Skip to main content
Apollo NZ GlobalStart Project Brief
SARENTAARCHITECTURAL STRUCTURE SYSTEMS

SARENTA Technical Centre

Reference data for early feasibility, system selection and project engineering.

These are current supplier-confirmed planning references for the SARENTA platform. Final structure, profile size, loads, membrane, foundations, anchoring, services and destination compliance are confirmed against the live project.

Back to SARENTA
Clear span5–60 m

Main-series reference range; heights are project-customised.

Primary frame6061-T6 aluminium

High-strength extruded aluminium is the supplier-confirmed standard structural frame material.

Wind designProject-specific

Higher wind demand can require larger main profiles and dedicated structural calculations.

Snow designProject-specific

Snow loading is engineered to the destination criteria where applicable.

Verified reference data

Current technical framework.

The values below are useful for feasibility and early product selection. They are not a substitute for the project-specific engineering package.

01 · Clear-span range5–60 m

Supplier-confirmed range for the main clear-span series. Side height and ridge height are project-customised.

02 · Primary frame6061-T6 extruded aluminium

Supplier-confirmed standard structural frame material across the structural range.

03 · Structural engineeringProject-specific calculations + drawings

Structural calculation reports, structural drawings, base-positioning plans and embedment drawings can be provided for the selected project.

04 · Wind + snow designDesigned to project location

Wind and snow criteria are confirmed from the destination brief. Higher wind demand can require larger main profiles and project-specific engineering.

05 · PVC membrane weights650 / 750 / 850 / 900 / 1050 / 1250 gsm

PVC membrane options confirmed by the supplier, with optional PVDF top coat.

06 · Membrane weatheringWaterproof + UV-resistant

Supplier states the membranes are fully waterproof with strong UV resistance. Exact fabric specification is confirmed for the quoted system.

07 · Wall optionsPVC fabric · sandwich panel · glass · ABS

Wall construction is selected around use, climate, security, thermal requirements and project duration.

08 · Roof insulationInsulated fabric liner available

The exact liner build-up and thermal performance are project-specific and must be confirmed before quotation.

09 · Foundations + anchoringConcrete · ground screw · ballast · temporary anchoring

The final system is selected against duration, ground condition, loads, local engineering and statutory requirements.

10 · Use durationTemporary · semi-permanent · permanent pathways

Semi-permanent and permanent applications require the appropriate engineering upgrade and destination-specific review.

11 · Reference service lifePVC membrane: 8 years · aluminium frame: 25–30 years

Supplier-stated theoretical references only, subject to climate, maintenance, exposure and actual membrane / frame specification.

12 · WarrantyCurrent supplier standard: 1 year

Final Apollo project warranty and any component-specific warranty terms are confirmed in the quotation and supply schedule.

13 · Technical documentsCAD · installation manual · certification files

Available project documentation is released against the selected structure and live project requirement.

Project package capability

Structure plus selected supporting systems.

Package scope is confirmed against the project. Apollo remains supply-only; site installation and local engineering are separately assigned.

SARENTA SPORT

Supplier-confirmed complete sports package pathway.

  • Sports flooring
  • Sports lighting
  • Air-conditioning pathway
  • Sport equipment
Explore SPORT

SARENTA EVENT

Supplier-confirmed complete event package pathway.

  • Flooring
  • Glass walls
  • Ceiling lining
  • Lighting truss
  • Stage flooring
  • Air-conditioning pathway
  • Doors
Explore EVENT

SARENTA RESORT

The current supplier scope is primarily the camping / tented structure. Bathrooms, plumbing, electrical, interior fit-out and other building services are separate unless specifically confirmed.

Explore RESORT

Wind-performance note

The supplier advised that a typical standard reference can be around 80 km/h, but that figure is not treated as the public SARENTA design rating. Wind performance must be selected from the actual project location, and higher wind requirements can require larger structural profiles and dedicated calculations.

Certificates + standards

Fire-retardant cover certificates and other certification files can be supplied, but the exact test standard, report number and relevance to the quoted membrane or system must be checked before any compliance claim is made.

Project brief checklist

Information that lets engineering start in the right place.

Early-stage projects can proceed with partial information, but destination and intended use should be known from the beginning.

01Country / destination and intended use
02Overall length × width × required side height
03Required clear span and any minimum internal clearances
04Temporary, semi-permanent or permanent intent
05Known wind, snow, seismic, fire or local-code criteria
06Wall / enclosure requirement: fabric, sandwich panel, glass or ABS
07Roof membrane weight / finish preference if known
08Insulated liner or climate-control requirement
09Foundation / anchoring preference if already defined
10Door sizes, vehicle access, court or equipment clearances
11Drawings, site information, target programme and destination logistics
SARENTA

Technical project review

Need a SARENTA structure assessed for an active project?

Send the destination, intended use, approximate dimensions, required span and known design criteria. Apollo will coordinate the supply-side technical review.

Start SARENTA project
Project