The project starts with a standard Auremont size, then selected options and the final equipment package are resolved before manufacture.
Auremont Technical Centre
Technical planning for a configured modular pool.
Use this centre to understand the Auremont system, compare cover and installation pathways, and see what must be confirmed before foundations, lifting and services are locked. Supplier-dependent dimensions and performance remain tied to the final project documents.
Pump, filter, heater, treatment and return pathways need to work together and remain serviceable after site completion.
Support, retaining, drainage, electrical connection, barriers, landscaping and approvals depend on the destination project.
Published planning diagrams explain the system, while current project documents control the actual supplied pool.
Auremont · technical drawing set
Understand the system before final project release.
These planning drawings explain the Auremont shell, service zone, water route, installation levels, architectural options and delivery logic. Final project CAD and the confirmed equipment schedule control manufacture and installation.
System anatomy
The modular pool is planned as a coordinated shell, structure, insulation and service system rather than a standalone vessel.
Installation routes
The same modular pool concept can meet the landscape at different levels, but structure, drainage and service access change with each route.
Water + treatment flow
Filtration, heating and treatment are selected as one hydraulic package and confirmed on the final equipment schedule.
Equipment-bay service logic
The pool remains maintainable only if the service zone stays ventilated, drained and accessible after landscaping and decking are complete.
Acrylic viewing-window interface
The clear viewing panel is an architectural option whose opening, reinforcement and seal geometry are resolved before manufacture.
Cover system pathways
Three cover levels can be configured, but motor, structure, travel space and any safety / load performance must be verified for the selected system.
Delivery + placement workflow
Pool delivery is planned backwards from final placement: receiving route, crane setup and site readiness are resolved before dispatch.
Current standard size range
Keep the four existing Auremont sizes as the commercial starting point.
The published size range stays unchanged. Final project CAD clarifies the actual internal swim area, water depth, freeboard, service bay and configured external envelope.
Compact
4.0 × 2.0 × 1.4 mSmall-footprint / plunge-style pathway
Compact Plus
4.3 × 2.25 × 1.4 mCompact residential pathway
Mid-size
5.1 × 2.24 × 1.5 mGeneral residential / hospitality pathway
Long format
9.1 × 2.2 × 2.0 mLonger swimming / training pathway
Auremont cover systems
Three clear cover pathways instead of one generic option.
The cover should be selected early because it can affect power, edge geometry, service access, deck layout and the space needed beside the pool.
Manual Cover
The simplest current cover route. It keeps the cover system separate from powered controls and major moving structure.
Automatic Electric Cover
Motorised cover operation for projects wanting faster day-to-day opening and closing, subject to the selected pool and destination requirements.
Sliding Deck Cover
A moving deck-style cover can transform the closed-pool condition into usable surrounding space, but it requires the most detailed structural and site review.
Cover claim control: do not describe a cover as load-bearing, child-resistant, compliant or safety-rated unless the exact supplied cover has current supporting evidence applicable to the destination requirement.
Technical data structure
Each Auremont project is organised around a controlled technical schedule.
Confirmed project values are organised into clear shell, equipment, hydraulic, electrical, delivery and ownership categories so the supplied package can be reviewed as one coordinated system.
FRP interior · insulated shell system · steel support structure
Exact laminate, insulation and structural details are confirmed from current supplier documentation.
Pump · filter · heater · lighting · controls
Exact brand, model, flow, power and electrical load are locked on the final equipment schedule.
Skimming / suction · filtration · heating · treatment · return
Pipe sizes, materials, valves, turnover rate, backwash and waste connections remain project-confirmed.
Heating · lighting · controls · treatment · powered cover where selected
Destination voltage/frequency, connected load and protection requirements are confirmed before production.
Configured transport envelope · dry weight · lift points
Crane planning must use final order documentation rather than generic container dimensions.
Water balance · filtration · equipment access · cover care · exposed-material inspection
Final operation, maintenance and warranty documents are issued against the supplied package.
Delivery + site release
Do not pour the final slab or book the crane from a generic pool listing.
The configured Auremont order should provide the actual support information, shipping dimensions, dry weight and lifting details needed by the destination project team. Delivery planning then works backwards from final placement.
Auremont project brief
Information that lets Apollo move from an idea to a configured pool faster.
Early-stage projects can proceed with partial information, but access and installation level should be considered before surrounding site works become fixed.
Need Apollo to review it?