Search public handbooks, product pages, fitment material, specifications and project-planning tools. Drawings, certificates, warranties and other product documents are included where available for the relevant system.
Ask Apollo Technical
Search Apollo's technical library in plain language.
Ask a question about an Apollo product or project pathway and get an answer from the current technical information available on the website.
Technical search does not calculate pricing or replace project-specific engineering and professional advice.
Apollo Reference Library
Project guides, templates and technical references.
Use these resources to prepare scopes, compare options and structure project information before quotation and project review.
Project guides
Reusable references for briefs, specifications, procurement and technical submissions.
Use the current product page, applicable technical documents and project quotation when product-specific specifications, approvals or project performance need to be confirmed.
Technical Document Guide
Use each document within its actual scope.
This reference helps project teams understand how datasheets, test reports, certificates, calculations, drawings and warranties relate to the selected product and project.
Document type
What it can support
What it does not establish by itself
Product datasheet / specification
Published dimensions, materials, configurations, components and product-level characteristics stated for the identified model or family.
Prove suitability for every site, local code, wind zone, structural interface or unlisted configuration.
Independent test report
The test method, specimen, configuration and measured result recorded by the issuing laboratory for the tested scope.
Automatically extend the result to different sizes, materials, fixings, assemblies or installation conditions.
Certificate / product listing
The certification, listing or conformity scope stated by the issuing body, including the products and conditions actually covered.
Cover unrelated models, expired scopes, omitted accessories or project conditions outside the certificate.
Engineering calculation
The loads, geometry, material assumptions, supports and calculation basis stated in that specific engineering package.
Transfer automatically to another site, span, substrate, foundation or loading condition unless those items are included and checked.
Installation manual
The manufacturer's documented installation, setup, operation or maintenance pathway for the identified product.
Replace site measurement, structural adequacy, local trade competence, statutory approvals or project-specific engineering.
CAD / BIM / project drawing
Geometry, coordination, interfaces and dimensions represented in the current drawing or model for design development.
By itself prove structural performance, certification, fire performance or destination compliance unless the document explicitly carries that verified evidence.
Warranty document
The stated warranty period, covered components, exclusions, maintenance conditions and claim pathway for the identified product.
Act as independent proof of engineering performance, code compliance or suitability for every environment.
Use the exact current document for the exact product and configuration. Where available documentation does not cover the project condition, confirm the requirement through project-specific technical review.
Apollo Specification & Tender Guide
Write the requirement so technical information and responsibilities stay clear.
This cross-category reference helps architects, consultants and procurement teams describe Apollo systems without turning indicative information into guarantees or hiding project-specific responsibilities inside the product specification.
Specification area
Include
Avoid
Product identity
Name the exact Apollo product or system family and the configuration being specified where known.
Do not carry a family-level feature, dimension or certificate across every model by implication.
Technical values
Use dimensions, materials, finishes, test results and other values supported by the current product page and applicable technical documents.
Do not convert indicative or different-model information into a project guarantee.
Project-dependent requirements
State the project criteria that still need confirmation: loads, exposure, substrate, foundations, services, fixing, local compliance, access or installation conditions.
Do not present an unresolved site condition as though it were already confirmed product performance.
Scope + responsibilities
Separate Apollo product supply and any expressly included support from local engineering, site measurement, civil/electrical work, installation and approvals.
Do not hide local project responsibilities inside a generic phrase such as complete system unless the written scope defines them.
Alternatives / substitutions
Assess an alternative against application, dimensions/interfaces, materials, current technical information, maintenance, warranty/spares and destination requirements.
Do not treat price, appearance or a broad category match as proof of technical equivalence.
Document control
Reference the current Apollo product page, current quotation and current technical documents for the selected product or project package.
Do not allow an old downloaded file or superseded model reference to override current project information.
Reusable early-stage clauses
Copy the framework, then adapt it to the actual project.
These are generic coordination clauses, not legal advice and not a substitute for the project team's own specification, engineering or statutory review.
GENERAL SPECIFICATION WORDING
Current information clause
Product selection and specification shall be based on the current Apollo product page, current project quotation and current technical documents issued for the selected system. Superseded saved files should not be used where they conflict with current project information.
GENERAL SPECIFICATION WORDING
Technical information clause
Where a project requires stated performance, certification or testing, use current technical information applicable to the exact product and configuration offered. Different sizes, materials, fixings or assemblies may require separate review.
GENERAL SPECIFICATION WORDING
Supply-scope clause
Apollo's quoted scope is product supply and specifically stated supporting information. Site measurement, local engineering, foundations, civil or electrical works, installation and statutory approvals remain with the purchaser's appointed project team unless expressly included in writing.
GENERAL SPECIFICATION WORDING
Alternative / substitution clause
Any proposed alternative shall demonstrate equivalent project suitability against the specified application, dimensions and interfaces, material and finish, technical documentation, warranty and spares, maintenance requirements and destination conditions. Price or visual similarity alone does not establish equivalence.
GENERAL SPECIFICATION WORDING
Technical submittal clause
Technical submittals shall identify the exact product, model, material, finish and configuration offered and shall include the current project-relevant drawings, data sheets, test reports, certificates and other documents requested by the project team. Documents for a different model or configuration should be clearly identified.
GENERAL SPECIFICATION WORDING
Samples and mock-ups clause
Where samples or mock-ups are required, the approved sample or mock-up shall establish the agreed visual, material or assembly reference for the project within its stated scope. Approval of appearance does not by itself establish structural, fire, weather, code or other performance compliance.
GENERAL SPECIFICATION WORDING
Revision and change-control clause
Drawings, schedules and technical documents shall carry a revision or issue date. Any change to dimensions, materials, finishes, loads, interfaces, accessories or other project-critical information after approval shall be identified and reviewed before manufacture or procurement continues.
GENERAL SPECIFICATION WORDING
Packaging and logistics clause
The quoted supply scope shall identify the agreed packaging method, crate or bundle identification, shipping dimensions and project handover point. Import clearance, onward transport, unloading, storage and site movement responsibilities shall remain with the party identified in the written project scope.
GENERAL SPECIFICATION WORDING
Warranty and spare-parts clause
The supplied warranty, exclusions, maintenance conditions, claim pathway and responsible legal entity shall be identified before order. Where lifecycle support is material to the project, spare parts, replacement components and expected replacement lead times shall be confirmed separately.
Product-specific technical values should be checked against the current product page, relevant technical documents and project quotation. Use the Technical Document Guide when reviewing a report, certificate or calculation for a tender requirement.
Search + filter
Find a document or technical pathway.
Public resources stay open to customers and specifiers. Approved trade partners can use the secure portal for partner-only material as it is added.
No technical document matches those filters. The technical product library below may still contain the current information.
Technical product library
Specifications, planning guidance and current product pages.
These entries stay searchable alongside downloadable files so product information is not hidden simply because a PDF has not been published.
Linkable project resources
Field checklists for better product briefs.
These concise checklists are designed to be bookmarked, shared with project teams and linked directly from specifications, club notes, school planning documents or partner resources. Each checklist points to the fuller Apollo planning guide.
01
ATHREN FIELD sports-turf project checklist
Capture the field and evidence pathway before the exact turf construction is selected.
Primary sport and level of play
Field footprint and shared-use requirements
Federation / tender requirement
Base, levels and drainage status
Water, infill and shockpad strategy
Goals, perimeter, lighting and spectators
Maintenance, installation and testing responsibilities
Give Apollo enough project context to review suitable systems and any additional product requirements without turning the brief into a generic product list.
Destination, project stage, key count or overall development scale
Drawings, BOQ or product schedules where available
Required project zones and approximate quantities
Climate, coastal exposure and known technical requirements
Programme, freight constraints, receiving and local installation responsibilities
Use the dedicated architect/specifier pathway for early product coordination, then save products to My Apollo Project, compare systems and build a Tender & Specification Pack for project review.