{
  "title": "Modular Development Procurement Matrix",
  "publisher": "Apollo NZ Global",
  "edition": "2026.3",
  "reviewed": "2026-10-04",
  "columns": [
    "Control point",
    "What must be fixed",
    "Why it matters",
    "Primary owner"
  ],
  "rows": [
    [
      "Programme brief",
      "Country, use, quantities, occupancy, areas and programme",
      "Sets the correct modular pathway and scale",
      "/modular-building-development-systems"
    ],
    [
      "System selection",
      "Module/frame type, joining method, storeys and completion level",
      "Avoids forcing every project into one manufacturing format",
      "/modular-building-development-systems/modular-buildings"
    ],
    [
      "Engineering",
      "Wind, seismic, fire, thermal, acoustic and structural criteria",
      "Controls frame, envelope, connections and evidence",
      "/arvell/technical"
    ],
    [
      "Envelope",
      "Roof, wall, insulation, openings, weatherproofing and corrosion strategy",
      "Interfaces determine real building performance",
      "/buildings-large-structures/complete-building-package"
    ],
    [
      "Services",
      "Electrical, plumbing, HVAC, hot water and wet-area interfaces",
      "Separates factory-prepared scope from local connection work",
      "/modular-building-development-systems"
    ],
    [
      "Logistics",
      "Packing, containerisation, road access, lifting and storage",
      "A buildable product must also be deliverable",
      "/modular-building-development-systems"
    ],
    [
      "Local works",
      "Foundations, civil works, erection, utilities and approvals",
      "Keeps supply-only scope explicit",
      "/buildings-large-structures/complete-building-package"
    ],
    [
      "QA + release",
      "Approved drawings, BOM, inspections, packing and documents",
      "Prevents preliminary data controlling production",
      "/technical-resources"
    ],
    [
      "Handover",
      "Manuals, spares, commissioning interfaces and owner records",
      "Supports maintainability after delivery",
      "/technical-resources"
    ]
  ]
}