Apollo professional resources · specification workflow
A practical specification toolkit for real project review.
Use these clauses, schedules and request templates before a tender, substitution or technical review becomes difficult to control. The toolkit keeps product identity, technical evidence, responsibilities, revisions, logistics and unresolved project conditions visible without pretending a generic template is a final engineered specification.
Copy the control language, then complete the project-specific requirement.
These clauses are deliberately generic. They are useful for early specifications, tender notes and procurement schedules where evidence and responsibilities need to remain visible.
01GENERAL SPECIFICATION WORDING
Current information clause
Product selection and specification shall be based on the current Apollo product owner page, current project quotation and current technical documents issued for the selected system. Superseded saved files are not controlling where they conflict with current project information.
02GENERAL SPECIFICATION WORDING
Technical evidence clause
Any stated performance, certification or test requirement shall be supported by evidence applicable to the exact product and configuration offered. Results shall not be assumed to extend to untested sizes, materials, fixings or assemblies.
03GENERAL SPECIFICATION WORDING
Supply-scope clause
Apollo's quoted scope is product supply and specifically stated supporting information. Site measurement, local engineering, foundations, civil or electrical works, installation and statutory approvals remain with the purchaser's appointed project team unless expressly included in writing.
04GENERAL SPECIFICATION WORDING
Alternative / substitution clause
Any proposed alternative shall demonstrate equivalent project suitability against the specified application, dimensions and interfaces, material and finish, verified technical evidence, warranty and spares, maintenance requirements and destination conditions. Price or visual similarity alone does not establish equivalence.
05GENERAL SPECIFICATION WORDING
Technical submittal clause
Technical submittals shall identify the exact product, model, material, finish and configuration offered and shall include the current project-relevant drawings, data sheets, test evidence, certificates and other documents requested by the project team. Documents for a different model, configuration or factory shall be clearly identified and shall not be treated as equivalent evidence without review.
06GENERAL SPECIFICATION WORDING
Samples and mock-ups clause
Where samples or mock-ups are required, the approved sample or mock-up shall establish the agreed visual, material or assembly reference for the project within its stated scope. Approval of appearance does not by itself establish structural, fire, weather, code or other performance compliance.
07GENERAL SPECIFICATION WORDING
Revision and change-control clause
Drawings, schedules and technical documents shall carry a revision or issue date. Any change to dimensions, materials, finishes, loads, interfaces, accessories or other project-critical information after approval shall be identified and reviewed before manufacture or procurement continues.
08GENERAL SPECIFICATION WORDING
Packaging and logistics clause
The supplier shall confirm the agreed packaging method, crate or bundle identification, shipping dimensions and project handover point. Import clearance, onward transport, unloading, storage and site movement responsibilities shall remain with the party identified in the written project scope.
09GENERAL SPECIFICATION WORDING
Warranty and spare-parts clause
The supplied warranty, exclusions, maintenance conditions, claim pathway and responsible legal entity shall be identified before order. Where lifecycle support is material to the project, spare parts, replacement components and expected replacement lead times shall be confirmed separately.
These clauses are coordination tools, not legal advice. Final wording should be reviewed against the project contract, jurisdiction, specification structure and appointed professional responsibilities.
02 · Substitution review
Product Substitution Review Template
Use this when a proposed alternative is offered against a named or previously reviewed product. The comparison should test project suitability and evidence, not simply price or visual similarity.
Review area
Specified requirement
Proposed alternative
Evidence / reference
Status
Reviewer comments
Product identity
Open
Application / intended use
Open
Dimensions / geometry / interfaces
Open
Material and finish
Open
Structural / performance criteria
Open
Test reports / certification
Open
Fixing / substrate / service interfaces
Open
Maintenance and cleaning
Open
Warranty and exclusions
Open
Spare parts / replacement pathway
Open
Lead time and manufacturing capacity
Open
Packaging / freight / receiving
Open
Local engineering / statutory review
Open
Declared deviations from the original requirement
Open
Equivalent-looking products are not automatically equivalent project substitutions. The appointed project team remains responsible for accepting or rejecting alternatives against the actual specification and local requirements.
03 · Product evidence request
Product Evidence Request Form
Use this when requesting proof for a particular product claim. It forces the request to identify the exact product, configuration and evidence required instead of asking for a generic certificate folder.
Evidence request
Exact product / configuration
Standard / claim being checked
Required document
Supplier response / file
Applicability review
Status
Product specification
Current datasheet
Requested
Material / substrate
Material evidence
Requested
Finish / coating
Finish data / certification
Requested
Structural performance
Calculation / test report
Requested
Wind / load performance
Calculation / test report
Requested
Fire performance
Test report / certification
Requested
Slip / impact / sports performance
Test report
Requested
Electrical / controls
Technical / conformity document
Requested
Environmental / corrosion exposure
Material / finish evidence
Requested
Warranty
Current warranty document
Requested
Installation requirements
Current installation manual
Requested
Maintenance requirements
Current care / maintenance guide
Requested
Only request evidence that matters to the project. Applicability must be checked against the actual model, size, material, factory, standard and configuration before the evidence is relied upon.
04 · Manufacturer technical submittal
Manufacturer Technical-Submittal Request
Use this as the return schedule when a manufacturer needs to provide a controlled technical package for consultant, contractor or procurement review.
Submittal item
Required level
Project / product applicability
Supplier file / revision
Supplier comments
Review status
Company / legal manufacturing entity
Required
Requested
Product datasheet / specification
Required
Requested
Project / shop drawings
Project dependent
Requested
Material and finish schedule
Project dependent
Requested
Structural calculations
Project dependent
Requested
Independent test reports
Project dependent
Requested
Certificates / listings
Project dependent
Requested
Material certificates
Project dependent
Requested
Quality / inspection plan
Project dependent
Requested
Sample / mock-up submission
Project dependent
Requested
Installation manual
Required
Requested
Electrical / controls information
Project dependent
Requested
Maintenance / care manual
Required
Requested
Warranty and exclusions
Required
Requested
Spare-parts / replacement schedule
Project dependent
Requested
Packaging / crate / bundle schedule
Required before shipment
Requested
Final as-supplied document register
Required at handover
Requested
The required submittal level should match project risk. A supplier document is not accepted merely because it exists; relevance, revision and configuration applicability still need review.
05 · Pre-tender compliance schedule
Pre-Tender Compliance Schedule
Use this before tender issue or supplier comparison to identify what is already verified, what remains project-dependent and who owns each unresolved requirement.
Requirement
Project requirement / reference
Apollo / supplier evidence
Local project-team input
Status
Tender note / action
Product / system identity
Open
Dimensions / configuration
Open
Material / finish
Open
Design loads / structural criteria
Open
Wind / seismic / weather exposure
Open
Fire requirements
Open
Electrical / controls requirements
Open
Accessibility / circulation interfaces
Open
Foundation / substrate / fixing interface
Open
Drainage / services interface
Open
Technical evidence / certificates
Open
Samples / mock-ups
Open
Installation responsibility
Open
Local engineering / statutory approvals
Open
Freight / delivery handover
Open
Unloading / storage / site movement
Open
Warranty / maintenance / spares
Open
Programme / lead time
Open
Commercial exclusions / qualifications
Open
Final tender return requirements
Open
The schedule is designed to expose unresolved items before tender comparison. It does not certify compliance and does not replace review by the project's appointed professionals.
Recommended project workflow
Use the toolkit in sequence when the project needs stronger control.
01Define the requirement
Start with the project brief, current drawings and the actual performance or procurement question.
02Request exact evidence
Ask for documents that apply to the quoted model and configuration rather than a generic certificate folder.
03Review substitutions and submittals
Record deviations, applicability and unresolved local-project responsibilities before acceptance.
04Close the pre-tender gaps
Use the compliance schedule to expose what is verified, what is project-dependent and who owns the next action.
Continue the professional workflow
Connect the toolkit to Apollo's live evidence and project tools.