Skip to main content
Apollo NZ Global
RHELGAN Power Technical CentreRHELGAN Development & Humanitarian Systems

STANDARD SPECIFICATION & QUOTATION SCHEDULE

One controlled format for every generator quotation.

Use this schedule to make sure ratings, electrical configuration, engine, alternator, controls, environmental package, fuel, testing, documentation and commercial scope are all stated in one place. Blank items remain to be confirmed rather than being assumed.

Project reference____________________________
Customer / organisation____________________________
Destination____________________________
Quotation date / revision____________________________
01

Project

Project referenceTo be confirmed / ________________________________
Customer / organisationTo be confirmed / ________________________________
Destination country + siteTo be confirmed / ________________________________
ApplicationTo be confirmed / ________________________________
Target delivery / commissioning dateTo be confirmed / ________________________________
02

Electrical

Prime rating kVA / kWTo be confirmed / ________________________________
Standby rating kVA / kWTo be confirmed / ________________________________
FrequencyTo be confirmed / ________________________________
VoltageTo be confirmed / ________________________________
PhaseTo be confirmed / ________________________________
Power factorTo be confirmed / ________________________________
Connection / earthing notesTo be confirmed / ________________________________
03

Generator set

Engine brand + modelTo be confirmed / ________________________________
Alternator brand + modelTo be confirmed / ________________________________
ControllerTo be confirmed / ________________________________
GovernorTo be confirmed / ________________________________
Starting systemTo be confirmed / ________________________________
Battery / chargerTo be confirmed / ________________________________
04

Enclosure & environment

Open / silent / containerised / mobileTo be confirmed / ________________________________
Ambient design temperatureTo be confirmed / ________________________________
AltitudeTo be confirmed / ________________________________
Weather protectionTo be confirmed / ________________________________
Corrosion / coastal packageTo be confirmed / ________________________________
Dust / filtration packageTo be confirmed / ________________________________
Noise requirement + test distanceTo be confirmed / ________________________________
05

Fuel

Base-tank capacityTo be confirmed / ________________________________
Estimated runtime basisTo be confirmed / ________________________________
Extended / external tankTo be confirmed / ________________________________
Bunding requirementTo be confirmed / ________________________________
Fuel filtration / water separatorTo be confirmed / ________________________________
06

Controls & switchgear

ATS / AMFTo be confirmed / ________________________________
ATS ratingTo be confirmed / ________________________________
Remote monitoringTo be confirmed / ________________________________
Parallel / synchronisationTo be confirmed / ________________________________
Communications protocolTo be confirmed / ________________________________
Hybrid / EMS interfaceTo be confirmed / ________________________________
07

Documentation & testing

Factory datasheetTo be confirmed / ________________________________
Load-test / FAT requirementTo be confirmed / ________________________________
Drawings / SLDTo be confirmed / ________________________________
Certification / DoC requirementTo be confirmed / ________________________________
Operation & maintenance manualsTo be confirmed / ________________________________
Spare-parts listTo be confirmed / ________________________________
08

Commercial

Production lead timeTo be confirmed / ________________________________
Freight basis + destinationTo be confirmed / ________________________________
Packing / container loadingTo be confirmed / ________________________________
WarrantyTo be confirmed / ________________________________
Commissioning / installation scopeTo be confirmed / ________________________________
Quoted exclusionsTo be confirmed / ________________________________
Quote validityTo be confirmed / ________________________________

STANDARD SCOPE CONTROL

State exclusions rather than leaving them implied.

  • Local civil works, foundations, plinths, drainage and permanent site access unless expressly included.
  • Site cabling, switchboards, protection studies, earthing, utility approvals and local electrical installation unless expressly included.
  • Fuel, permanent bulk-fuel storage and local fuel approvals unless expressly included.
  • Cranage, unloading, placement and site lifting unless expressly included.
  • Local permits, statutory approvals, emissions approvals and professional engineering unless expressly included.
  • Site commissioning, synchronisation with existing plant and live-switchboard works unless expressly included in the written quotation.
  • Solar PV, battery storage, PCS / inverter and EMS equipment unless specifically included as a separately defined project package.
Technical precedence

The final factory-approved datasheet and written quotation for the exact configured generator take precedence over generic website, catalogue or planning-reference information. Any deviation from the standard exclusions must be stated explicitly in the project quotation.

RHELGAN · POWER & ENERGY SYSTEMS

Need Apollo to populate this schedule for a live project?

Start Power Project Brief
Project