Apollo NZ Global

Project evidence ยท application studies

Show the thinking behind the supply decision.

These examples are anonymised project studies, proposals and planning briefs drawn from real Apollo project work. They are labelled by status so a planning study is not presented as a completed installation or customer testimonial.

No invented testimonials Project status stated Product and local works separated
Conversion study
01Club sports

Two-court pickleball surface comparison

An existing club facility needed a practical comparison between continuous roll-out flooring and modular tile pathways rather than a one-product answer.

What the project needed reviewed

  • Existing base and drainage
  • PM-S / roll-out versus modular tile pathway
  • Two-court quantity and delivery structure
  • Local installation responsibilities
Project outcome

The project could be compared as two defined surface options with base suitability and local works kept separate from product supply.

Explore relevant product pathway
Supply proposal
02Sports technology

Two-camera AI sports capture package

A community sports enquiry required two AI camera units with a clear freight-to-site and technical setup pathway.

What the project needed reviewed

  • Camera quantity and sports use
  • Mounting position and coverage
  • Power/network considerations
  • Freight and delivery scope
Project outcome

The proposal separated camera supply, delivery and site setup requirements so the customer could understand the complete pathway.

Explore relevant product pathway
Design study
03Weather control

Large terrace opening protection

A terrace project with substantial concrete walls and pillars needed controllable weather protection while keeping local structural and installation work clearly defined.

What the project needed reviewed

  • Opening dimensions and support points
  • Blind versus stronger opening-protection pathways
  • Wind and storm exposure
  • Demountable/local interface requirements
Project outcome

The design study created separate product options instead of forcing every opening into the same system.

Explore relevant product pathway
Planning brief
04Modular buildings

Pacific modular accommodation concept

A Pacific accommodation concept required modular construction to be considered alongside cyclone exposure, high groundwater and local foundation decisions.

What the project needed reviewed

  • Intended accommodation use
  • Cyclone and coastal exposure
  • Foundation / high-water-table pathway
  • Local utilities, engineering and installation
Project outcome

The brief separated the supplied modular-building package from foundations, engineering, services and destination approvals before the configuration was frozen.

Explore relevant product pathway

Evidence standard

Completed projects will only be labelled completed when we have suitable evidence and permission.

As Apollo builds the new website evidence library, public project photography, location and customer identity will only be added where appropriate. Until then, application studies remain deliberately anonymised.

Have a similar project?

Send the real site conditions and compare the pathways.

Start a project brief