates to ground level, decks and surrounding structures. Use this matrix before foundations and landscaping are frozen.

Open matrix
11
Public Realm & Development

Tender readiness control matrix

Use the matrix to check whether the tender package is ready to compare like with like. It does not replace the project contract, consultant documents or destination-specific procurement requirements.

Open matrix
12
Sports & Courts

Modular tile vs roll-out sports flooring

The two pathways solve the playing surface differently. This table keeps the comparison at project-planning level so the exact product can be verified later.

Open matrix
13
Sports & Courts

Rubber gym tiles vs rubber rolls — planning matrix

This matrix compares the practical role of each format within a commercial gym. It does not prescribe thickness, density or impact performance, which remain product- and project-specific.

Open matrix
14
Sports & Courts

Sports flooring family comparison matrix

Use this as an early planning reference. It compares the role each broad surface family can play before a specific product, thickness, fixing method or project-dependent performance requirement is selected.

Open matrix
15
Stadium & venue

Stadium Seating & Grandstand Selection Matrix

Compare portable bleachers, retractable seating, aluminium and steel grandstands, covered stands and fixed stadium seating before project-specific layout.

Open matrix

05 · Specification toolkit

Clauses and schedules for tender, substitution and technical review.

These resources sit between the project brief and the final project-specific specification. They are designed to preserve evidence, deviations, responsibilities and unresolved requirements through procurement.

01clauses

Generic Specification Clauses

Copyable early-stage clauses for current information, evidence, supply scope, substitutions, submittals, mock-ups, revision control, logistics, warranty and spares.

Open toolkit resource
02template

Product Substitution Review Template

A structured comparison of specified requirements, proposed alternatives, technical evidence, lifecycle support and declared deviations.

Open toolkit resource
03request

Product Evidence Request Form

A project-focused request schedule that ties each evidence request to the exact product, configuration, claim and standard being checked.

Open toolkit resource
04request

Manufacturer Technical-Submittal Request

A controlled return schedule for manufacturer technical data, drawings, calculations, tests, manuals, warranty and final project records.

Open toolkit resource
05schedule

Pre-Tender Compliance Schedule

A responsibility and evidence schedule that exposes verified, project-dependent and unresolved requirements before tender comparison.

Open toolkit resource

Reference integrity

One index. Live owners. No frozen duplicate specification.

This directory points to the current Apollo owner resource. It does not copy product performance into a separate uncontrolled document. If a product page, technical file or project quotation is updated, that current source continues to control the project-specific claim.

Open Technical Centre