AUREMONT COMPACT
4.0 × 2.0 × 1.4 mCompact residential · courtyard · plunge-style
Start Project BriefAUREMONT · Technical documents
Start with the data sheet for the selected standard model, then move into the technical, option, logistics and ownership resources needed for the configured project.

The public data sheets support early model selection. Final configured order documents take precedence for the supplied pool.
Product details
Use the right document at the right project stage.
AUREMONT is supply-only. Published model data sheets are planning documents; the final quotation, approved CAD and configured release documents control each order.
AUREMONT DOCUMENT LIBRARY
Compact residential · courtyard · plunge-style
Residential · villas · compact hospitality
Lifestyle residential · hospitality
Long swimming · exercise · resort
RANGE GUIDE
PROJECT PLANNING
System anatomy, standard sizes, covers, services, QA and delivery planning.
Open resourceCompatible viewing-window, cover, WPC, Baja shelf, treatment and other option pathways.
Open resourceFrom standard model selection through CAD, production, freight, placement and local commissioning.
Open resourceConfigured-order checks, documentation, equipment, packing and release information.
Open resourceReceiving, lifting, placement, local connections, first operation and handover.
Open resourceLocal project responsibilities, maintenance access, handover and owner-care planning.
Open resourceAUREMONT is supply-only. Data sheets describe the current standard-size product pathways and do not replace project-specific foundation design, lifting plans, local approvals, electrical/plumbing design or the final configured order documents.
Applications + project fit
Each Auremont model keeps its fixed external size and its own selection intent.
Base, delivery, covers, hydraulics and local works are resolved through the technical and project resources rather than overloaded into the data sheet.
The Technical Resources registry identifies current documents and keeps superseded or held documents out of the public feed.
Foundations, lifting, installation, utilities, barriers, approvals and commissioning remain local project responsibilities unless expressly included.
Connected project pathway
Four fixed external standard pool formats with installation, equipment and compatible options configured around the selected modular shell.
Open pathway Planning guideComplete Modular Pool Planning GuidePlan the pool, foundation, access, lifting, services, barriers and surrounding works before the final configuration is released.
Open pathway ReadinessAUREMONT Site ReadinessCheck support, access, services, safety planning and exposure before the selected standard pool is configured.
Open pathway TechnicalTechnical & Specifier CentreUse current product information, technical documentation and professional project resources.
Open pathway Project briefAUREMONT Project Brief BuilderCompile the selected standard size, site, access, services and project-stage information for review.
Open pathwayReview this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.
Global supply
Open the relevant market page for regional product information, project examples and supply enquiries.
Ready to review the project?