Humanitarian & Development Project Procurement Checklist

Use this checklist before issuing an RFQ, comparing modular-building suppliers or releasing a funded infrastructure order. It is designed to expose missing information early and can be shared with consultants, procurement teams and delivery partners.

Planning guidance — final supplied configuration remains project-specific.
International procurement checklist for humanitarian and development infrastructure
01

Confirm the procurement basis

Identify the funding organisation, buyer, contracting entity, procurement method, tender rules, evaluation method, required forms, ethical requirements and submission dates before contacting suppliers.

Do not assume one donor or agency's procurement rules apply to another programme. Use the current official tender and procurement documents for the specific project.

02

Issue a comparable technical scope

Provide the same core brief to each supplier: drawings or room schedules, quantities, destination, performance requirements, services, finishes, documentation, packing and delivery scope.

If suppliers quote different assumptions, normalise those differences before comparing price. A low price based on missing foundations, services, fixtures, documentation or freight is not directly comparable with a more complete package.

03

Request evidence matched to the proposed system

Ask for current drawings, material specifications, structural information where relevant, fire and thermal evidence, quality-control information, installation guidance, project references and legal manufacturing entity details.

Treat maximum marketing claims and one-off landmark projects separately from normal repeatable production capability.

04

Check manufacturing and programme capacity

Large programmes need more than a good sample unit. Confirm realistic monthly output, production lines, quality-control checkpoints, engineering resources, raw-material capacity, inspection access, packing capacity and how the supplier would phase 100, 500, 1,000 or more units.

05

Freeze logistics and handover before release

Confirm Incoterm or handover point, packing method, container loading, labels, packing lists, receiving port, inland movement, unloading, storage, installation instructions, spare parts, warranty documentation and the final responsibility matrix before manufacture begins.

Comparison reference

Supplier comparison checklist

Planning criterionQuestion to verifyEvidence to requestCommon warning sign
Legal supplier identityWho manufactures and contracts?Business registration, factory identity, contract entityTrading name and factory identity remain unclear
Technical capabilityCan the exact project configuration be engineered?Drawings, calculations where relevant, tested system evidenceGeneric brochure claims without configuration-specific support
Quality controlHow is production inspected and recorded?QA process, inspection records, production checkpointsQuality described only as 'high quality'
CapacityCan the programme be produced on the required schedule?Monthly capacity, line allocation, phased production planHeadline annual capacity with no project allocation
LogisticsCan the package reach and be received at the destination?Packing plan, loading quantity, dimensions, weightsFreight considered only after final design
HandoverWhat does the buyer receive after shipment?Manuals, drawings, spares, warranty, packing recordsNo clear document or support package

A procurement checklist helps structure due diligence; it does not certify or approve a supplier.