Auremont Installation-Day Checklist

Receive it, lift it, place it and commission it without losing control of the handover.

This checklist helps the local project team coordinate receiving, crane placement, services, first operation and handover. It is a planning and record tool — not a substitute for the configured pool's current lifting information, approved project drawings, equipment manuals or local professional requirements.

DO NOT LIFT FROM GENERIC CONTAINER POINTS.

Use only the current lifting information supplied for the configured Auremont unit. Do not assume container corner castings, generic lifting points, sling angles, crane radii or unit weights apply to the project.

Installation record

0 of 82 checks completed

Use the checklist through delivery, placement and commissioning, then save the result into My Apollo Project.

0%
01

Before truck + crane arrive

02

Receiving + pre-lift

03

Crane placement

04

Immediately after placement

05

Local connections

06

Fill + first operation

07

Viewing window — where fitted

08

Automatic / sliding cover — where fitted

09

Commissioning + handover

Local project responsibilities

AUREMONT is supply-only.

Local qualified trades and project professionals remain responsible for foundations / support, lifting, regulated electrical and plumbing work, drainage, structural interfaces, barriers, inspections, approvals and commissioning unless the written quotation expressly states otherwise.

Foundation / supportCrane + lift planElectrical + isolationWater + drainageBackwash / wasteBarriers + gatesLocal inspectionsCommissioning
Pre-dispatch + QA centreOwnership + maintenance