Skip to main content
Apollo NZ GlobalStart Project Brief

Development & Humanitarian Infrastructure · Free planning guide

International Development & Humanitarian Infrastructure Planning Guide

This guide is designed for project teams, NGOs, contractors, consultants, community organisations and funded programme managers who need to turn a broad infrastructure need into a clearer procurement and delivery brief. It is not a substitute for humanitarian standards, local professional advice or donor procurement rules.

Planning guidance — final supplied configuration remains project-specific.
International project logistics and development infrastructure planning reference
01

Start with people, use and operating conditions

Record who the infrastructure is for, how many people will use it, whether the need is temporary, transitional or permanent, and what services must remain operational after handover.

Avoid starting with a supplier catalogue. Housing, clinics, classrooms and sanitation blocks can use similar structural systems while requiring very different privacy, hygiene, accessibility, fire, utility and maintenance outcomes.

  • Population and user groups
  • Expected service life
  • Daily and peak occupancy
  • Climate and hazards
  • Accessibility and safeguarding needs
  • Local operating and maintenance capability
02

Separate the programme into functional packages

Break the programme into housing, WASH and sanitation, health, education, administration, community facilities, recreation and support infrastructure. This makes it easier to define technical requirements and compare supplier capability without forcing every use into one standard box.

Where several packages share a manufacturing platform, standardise structure, openings, wet areas and service interfaces only where doing so does not compromise the actual use.

03

Define what is manufactured and what remains local

The manufactured package may include structural frames, wall and roof systems, internal finishes, doors, windows, electrical and plumbing preparation, fixtures and documentation. Foundations, external utilities, site drainage, roads, lifting, local installation, approvals and commissioning often remain local responsibilities.

A responsibility matrix is one of the simplest ways to prevent gaps between factory supply and site delivery.

04

Write climate, hazard and logistics into the brief

Country is not enough. Record wind or cyclone exposure, seismic requirements where applicable, heat, humidity, rainfall, salt exposure, flood risk, ground conditions, receiving port, inland road constraints, unloading capability and local storage.

Remote and island projects can fail because logistics and site interfaces were considered after product selection rather than before it.

05

Use recognised standards and the current donor rules

Humanitarian and development projects may be governed by programme-specific standards, donor requirements, local law and procurement rules. Check the current official sources that apply to the actual project rather than copying requirements from an unrelated tender.

Useful starting points include the Sphere / Humanitarian Standards Partnership resources for humanitarian quality and technical standards, UNHCR's Emergency Handbook for emergency-response guidance, UNICEF resources for WASH in emergencies, and the relevant procurement framework where a project is financed by an institution such as the World Bank.

Comparison reference

Infrastructure programme scoping matrix

Use this as an early project brief. It is deliberately broader than a product schedule so operational and local-work gaps become visible before procurement.

Planning criterionHousingWASH / amenitiesHealth / educationShared project requirements
Core inputHousehold mix, unit count, permanence, privacyPopulation, fixture demand, water and wastewaterUsers, room schedule, privacy / supervisionCountry, site, programme, funding and delivery dates
Technical focusStructure, envelope, thermal comfort, wet areasHygiene, drainage, ventilation, cleaning, accessibilityOccupancy, services, fire, accessibility, acousticsClimate, hazards, standards, technical evidence
Local interfaceFoundations, utilities, roads, landscapeWater source, wastewater, external drainageSite access, external services, local operational rulesFreight, unloading, labour, approvals, commissioning
Handover questionCan homes be maintained locally?Can fixtures and services be cleaned and repaired?Can the facility operate with local staff and utilities?Are responsibilities, spares and records clear?

This matrix is a free planning reference. Project-specific humanitarian standards, donor rules, local law and professional requirements take precedence.

Move from knowledge to project

Apply this guidance to the actual site.

Build an international project brief Start Project Brief
Project