01Define whether the programme is shelter, transitional housing or permanent reconstruction
Each stage has different expectations for service life, site permanence, foundations, approvals, household amenity and handover. Avoid treating a rapidly deployable shelter product as permanent housing without a full review of the permanent-use requirements.
02Use project-specific wind and site criteria
Do not assume a generic hurricane or cyclone rating transfers between locations or building configurations. Wind criteria, terrain, topography, openings, module arrangement, roof geometry, anchoring and foundations need to be reviewed for the actual project by the responsible professionals.
03Treat the building envelope as part of resilience
Roof edges, flashings, doors, windows, penetrations, drainage and water paths matter alongside the primary frame. Wind-driven rain and opening failure can make an otherwise strong structure uninhabitable.
04Plan for coastal corrosion and post-storm maintenance
Many cyclone-prone communities are also coastal. Coatings, fixings, drainage, inspection access, replacement parts and maintenance frequency should therefore be considered with the local salt and humidity exposure.
05Rebuild community functions as well as houses
Housing recovery may also require sanitation, clinics, classrooms, administration, power, water and community facilities. UNHCR settlement guidance emphasises that shelter, WASH, energy and other settlement services need coordinated planning rather than isolated delivery.