  "title": "Pool Project Evidence Matrix",
  "publisher": "Apollo NZ Global",
  "edition": "2026.3",
  "reviewed": "2026-10-04",
  "columns": [
    "Workstream",
    "Auremont pathway",
    "ORDRAN pathway",
    "Release control"
  ],
  "rows": [
    [
      "Geometry",
      "Select standard-size starting model + configured options",
      "Made-to-measure project geometry",
      "Approved project CAD controls final dimensions"
    ],
    [
      "Structure",
      "Configured shell/support arrangement",
      "FRP shell + project-specific steel/support system",
      "Exact structural evidence and support/foundation information"
    ],
    [
      "Windows",
      "Selected acrylic/viewing-window option where available",
      "Framed / frameless PMMA pathways",
      "Material, thickness, support, seals and exact project evidence"
    ],
    [
      "Hydraulics",
      "Configured filtration/heating/treatment equipment",
      "Project-selected hydraulic and treatment system",
      "Final equipment schedule, flow, pipework and controls"
    ],
    [
      "Lifting",
      "Configured weight and lift information",
      "Dry weight, lift points and project CoG information",
      "Release documentation controls crane planning"
    ],
    [
      "QA",
      "Production and dispatch checks for configured model",
      "Hydrostatic and configuration-specific QA pathway",
      "Final test/release records tied to supplied pool"
    ],
    [
      "Water",
      "Owner treatment/chemistry and maintenance pathway",
      "Documented chemistry limits + selected treatment",
      "Local public-health/pool requirements still apply"
    ],
    [
      "Local works",
      "Foundation, utilities, barriers, crane, installation and approvals",
      "Foundation, utilities, barriers, crane, installation and approvals",
      "Supply-only boundary stays explicit"
    ]
  ]
}