Procurement templates that keep the important project questions visible.

These templates are intentionally practical. Copy them into a project workspace, download them as CSV, or print the page for a working session. They are designed to make scope, evidence, supplier capability, logistics and local responsibilities easier to control before manual quotation or procurement.

01International Project Procurement Checklist02Supplier Due-Diligence Checklist03Technical Submittal Register Template04International Project RFP Checklist

01 · Procurement checklist

International Project Procurement Checklist

Use this before comparing supplier quotations. It keeps project scope, evidence, commercial terms, logistics and destination responsibilities visible so a low headline price does not hide a weak project package.

Review areaRequirement / questionStatusNotes / owner
Project briefDestination, site, intended use, dimensions, quantities and programme are recorded.Open
Project briefDrawings, BOQ, schedules or marked-up project information are attached where available.Open
Product scopeQuoted model, material, finish, configuration, accessories and exclusions are explicit.Open
Product scopeProject-dependent requirements are separated from verified product data.Open
Technical evidenceRequired datasheets, drawings, reports, certificates and calculations are listed.Open
Technical evidenceEvidence applicability to the exact quoted configuration has been checked.Open
CommercialLead time, quote validity, payment terms, warranty and spare-parts pathway are recorded.Open
CommercialSamples, mock-ups, engineering, tooling or inspection charges are identified.Open
QualitySample / mock-up approval, inspection scope and production hold points are defined where needed.Open
LogisticsPackaging, crate / bundle dimensions and shipment method are confirmed.Open
LogisticsHandover point, importer, customs, onward freight, unloading and storage responsibilities are assigned.Open
Local project scopeFoundations, civil works, electrical work, local engineering, installation and approvals are assigned.Open
HandoverPacking records, manuals, warranty, spare-parts list and final project documents are included in handover.Open

This checklist is a project-control aid, not a substitute for the written contract, destination requirements or professional technical review.

02 · Supplier due diligence

Supplier Due-Diligence Checklist

Use this to structure the first serious review of a manufacturer or specialist supplier. The aim is to confirm identity, manufacturing ownership, technical capability, quality control, export readiness and lifecycle support — not to create a simplistic supplier score.

Review areaEvidence to requestStatusClarification / evidence reference
Legal identityLegal company name, registration details, factory location and export entity if different.Open
Manufacturing relationshipConfirm whether the applicant manufactures, subcontracts, distributes or resells the quoted product.Open
Factory capabilityCore processes, machinery, capacity, normal lead time and peak-season constraints.Open
Product ownershipModel ownership, OEM / ODM position, tooling ownership and authority to supply the product.Open
Comparable experienceRelevant projects matching the proposed material, scale, geometry, use or technical risk.Open
EngineeringNamed engineering capability, drawing responsibility, calculations and project-support deliverables.Open
Technical evidenceCurrent specifications, test reports, certificates, materials and installation information.Open
Quality controlIncoming material control, in-process checks, final inspection, non-conformance handling and records.Open
Third-party inspectionWhether independent inspection can be supported and at which production stages.Open
Export readinessPrimary export ports, Incoterms, packaging, container / break-bulk capability and destination experience.Open
WarrantyWritten warranty scope, exclusions, claim process, response pathway and responsible legal entity.Open
Spare partsAvailability period, replacement lead time, identification method and likely service components.Open
Installation supportManuals, remote support, training, site supervision or approved installer network where genuinely available.Open
Commercial relationshipPayment terms, pricing basis, quote validity, exclusivity constraints and non-exclusive cooperation position.Open
Marketing permissionPermission for images, diagrams, project photos and technical information to be used where agreed.Open

A supplier can be credible while still being wrong for a specific project. Final selection should follow the actual project risk, required evidence and destination.

03 · Technical submittal register

Technical Submittal Register Template

Use this to control what has been requested, received, reviewed and approved for the exact project configuration. It is deliberately structured around applicability and revision control rather than the size of the supplier's document folder.

Document / submittalRequired?Supplier file / referenceRevision / dateStatusApplicability / review notes
Product datasheet / specificationYesRequested
Project / shop drawingsProject dependentRequested
Material / finish scheduleProject dependentRequested
Material certificatesProject dependentRequested
Independent test reportsProject dependentRequested
Certification / product listingProject dependentRequested
Structural calculationsProject dependentRequested
Wind / load evidenceProject dependentRequested
Fire-performance evidenceProject dependentRequested
Electrical / controls documentationProject dependentRequested
Installation manualYesRequested
Maintenance / care manualYesRequested
Warranty documentYesRequested
Sample / finish approvalProject dependentRequested
Mock-up approval recordProject dependentRequested
Inspection / QC recordProject dependentRequested
Packing list / crate registerYesRequested
Spare-parts scheduleProject dependentRequested
Final as-supplied document setYesRequested

Required documents vary by product, destination, contract and project stage. A document should only support claims that fall inside its actual model, configuration, material, test and revision scope.

04 · International RFP checklist

International Project RFP Checklist

Use this when sending Apollo a larger international project. It gives enough context to qualify products and manufacturers around the actual destination instead of asking suppliers to quote from a vague product list.

RFP sectionInformation to includeStatusNotes / attachment reference
Project identityProject name, organisation, country, city / island, site and main contact.Open
Project stageConcept, design development, tender, procurement, construction or replacement / upgrade.Open
Project typeResort, sports facility, school, church, public realm, commercial, industrial or other.Open
Drawings / BOQPlans, elevations, sections, schedules, BOQ or marked-up product requirements.Open
Product scopeRequired product families, quantities, dimensions and known configuration preferences.Open
Performance criteriaKnown wind, seismic, fire, electrical, accessibility, acoustic or other criteria supplied by project professionals.Open
Climate / exposureHeat, UV, coastal salt, rainfall, cyclone / hurricane, snow, dust or other material conditions.Open
Finish requirementsColours, coatings, materials, samples, mock-ups and architectural finish expectations.Open
Technical submittalsList the evidence, drawings, calculations, certificates or BIM / CAD required for review.Open
ProgrammeTender date, decision date, target order date, required delivery window and project opening / completion date.Open
Freight destinationNamed port, depot or final delivery point where known.Open
Receiving routeImporter / receiver, onward transport, road / island access, unloading, crane and storage constraints.Open
Local project teamArchitect, consultant, engineer, main contractor, installer or specialist roles where appointed.Open
Local worksFoundations, civil, services, electrical, installation and statutory responsibilities.Open
Commercial requirementsQuotation currency, validity, packaging, warranty, spare parts and any tender return format.Open
AttachmentsPhotographs, surveys, geotechnical information, existing-system data or other relevant project evidence.Open

You do not need every field resolved before sending an RFP. Unknown items should be marked unknown so they remain visible rather than being filled with assumptions.

How to use these resources

Templates organise the review. They do not replace project evidence.

Use current evidence

Link every technical claim to the current product, configuration, document and revision that actually supports it.

Keep unknowns visible

Mark unresolved items as open, unknown or project-dependent rather than allowing supplier assumptions to disappear into the quotation.

Assign responsibility

Name who owns the next action: Apollo, manufacturer, consultant, importer, contractor, installer or client-side project team.