Skip to main content
Apollo NZ GlobalStart Project Brief

Technical & Specifier Centre

One place for current Apollo product information.

Search public handbooks, product pages, fitment material, specifications and project-planning tools. Drawings, certificates, warranties and other product documents are included where available for the relevant system.

Ask Apollo Technical

Search Apollo's technical library in plain language.

Ask a question about an Apollo product or project pathway and get an answer from the current technical information available on the website.

Technical search does not calculate pricing or replace project-specific engineering and professional advice.

Apollo Reference Library

Project guides, templates and technical references.

Use these resources to prepare scopes, compare options and structure project information before quotation and project review.

Domain references

Planning guides, comparison matrices and technical pathways.

01Professional gateway

Specifier & Procurement Reference Library

One professional gateway for technical information, specification guidance, comparison matrices, procurement resources and RFP tools.

Open reference
02Project references

Project Resources, Templates & Matrices

A practical index linking Apollo project guides, working templates, project checklists and comparison matrices from one professional reference page.

Open reference
03Specification

Apollo Specification Toolkit

Generic specification clauses plus substitution review, technical-document request and pre-tender coordination schedules.

Open reference
04Professional templates

Procurement Templates & Project Checklists

Copyable and downloadable procurement, technical-submittal and international RFP templates for working project teams.

Open reference
05Public-sector procurement

Public-Sector & Development Tender Readiness Guide

A tender-planning reference for schools, councils, developers and commercial teams covering project scope, technical submittals, substitutions, lifecycle, logistics, responsibilities and structured tender returns.

Open reference
06Project planning

Project References & Planning Guides

Sector-specific references, applications and planning guides connected to Apollo products and project pathways.

Open reference
07Sports surfaces

Complete Sports Flooring Selection Guide

A planning guide for comparing modular tile, roll-out, impact-flooring and sled-turf pathways around base condition, drainage, repair and operating requirements.

Open reference
08Stadium & venue

Stadium Seating & Grandstand Selection Matrix

Compare portable bleachers, retractable seating, aluminium and steel grandstands, covered stands and fixed stadium seating around venue type, scale and project interfaces.

Open reference
09Stadium & venue

Stadium Seating & Grandstand Project Planning Guide

Plan the full spectator-infrastructure brief around venue use, circulation, accessibility, structure, weather cover, technical information, freight, installation responsibilities and lifecycle support.

Open reference
10Gym flooring

Rubber Gym Tiles vs Rolls

A practical comparison of modular repair, joint patterns, impact zoning, broad-area coverage, transitions, substrate preparation and maintenance strategy.

Open reference
11Court planning

Complete Pickleball Court Planning Guide

Footprint, run-off, base, drainage, surface, equipment, access, lighting and future-use considerations brought together in one planning reference.

Open reference
12Architecture

Architectural Façade Technical Design Guide

A technical coordination reference covering façade system selection, support concepts, joints, corners, forming, perforation, finishes, samples and project-specific requirements.

Open reference
13Architecture

Architectural Façade Specifier & Tender Centre

System selection, conceptual details, finishes, samples, mock-ups and tender wording organised for architects, consultants and project teams.

Open reference
14Outdoor architecture

Complete Outdoor Blind Planning Guide

Opening size, structural fixing zones, exposure, fabric outcome, operation and controls considered before a Velaris configuration is selected.

Open reference
15Pools & wellness

Complete Modular Pool Planning Guide

A site-first reference covering delivery and lifting access, foundation strategy, drainage, services, barriers and local project responsibilities.

Open reference
16Pools & wellness

Auremont Technical Centre

System anatomy, installation routes, hydraulic flow, equipment-bay planning, acrylic-window interfaces, manual and automatic covers, sliding deck covers and delivery logic.

Open reference
17Pools & wellness

Auremont Contractor & Ownership Centre

Site preparation, placement, commissioning, handover, owner care, cover maintenance, acrylic-window care, coastal upkeep and service-record planning.

Open reference
18Pools & wellness

Auremont Options Centre

Compare viewing windows, WPC integration, Baja shelves, pool + spa, counter-current, water treatment and the three current cover pathways before final configuration.

Open reference
19Pools & wellness

Auremont Multi-Pool Schedule Builder

Structure repeated pool types, quantities, option packages and staged releases for development and hospitality programmes.

Open reference
20Pools & wellness

Auremont International Logistics Planner

Plan destination, receiving, shipment stages, truck access, crane readiness, storage and local site interfaces for international pool supply.

Open reference
21Pools & wellness

Auremont Buyer FAQ

Scope, crane, standard-size, installation, utility, cover, international-delivery and multi-pool answers linked to the relevant Auremont planning pathways.

Open reference
22Pools & wellness

Auremont Pre-Dispatch + QA Centre

Configured-order identity, project release evidence, equipment, packing, logistics and evidence-control guidance before factory dispatch.

Open reference
23Pools & wellness

Auremont Installation-Day Checklist

Receiving, lifting, placement, local connections, first operation, cover/window checks, commissioning and handover for the destination project team.

Open reference
24Global projects

Global Project Readiness Matrix

A concise international-project matrix covering destination, climate, local requirements, freight handover, site interfaces and receiving documents.

Open reference
25Global projects

Global Market × Product Capability Matrix

A market-by-market view of Apollo product pathways across current target regions.

Open reference
26Resorts & development

Resort & Destination Development Planning Guide

A multi-zone planning reference for resort RFPs covering Apollo systems, project-specific sourcing, climate, guest operations, logistics and local responsibilities.

Open reference
27Global supply

International Kitset Supply Planning

A practical international-supply reference for destination, handover point, packaging, freight scope, receiving requirements, documents, unloading and local responsibilities.

Open reference

Use the current product page, applicable technical documents and project quotation when product-specific specifications, approvals or project performance need to be confirmed.

Technical Document Guide

Use each document within its actual scope.

This reference helps project teams understand how datasheets, test reports, certificates, calculations, drawings and warranties relate to the selected product and project.

Document typeWhat it can supportWhat it does not establish by itself
Product datasheet / specificationPublished dimensions, materials, configurations, components and product-level characteristics stated for the identified model or family.Prove suitability for every site, local code, wind zone, structural interface or unlisted configuration.
Independent test reportThe test method, specimen, configuration and measured result recorded by the issuing laboratory for the tested scope.Automatically extend the result to different sizes, materials, fixings, assemblies or installation conditions.
Certificate / product listingThe certification, listing or conformity scope stated by the issuing body, including the products and conditions actually covered.Cover unrelated models, expired scopes, omitted accessories or project conditions outside the certificate.
Engineering calculationThe loads, geometry, material assumptions, supports and calculation basis stated in that specific engineering package.Transfer automatically to another site, span, substrate, foundation or loading condition unless those items are included and checked.
Installation manualThe manufacturer's documented installation, setup, operation or maintenance pathway for the identified product.Replace site measurement, structural adequacy, local trade competence, statutory approvals or project-specific engineering.
CAD / BIM / project drawingGeometry, coordination, interfaces and dimensions represented in the current drawing or model for design development.By itself prove structural performance, certification, fire performance or destination compliance unless the document explicitly carries that verified evidence.
Warranty documentThe stated warranty period, covered components, exclusions, maintenance conditions and claim pathway for the identified product.Act as independent proof of engineering performance, code compliance or suitability for every environment.

Use the exact current document for the exact product and configuration. Where available documentation does not cover the project condition, confirm the requirement through project-specific technical review.

Apollo Specification & Tender Guide

Write the requirement so technical information and responsibilities stay clear.

This cross-category reference helps architects, consultants and procurement teams describe Apollo systems without turning indicative information into guarantees or hiding project-specific responsibilities inside the product specification.

Specification areaIncludeAvoid
Product identityName the exact Apollo product or system family and the configuration being specified where known.Do not carry a family-level feature, dimension or certificate across every model by implication.
Technical valuesUse dimensions, materials, finishes, test results and other values supported by the current product page and applicable technical documents.Do not convert indicative or different-model information into a project guarantee.
Project-dependent requirementsState the project criteria that still need confirmation: loads, exposure, substrate, foundations, services, fixing, local compliance, access or installation conditions.Do not present an unresolved site condition as though it were already confirmed product performance.
Scope + responsibilitiesSeparate Apollo product supply and any expressly included support from local engineering, site measurement, civil/electrical work, installation and approvals.Do not hide local project responsibilities inside a generic phrase such as complete system unless the written scope defines them.
Alternatives / substitutionsAssess an alternative against application, dimensions/interfaces, materials, current technical information, maintenance, warranty/spares and destination requirements.Do not treat price, appearance or a broad category match as proof of technical equivalence.
Document controlReference the current Apollo product page, current quotation and current technical documents for the selected product or project package.Do not allow an old downloaded file or superseded model reference to override current project information.

Reusable early-stage clauses

Copy the framework, then adapt it to the actual project.

These are generic coordination clauses, not legal advice and not a substitute for the project team's own specification, engineering or statutory review.

GENERAL SPECIFICATION WORDING

Current information clause

Product selection and specification shall be based on the current Apollo product page, current project quotation and current technical documents issued for the selected system. Superseded saved files should not be used where they conflict with current project information.

GENERAL SPECIFICATION WORDING

Technical information clause

Where a project requires stated performance, certification or testing, use current technical information applicable to the exact product and configuration offered. Different sizes, materials, fixings or assemblies may require separate review.

GENERAL SPECIFICATION WORDING

Supply-scope clause

Apollo's quoted scope is product supply and specifically stated supporting information. Site measurement, local engineering, foundations, civil or electrical works, installation and statutory approvals remain with the purchaser's appointed project team unless expressly included in writing.

GENERAL SPECIFICATION WORDING

Alternative / substitution clause

Any proposed alternative shall demonstrate equivalent project suitability against the specified application, dimensions and interfaces, material and finish, technical documentation, warranty and spares, maintenance requirements and destination conditions. Price or visual similarity alone does not establish equivalence.

GENERAL SPECIFICATION WORDING

Technical submittal clause

Technical submittals shall identify the exact product, model, material, finish and configuration offered and shall include the current project-relevant drawings, data sheets, test reports, certificates and other documents requested by the project team. Documents for a different model or configuration should be clearly identified.

GENERAL SPECIFICATION WORDING

Samples and mock-ups clause

Where samples or mock-ups are required, the approved sample or mock-up shall establish the agreed visual, material or assembly reference for the project within its stated scope. Approval of appearance does not by itself establish structural, fire, weather, code or other performance compliance.

GENERAL SPECIFICATION WORDING

Revision and change-control clause

Drawings, schedules and technical documents shall carry a revision or issue date. Any change to dimensions, materials, finishes, loads, interfaces, accessories or other project-critical information after approval shall be identified and reviewed before manufacture or procurement continues.

GENERAL SPECIFICATION WORDING

Packaging and logistics clause

The quoted supply scope shall identify the agreed packaging method, crate or bundle identification, shipping dimensions and project handover point. Import clearance, onward transport, unloading, storage and site movement responsibilities shall remain with the party identified in the written project scope.

GENERAL SPECIFICATION WORDING

Warranty and spare-parts clause

The supplied warranty, exclusions, maintenance conditions, claim pathway and responsible legal entity shall be identified before order. Where lifecycle support is material to the project, spare parts, replacement components and expected replacement lead times shall be confirmed separately.

Product-specific technical values should be checked against the current product page, relevant technical documents and project quotation. Use the Technical Document Guide when reviewing a report, certificate or calculation for a tender requirement.

Search + filter

Find a document or technical pathway.

Public resources stay open to customers and specifiers. Approved trade partners can use the secure portal for partner-only material as it is added.

Product-scoped technical library/container-pools/long-format
Show all technical resources
22 technical downloads0 matching resources

No technical document matches those filters. The technical product library below may still contain the current information.

Technical product library

Specifications, planning guidance and current product pages.

These entries stay searchable alongside downloadable files so product information is not hidden simply because a PDF has not been published.

Linkable project resources

Field checklists for better product briefs.

These concise checklists are designed to be bookmarked, shared with project teams and linked directly from specifications, club notes, school planning documents or partner resources. Each checklist points to the fuller Apollo planning guide.

01

ATHREN FIELD sports-turf project checklist

Capture the field and evidence pathway before the exact turf construction is selected.

  • Primary sport and level of play
  • Field footprint and shared-use requirements
  • Federation / tender requirement
  • Base, levels and drainage status
  • Water, infill and shockpad strategy
  • Goals, perimeter, lighting and spectators
  • Maintenance, installation and testing responsibilities
Open planning guide
02

Professional procurement templates

Use these working templates when a project needs a repeatable procurement or document-management structure.

  • International project procurement checklist
  • Technical submittal register
  • International project RFP checklist
  • Copy, CSV download and print / save PDF pathways
Open planning guide
03

Sports court surface briefing checklist

Use this before comparing modular tile and roll-out surfaces.

  • Existing base material and condition
  • Falls, drainage and ponding
  • Primary and secondary sports
  • User groups and operating intensity
  • Maintenance and repair pathway
Open planning guide
04

Pickleball conversion briefing checklist

Capture the whole playing envelope before choosing a surface.

  • Usable footprint and run-off
  • Existing hardstand condition
  • Permanent or staged conversion
  • Net, fence and access layout
  • Lighting and future expansion
Open planning guide
05

Modular pump track site checklist

Define the rider group and surrounding site as well as the track footprint.

  • Rider ages and progression
  • Usable footprint and levels
  • Drainage and surrounding surface
  • Delivery and assembly access
  • Supervision, circulation and expansion
Open planning guide
06

All-season ski facility briefing checklist

Define the training programme, site geometry and operating model before selecting SLOPEspan terrain.

  • Target disciplines and athlete levels
  • Available length, width, levels and gradient
  • Dry, wet-assist or snow-over operating intent
  • Base, drainage, water, power and access
  • Coaching, viewing, run-out, safety and future expansion
Open planning guide
07

Stadium seating & grandstand project brief checklist

Define the venue, spectator system and local project interfaces before a seating layout is treated as a procurement package.

  • Venue type, operating model and intended spectator capacity
  • Preferred seating / bleacher / retractable / grandstand pathway
  • Room or site drawings, levels and available footprint
  • Client-side aisle, access, accessibility and egress criteria
  • Structure, foundations, roof / exposure and engineering interfaces
  • Destination, freight handover, receiving and local installation team
Open planning guide
08

Outdoor blind opening checklist

Record the structural and operating details that width × drop alone cannot answer.

  • Clear width and drop
  • Cassette and guide fixing zones
  • Exposure and weather direction
  • Fabric outcome: shade, view, privacy or rain
  • Manual, motorised or smart-control pathway
Open planning guide
09

Outdoor roof specification checklist

Coordinate structure, drainage and future enclosure before accessories.

  • Freestanding, wall-mounted or roof-only
  • Overall dimensions and support points
  • Rainwater discharge pathway
  • Future blinds, glass or walls
  • Controls, lighting and local engineering interface
Open planning guide
10

SVALDR elemental outdoor project checklist

Coordinate the complete landscape before individual fire, water, screen or planter products are frozen.

  • Site plan, main views and circulation
  • Fire / cooking fuel and hot-zone intent
  • Water, drainage and maintenance access
  • Planting, soil, irrigation and filled loads
  • Screen sightlines, lighting, services and exposure
Open planning guide
11

Modular pool delivery and site checklist

Plan the final position together with the transport and lifting route.

  • Pool size and installation level
  • Truck and crane access
  • Foundation and local drainage
  • Filtration, heating and service access
  • Deck, barrier and local pool-safety interfaces
Open planning guide
12

Expandable building destination checklist

Turn the intended use and destination into a project-ready building brief.

  • Operational use and occupancy
  • Room, wet-area and service needs
  • Climate and exposure
  • Foundation, utilities and unloading
  • Local engineering and approval responsibilities
Open planning guide
13

International supply document checklist

Define the handover point, receiving party and required documents before shipment.

  • Destination and receiving point
  • Importer and customs responsibility
  • Final product list and packing scope
  • Required drawings, manuals and certificates
  • Onward transport, unloading and storage
Open planning guide
14

Resort & destination-development RFP checklist

Give Apollo enough project context to review suitable systems and any additional product requirements without turning the brief into a generic product list.

  • Destination, project stage, key count or overall development scale
  • Drawings, BOQ or product schedules where available
  • Required project zones and approximate quantities
  • Climate, coastal exposure and known technical requirements
  • Programme, freight constraints, receiving and local installation responsibilities
Open planning guide
15

Rooftop camping and vehicle fitment checklist

Treat vehicle limits and travel rhythm as the hard boundaries of the setup.

  • Exact vehicle, year and rack system
  • Published roof and payload limits
  • Tent and awning configuration
  • Water, storage and electrical additions
  • Full setup and pack-down test
Open planning guide
16

Pickup canopy fitment checklist

Confirm the pickup and complete touring role before freezing a TerraRise configuration.

  • Make, model, year, market and cab
  • Bed / tray length and current accessories
  • Canopy-only or rooftop-camping intent
  • Finished payload and storage plan
  • Photos, fitment notes and local vehicle requirements
Open planning guide
17

Outdoor live-fire site checklist

Plan the cooking zone, guest zone and local fire responsibilities before fixing the location.

  • Cooking format and service pattern
  • Stable non-combustible support strategy
  • Fuel handling and storage
  • Wind, smoke and guest circulation
  • Cleaning, maintenance and local fire review
Open planning guide

Interactive planning tools

Use the technical centre with the project tools.

Architect & specifier workflow

Turn product information into a project pack.

Use the dedicated architect/specifier pathway for early product coordination, then save products to My Apollo Project, compare systems and build a Tender & Specification Pack for project review.

Next public step

Turn the technical research into a project decision.

Send Apollo the current drawings, dimensions, quantity and destination when the project is ready for manual review.

Still comparing?

Move back into product discovery.

Use the product search to narrow systems by project need, or browse the full product directory before building the brief.

Apollo NZ Global

Technical information for product discovery and project planning. Final specification is confirmed at quotation.

sales@apollonzglobal.com
Project