Keep the release evidence
Approved drawings, BOM, production test records, packing information and warranty documents should stay tied to the project production record.
Start Project BriefORDRAN Technical Library · QA + Warranty
Current documented production information states a 48–72 hour full-load hydrostatic-test pathway before delivery, with separate post-install water testing for the documented framed pool family. A completed sample hydrostatic report has now been received. The project-specific test record and written warranty documents govern the supplied configuration.
Technical planning information · final project documents control.Product details
Apply these requirements only to the pool construction or project condition they relate to. Final project drawings, local engineering and component documents govern.
ORDRAN is supply-only. Local engineering, foundations, lifting, installation, utilities, barriers, approvals and commissioning remain destination project responsibilities unless expressly included.
Applications + project fit
Approved drawings, BOM, production test records, packing information and warranty documents should stay tied to the project production record.
Installation, water chemistry, misuse, impact and unauthorised modification can affect warranty coverage.
Shell, glazing, electronics, pumps, heat pumps and covers should not be collapsed into one generic warranty period.
Website information is a planning summary; the signed project warranty and component documents govern.
Connected project pathway
Made-to-measure architectural pools developed around project geometry, infinity or overflow edges, windows, water systems, wellness functions and destination logistics.
Open pathway Selection guideAUREMONT vs ORDRAN Pool Selection GuideChoose the pool family from fixed standard geometry versus made-to-measure architectural requirements before detailed specification begins.
Open pathway Project briefORDRAN Architectural Pool Project BriefCompile geometry, edge, window, water-system, access and destination requirements.
Open pathway TechnicalORDRAN Technical CentreReview current ORDRAN construction families, base, lifting, water-system, QA, warranty and project-information resources.
Open pathway Project briefORDRAN Architectural Pool Project BriefCompile made-to-measure geometry, architectural intent, water systems, logistics and project-stage information for review.
Open pathwayReview this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.
No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.
Ready to review the project?