Skip to main content
Apollo NZ Global
Get a QuoteMy Project
International

Specification Records / Global

Specify pools and wellness around the site, services and maintenance envelope.

Apollo pool and wellness pathways include AUREMONT modular pools plus sauna, plunge, spa, steam and wider wellness systems. The product cannot be separated from foundations, lifting, hydraulics, electrical loads, drainage, ventilation, barriers and future service access.

Only need basic information? Ask Apollo a quick question — no project drawings needed.

International project guidance Manual project review Exact-system evidence only
Integrated pool and wellness zone with sauna and cold plunge

Direct answer

The short version.

For pool and wellness specification, lock the product family and exact model/configuration, then coordinate site levels, support, crane or delivery access, water and drainage, electrical loads, ventilation, barriers, equipment access, cleaning and local compliance before surrounding construction is finished.

Project decision

What matters before product selection.

Use these points to structure the first project conversation. Final suitability stays tied to the actual site, selected system and local project team.

Pool site readiness

A modular pool still needs suitable support, finished levels, delivery and lifting access, service routes, barriers and equipment maintenance space.

Wellness services

Sauna, steam, plunge, spa and recovery systems can have different power, water, drainage, ventilation, heat and equipment-zone requirements.

Model-specific documentation

AUREMONT uses defined standard pool models with current model data sheets. Dimensions and features should be taken from the selected product record and approved project information rather than assumed from a similar pool.

Health and performance claims

Apollo uses product-supported technical information and does not extend wellness equipment into unsupported medical or therapeutic claims.

Comparison matrix

Pool & wellness specification pathway

Use the physical service requirement to structure the brief.

SystemPrimary planningCurrent pathway
AUREMONT modular poolModel, support, lift, hydraulics, barriersPool technical + model data
Sauna / infraredHeat, power/flue, ventilation, clearancesWellness systems
SteamMoisture enclosure, generator, drainage, ventilationWellness systems
Cold plungeChiller, filtration, drainage, airflow, noiseWellness systems
Commercial wellness suiteCapacity, cleaning, plant, user flowWellness project brief

Project brief

Information worth collecting before quotation.

01Exact product / model
02Site / room drawings
03Finished levels
04Foundation / support
05Delivery / lifting
06Power
07Water / drainage
08Ventilation
09Barriers / access control
10Equipment service space
11Cleaning / maintenance
12Destination requirements

Frequently asked

Answers without oversimplifying the project.

Are AUREMONT pool sizes customisable?

The current AUREMONT pathway uses defined standard external pool formats. Site integration and compatible options are configured around the selected model rather than changing the shell to any arbitrary length or width.

Can a wellness project use several Apollo systems?

Yes. Suitable systems can be coordinated in one wellness brief, while each system retains its own services, evidence and local installation requirements.

Where are current pool documents located?

AUREMONT current model data sheets and range guidance are registered through the Technical & Specifier Centre and the AUREMONT Downloads / Technical pathways.

Next step

Turn the research into a real project brief.

Send the site, dimensions, intended use, quantities and known local requirements. Apollo will review the relevant product pathway and keep local engineering, approvals and site-work responsibilities explicit.

Build a pool / wellness specification brief

Current technical documents

Documents tied to the exact Apollo product owner.

Only current technical documents linked to the exact Apollo product or system appear here. Missing documents are not replaced with assumptions or unrelated certificates.
Spec sheet · Current

ORDRAN Standard COMPACT — Model Data Sheet

ORDRAN Standard COMPACT

Existing approved standard-model datasheet; legacy PDF branding retained pending document revision
Spec sheet · Current

ORDRAN Standard COMPACT PLUS — Model Data Sheet

ORDRAN Standard COMPACT PLUS

Existing approved standard-model datasheet; legacy PDF branding retained pending document revision
Spec sheet · Current

ORDRAN Standard MID-SIZE — Model Data Sheet

ORDRAN Standard MID-SIZE

Existing approved standard-model datasheet; legacy PDF branding retained pending document revision
Spec sheet · Current

ORDRAN Standard LONG FORMAT — Model Data Sheet

ORDRAN Standard LONG FORMAT

Existing approved standard-model datasheet; legacy PDF branding retained pending document revision
Buyer guide · Current

ORDRAN Standard — Four-Model Range Guide (legacy edition)

ORDRAN Standard

Existing premium standard-size range guide; legacy PDF branding retained pending document revision
Buyer guide · Current

ORDRAN Architectural Pool Systems Range Guide

ORDRAN Architectural Pool Systems

29 September 2026 · approved premium architectural pool range guide · support-system wording updated
Spec sheet · Current

ORDRAN CUSTOM Premium Product Guide

ORDRAN CUSTOM

29 September 2026 · approved premium product guide · galvanized-steel support wording updated
Spec sheet · Current

ORDRAN INFINITY Premium Product Guide

ORDRAN INFINITY

26 September 2026 · approved premium product guide
Spec sheet · Current

ORDRAN PLUNGE Premium Product Guide

ORDRAN PLUNGE

26 September 2026 · approved premium product guide
Spec sheet · Current

ORDRAN LINEAR Premium Product Guide

ORDRAN LINEAR

26 September 2026 · approved premium product guide
Project guide · Current

ORDRAN Resort Pool Planning Guide

ORDRAN Architectural Pool Systems

7 October 2026 · commercial hospitality planning guide
Project guide · Current

ORDRAN Developer Multi-Pool Guide

ORDRAN Architectural Pool Systems

7 October 2026 · development and repeated-pool planning guide
Project guide · Current

ORDRAN Pacific Island Pool Project Guide

ORDRAN Architectural Pool Systems

7 October 2026 · island logistics and pool-project planning guide
Project guide · Current

ORDRAN Architect & Specifier Project Guide

ORDRAN Architectural Pool Systems

7 October 2026 · architect and specifier planning guide
Ready to move from specification into a live project?
Upload drawings / project filesStart project brief
Project