APOLLO REFERENCE DATA · EDITION 2026.3

Technical planning data built to be read, downloaded and cited.

These public matrices turn Apollo's project logic into stable reference datasets. They are designed for architects, consultants, developers, operators, researchers and machine retrieval systems while keeping governing rules, exact product evidence and project engineering clearly separated.

Evidence before assertion

The matrices organise decisions; they do not turn planning guidance into a product approval, code sign-off or engineering guarantee.

Stable dataset identity

Each dataset has a permanent anchor, named publisher, edition, review date and machine-readable JSON distribution.

Traceable next step

Every row points back to the Apollo owner or technical pathway that carries the detailed project context.

01 · PUBLIC REFERENCE DATASET

Sports Facility Planning Matrix

A cross-sport planning matrix showing the technical workstreams Apollo uses to move from sport rules into a buildable facility brief.

Download JSON
WorkstreamProject questionEvidence boundaryApollo owner
GeometryWhat playing area, run-off, clear height and circulation envelope is required?Use current governing-body rules for the sport; do not infer one sport from another./sports/technical-library
SurfaceWhat base, floor or turf system suits use, climate and maintenance?Exact product performance remains product- and installation-specific./sports-flooring
EquipmentWhich goals, posts, nets, backstops, sockets, padding or officials systems are required?Match approval/certification to exact equipment where required./sports/indoor-equipment-technical-centre
LightingWhat lighting geometry, glare control and maintenance access is needed?Photometric design and local electrical work remain project-specific./sports-lighting
SpectatorsWhat seating, viewing, accessibility and circulation is needed?Capacity, egress and local building requirements remain project-specific./sports-seating-grandstands
StructureWhat foundations, roof clearances, fencing, covers and mounting interfaces are required?Project engineering controls structural design./sports/technical-library
EnvironmentHow do wind, heat, UV, rain, coastal exposure or HVAC affect the facility?Environmental suitability follows exact products and destination./sports/technical-library
OperationsHow will storage, setup, changeover, booking, scoring and maintenance work?Operational planning does not replace product manuals or local procedures./sports/technical-library
EvidenceWhich rules, product documents, test reports and project calculations control release?Keep governing rules, product evidence and project engineering separate./technical-resources#reference-policy
Publisher · Apollo NZ GlobalEdition · 2026.3Reviewed · 4 October 2026Source policy

02 · PUBLIC REFERENCE DATASET

Outdoor Architecture Selection Matrix

A comparison framework for louvre, fixed roof, retractable roof, shade and vertical-screen systems.

Download JSON
SystemControl strategyBest planning fitPrimary evidence gate
ARKENArchitectural rotating / retracting louvre systemsMade-to-measure architectural outdoor rooms and larger project spansStructure, wind, drainage, controls, finish and project drawings
CADARNKitset operable louvre roofResidential-scale standard/limited made-to-measure footprints up to the published CADARN envelopeExact kit configuration, fixing, drainage, controls and accessory compatibility
FASGAR FIXEDPermanent aluminium roofPermanent overhead shelter where opening the roof is not requiredStructure, drainage, finish, electrical/lighting and destination loads
FASGAR RETRACTMotorised retractable fabric roofOpen-sky flexibility with controllable overhead coverMembrane, structure, motor/control, drainage and environmental evidence
KAVORAUmbrella / membrane / awning / retractable shadeHospitality, resort, terrace and commercial shade applicationsWind, structure, fabric/membrane, movement, fixing and drainage
VELARISGuided outdoor blindsConventional vertical solar/privacy/weather screeningOpening geometry, fabric, guides, motor/control, wind and fixing
LUNVIQLarge-format / specialist roller screensFaçade-scale, grouped-control, solar or dual-layer screen pathwaysExact-system wind/fire/fabric/control/solar evidence
Publisher · Apollo NZ GlobalEdition · 2026.3Reviewed · 4 October 2026Source policy

03 · PUBLIC REFERENCE DATASET

Water & WASH Project Matrix

A source-to-operation framework for community, school, health, remote and recovery water and sanitation projects.

Download JSON
StageDesign inputDecision outputEvidence / responsibility
SourceSource type, yield, seasonality and laboratory quality dataSource-water risk and treatment questionsLaboratory/source evidence + destination requirements
DemandUsers, uses, peak periods, autonomy and growthDaily/peak demand planning rangeProject assumptions must be explicit and reviewable
StorageRaw/clean storage need, footprint, height and site loadsStorage class and tank architectureTank structure, foundation and potable-water evidence are exact-project items
TreatmentSource quality and intended usesTreatment train / bypass / reject-water strategyProcess design and equipment evidence remain exact-project
PumpingFlow, pressure, elevation and redundancyDuty point, booster or solar-bore pathwayPump curves, controls and power interface required
DistributionNetwork length, zones, critical users and future growthGravity / boosted distribution architectureHydraulic design and local pipework remain project-specific
WASHUsers, fixtures, accessibility, cleaning, hot water and wastewaterSanitation / shower / hygiene module configurationWHO public-health guidance + destination building/plumbing requirements
CommissioningFunctional tests, water-quality checks and operator trainingHandover and acceptance recordProject-specific commissioning and water-quality verification
OperationsMaintenance capability, spares, cleaning and monitoringO&M plan and ownership scheduleNamed operator responsibilities and current manuals
Publisher · Apollo NZ GlobalEdition · 2026.3Reviewed · 4 October 2026Source policy

04 · PUBLIC REFERENCE DATASET

Modular Development Procurement Matrix

A procurement-control matrix for modular buildings, housing programmes and coordinated building-shell packages.

Download JSON
Control pointWhat must be fixedWhy it mattersPrimary owner
Programme briefCountry, use, quantities, occupancy, areas and programmeSets the correct modular pathway and scale/modular-building-development-systems
System selectionModule/frame type, joining method, storeys and completion levelAvoids forcing every project into one manufacturing format/modular-building-development-systems/modular-buildings
EngineeringWind, seismic, fire, thermal, acoustic and structural criteriaControls frame, envelope, connections and evidence/arvell/technical
EnvelopeRoof, wall, insulation, openings, weatherproofing and corrosion strategyInterfaces determine real building performance/buildings-large-structures/complete-building-package
ServicesElectrical, plumbing, HVAC, hot water and wet-area interfacesSeparates factory-prepared scope from local connection work/modular-building-development-systems
LogisticsPacking, containerisation, road access, lifting and storageA buildable product must also be deliverable/modular-building-development-systems
Local worksFoundations, civil works, erection, utilities and approvalsKeeps supply-only scope explicit/buildings-large-structures/complete-building-package
QA + releaseApproved drawings, BOM, inspections, packing and documentsPrevents preliminary data controlling production/technical-resources
HandoverManuals, spares, commissioning interfaces and owner recordsSupports maintainability after delivery/technical-resources
Publisher · Apollo NZ GlobalEdition · 2026.3Reviewed · 4 October 2026Source policy

05 · PUBLIC REFERENCE DATASET

Project Technology Qualification Matrix

A qualification framework for outdoor displays, LED systems, EV charging and access-control technology where platform capability must be separated from exact-model evidence.

Download JSON
TechnologyFirst project inputsExact evidence gateApollo owner
Outdoor TV / displaySun exposure, ambient temperature, screen size, mounting, destinationPanel identity, finished brightness, thermal design, IP evidence, electrical/EMC and warranty/fisvor/outdoor-technical-centre
LED displayViewing distance, environment, pixel pitch, screen size, structure, service accessModule/cabinet data, power, control, enclosure/environmental evidence and final BOM/fisvor/technical-data
EV chargingVehicle mix, dwell time, site capacity, utilisation, access/payment, climateExact charger, OCPP implementation, certification, metering, derating and backend dependencies/commercial-ev-charging/technical
Vehicle accessLane/use case, duty cycle, opening, safety zones, controls and networkExact barrier/bollard/gate model, safety devices, electrical/network data and foundations/dorvarn/technical
Publisher · Apollo NZ GlobalEdition · 2026.3Reviewed · 4 October 2026Source policy

06 · PUBLIC REFERENCE DATASET

Pool Project Evidence Matrix

A shared evidence-control framework for modular and made-to-measure pool projects.

Download JSON
WorkstreamAuremont pathwayORDRAN pathwayRelease control
GeometrySelect standard-size starting model + configured optionsMade-to-measure project geometryApproved project CAD controls final dimensions
StructureConfigured shell/support arrangementFRP shell + project-specific steel/support systemExact structural evidence and support/foundation information
WindowsSelected acrylic/viewing-window option where availableFramed / frameless PMMA pathwaysMaterial, thickness, support, seals and exact project evidence
HydraulicsConfigured filtration/heating/treatment equipmentProject-selected hydraulic and treatment systemFinal equipment schedule, flow, pipework and controls
LiftingConfigured weight and lift informationDry weight, lift points and project CoG informationRelease documentation controls crane planning
QAProduction and dispatch checks for configured modelHydrostatic and configuration-specific QA pathwayFinal test/release records tied to supplied pool
WaterOwner treatment/chemistry and maintenance pathwayDocumented chemistry limits + selected treatmentLocal public-health/pool requirements still apply
Local worksFoundation, utilities, barriers, crane, installation and approvalsFoundation, utilities, barriers, crane, installation and approvalsSupply-only boundary stays explicit
Publisher · Apollo NZ GlobalEdition · 2026.3Reviewed · 4 October 2026Source policy