Skip to main content
Apollo NZ GlobalInternational

Specification Records / Global

Specify the building from use, geometry and destination criteria—not a generic shell.

Apollo's building pathways include clear-span aluminium structures, heavy steel buildings, complete building packages, modular systems and specialist project buildings. The specification should start with occupancy and operations, then lock span, height, openings, envelope, loads, services and local responsibilities.

Global / overseas search owner Manual project review Exact-system evidence only
Clear-span commercial building with large operational interior

Direct answer

The short version.

For a large building or structure, provide use, dimensions, required clear span and height, openings, equipment or racking, wind/snow/seismic criteria, envelope and insulation expectations, fire/service interfaces, destination, programme and local foundation/erection model before the manufacturing path is selected.

Project decision

What matters before product selection.

Use these points to structure the first project conversation. Final suitability stays tied to the actual site, selected system and local project team.

Select the structural pathway

Clear-span aluminium, heavy steel, modular and prefabricated building systems solve different span, room-layout, transport and permanence requirements.

Design criteria belong in the brief

Wind, snow, seismic, corrosion, occupancy, equipment loads and required clearances should be stated before profiles or structural layouts are frozen.

Coordinate the envelope

Roof and wall build-up, insulation, doors, glazing, façades, drainage, ventilation and building services need to be reviewed as interfaces rather than isolated products.

Logistics are technical inputs

Module and member sizes, packing, containerisation, unloading, crane access and erection sequence can change the viable solution, particularly for overseas and remote sites.

Comparison matrix

Building specification pathway

Match the structural format to the use and destination.

PathwayTypical useSpecification focus
SARENTA clear-spanSport, event, storage, project hallsSpan, height, frame, membrane/walls, anchoring
Heavy steelWarehouse, industrial, commercialGrid, loads, envelope, openings, services
Complete building packageCoordinated shell projectsStructure, cladding, openings, scope interfaces
Expandable / modularAccommodation, offices, support buildingsModule, room plan, transport, services, foundations
Project / community structuresAssembly, education, worshipOccupancy, egress, climate, services, local approvals

Project brief

Information worth collecting before quotation.

01Building use / occupancy
02Length / width / height
03Required clear span
04Doors / openings
05Racking / equipment / suspended loads
06Wind / snow / seismic criteria
07Corrosion / climate
08Envelope / insulation
09Fire / services strategy
10Foundations / ground information
11Freight / crane / erection
12Required engineering / documents

Frequently asked

Answers without oversimplifying the project.

Can the SARENTA specification record be used for every building Apollo supplies?

No. SARENTA covers a specific clear-span structural family. Heavy-steel, modular and other building pathways need their own exact product and project information.

Who designs foundations?

Foundation and anchoring design remain project- and site-specific and should be completed by the appropriate local professionals using the exact selected structure reactions and requirements.

Can Apollo support international building RFPs?

Yes. Apollo can structure the supply review around destination criteria, product scope, technical information, packing and freight while local statutory and construction responsibilities remain separate.

Next step

Turn the research into a real project brief.

Send the site, dimensions, intended use, quantities and known local requirements. Apollo will review the relevant product pathway and keep local engineering, approvals and site-work responsibilities explicit.

Build a building / structure RFP

Current technical documents

Documents tied to the exact Apollo product owner.

Only documents currently released in Apollo's public technical registry appear here. Missing documents are not replaced with supplier material, assumptions or unrelated certificates.
No released public document is registered for this centre yet.

Use the product owner and project brief for current information. Apollo will only expose CAD, BIM, test, certificate or technical files after they are tied to the exact system and cleared for public use.

Open Technical & Specifier Centre
Project