Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Request Project Pricing

Resorts & destination developments · Global project supply

Build the development around the brief — with supply pathways beyond a fixed catalogue.

Apollo combines established product systems with project-specific supply options for resorts, hotels, branded residences and destination developments. Send the RFP first; Apollo can then assemble the right product pathway around the project.

Fiji · Pacific · Middle East · GlobalExisting systems + project-specific supplyRFP-led manual quotation
Boutique resort development with guest villas, arrival pavilion and hospitality buildings

Quick project answers

What does Apollo actually do for a resort or destination development?

Apollo works from the project brief first, using established systems where they fit and project-specific supply options where the development needs something beyond the published catalogue.
01

What can Apollo supply for a resort or destination development?

Apollo can coordinate product pathways across villas, pool and beach areas, wellness, food and beverage, sports and recreation, family amenity, public realm, architectural systems and selected waterfront requirements. The final scope is built around the actual RFP rather than a fixed package.

02

Does every resort product need to already be listed on the Apollo website?

No. The published catalogue is the starting point, not the limit. Suitable project requirements can be reviewed specifically for the brief, with product information and supply scope confirmed before quotation.

03

What information should be included in the resort RFP?

Useful starting information includes the destination, project stage, key count or development scale, drawings or BOQ, required project zones, approximate quantities, target programme, logistics constraints and any known performance or compliance requirements.

04

Does Apollo install resort and development products?

Apollo is supply-only. Installation, site supervision, local engineering sign-off and statutory compliance remain with the manufacturer, approved specialist or client-side project team as applicable to the selected product and destination.

05

Can Apollo review resort projects internationally?

Yes. Apollo can review suitable resort and destination-development briefs across international markets, with product configuration, documentation, freight and local-project responsibilities assessed against the actual destination.

Phase 2 / model-specific evidence & project release

One resort programme; verified records for each supply package.

A development may combine pools, roofs, umbrellas, screening, buildings, recreation, public realm and waterfront systems. Each remains a distinct manufacturer and technical evidence stream.

01

Development schedule

Confirm: Identify destination, drawings, key count, zones, quantities, project phase, site access and receiving-port requirements.

Boundary: No sample planning scenario establishes real customer quantities, budget, timing or achieved results.

02

Product and technical register

Confirm: Link every selected model and product-family item to its own manufacturer's technical documentation.

Boundary: A similar-looking product cannot establish the specification of the proposed installation.

03

Climate and interfaces

Confirm: Check coastal/salt and wind conditions, foundations, power and drainage, public use, pool water services and compatible connections for every zone.

Boundary: Local project professionals control site design and statutory approvals.

04

Consolidated procurement

Confirm: Collect technical sheets, verified certificates, installation packs, warranty schedules, packing dimensions, staged shipments and local-work matrix.

Boundary: A coordinated supply schedule is not a single certified construction assembly.

Sample masterplans and Sun & Shade planning scenarios demonstrate possible product combinations, not completed Apollo projects. The customer RFP establishes the real site, quantities, logistics and verified supply scope.

Specifier evidence checklist

Confirm the exact Resort & Destination Development Sourcing project evidence before release.

Use this checklist to turn an early product choice into a project-ready brief. Only exact registered evidence should be relied on for specification, tender or order.

01

Application & use

Confirm: Intended users / buyers: hospitality-resort · commercial-development. Confirm the actual application, operating intensity and project outcome.

Boundary: A product-category match is not a final suitability confirmation.

02

Site & environment

Confirm: Confirm the actual site, exposure, climate, drainage and destination conditions.

Boundary: Environmental performance claims must match the exact selected system and current evidence.

03

Configuration & dimensions

Confirm: Confirm configuration: project-reviewed, together with dimensions, quantities, interfaces and required options.

Boundary: Do not infer available sizes, spans, loads or options from representative imagery.

04

Materials, finishes & maintenance

Confirm: Confirm material, finish, corrosion, cleaning, maintenance and replacement requirements.

Boundary: Material suitability can change with exposure, assemblies and maintenance conditions.

05

Technical evidence

Confirm: Request current configuration-specific technical information before specification, tender or order.

Boundary: CAD, shop drawings, structural calculations, certificates and testing are included only where they exist for the exact system and are expressly identified.

06

Drawings & submittals

Confirm: No controlled drawing record is currently centralised for this pathway. Request the exact drawing, fixing detail, shop-drawing scope or submittal information required for the project.

Boundary: A brochure, website diagram or representative image is not a fabrication, installation or engineering drawing.

07

Market & destination

Confirm: This product has an explicit Apollo market-priority record. Confirm destination-specific standards, climate, freight, documentation and local compliance separately.

Boundary: Market priority is not evidence of code compliance, certification, structural suitability or installation approval in that destination.

08

Tender & procurement wording

Confirm: State the exact product pathway, configuration, dimensions, material / finish, required evidence, supplied scope, exclusions, delivery point and local responsibilities in the project schedule.

Boundary: Do not turn representative website wording, unverified supplier claims or another configuration's test data into a project compliance clause.

09

Project interface & delivery

Confirm: Confirm destination, receiving point, unloading, local contractor, foundations / supports, services, installation responsibility and target programme.

Boundary: Freight, local works, engineering, commissioning and installation scope must be confirmed in the written quotation.

Apollo is supply-only unless the written project scope states otherwise. Local engineering, statutory approvals, site works and installation remain project-specific.

Project pathways

Start with the part of the development you are planning.

The website shows capability by project zone. If the exact product is not listed, Apollo can still review the requirement through the project RFP.

01

Sun & Shade / Complete Resort Collection

Explore an integrated resort shade pathway covering pool, beach, villas, restaurants, wellness, arrival and guest circulation, with separate Apollo architectural brands retained.

Explore resort sun & shade
02

Interactive Resort Shade Masterplan

Select guest environments, build a combined shade supply schedule, and prepare a coordinated project brief across Apollo specialist brands.

Plan a multi-zone shade package
03

Resort Building Packages

Seven coordinated building pathways covering guest villas, lodge/common buildings, reception, restaurant/bar, wellness, staff accommodation and back-of-house/service infrastructure.

Explore building systems
04

SARENTA resort & glamping structures

Lightweight hospitality structures for glamping resorts, retreats, destination accommodation and nature-led guest experiences.

Explore SARENTA RESORT
05

ORDRAN pool systems for resorts, hotels & villas

Explore ORDRAN standard, made-to-measure and selected modular pool pathways for private villas, resort pools, boutique hospitality and pool-plus-wellness environments. Exact dimensions and engineering are project-specific.

Explore ORDRAN resort pools
06

ORDRAN developer & multi-pool programmes

Plan repeatable pool types, agreed finish and equipment schedules, delivery quantities and staged releases for resort villas and property developments. Detailed requirements are reviewed individually.

Open multi-pool programme pathway
07

Complete wellness zones

Coordinate pool, sauna, cold plunge, hot tub, privacy, shelter, guest circulation, services and maintenance as one resort wellness environment.

Explore complete wellness zones
08

Guest villas + residences

Apollo can combine established architectural and living systems with project-sourced furniture, casegoods and amenity products around the villa, suite or branded-residence brief.

Explore project zone
09

Pool + beach

Use AUREMONT where a resort can repeat one of four standard modular pool sizes, or ORDRAN where the pool needs project-specific geometry, infinity edges, windows or architectural integration. Shade, loungers, daybeds, cabanas, umbrellas, showers and service furniture can then be coordinated around the chosen pool pathway.

Explore project zone
10

Wellness + spa

Resort wellness projects can combine AUREMONT standard-size pools, ORDRAN WELLNESS / architectural pools, Apollo outdoor saunas, cold plunge and wood-fired hot-tub systems with privacy, shelter, shower/rest areas and selected project-sourced commercial wellness equipment.

Explore project zone
11

Restaurants + bars

Apollo's established outdoor-kitchen, live-fire, shelter and furniture ranges can be combined with project-sourced bars, kiosks, dining furniture and selected hospitality equipment.

Explore project zone
12

Sports + recreation

Apollo already has a substantial sports platform spanning padel, pickleball, multi-sport surfaces, RIDEspan, SLOPEspan, fitness and venue infrastructure, with additional resort recreation sourced to brief.

Explore project zone
13

Family + water play

Apollo can source commercial playgrounds, splash pads and interactive water-play systems to complement pools, sports, public realm and family amenity zones.

Explore project zone
14

Landscape + public realm

CIVARO, SVALDR and Apollo's architectural systems provide a strong base for arrival areas, paths, gardens, recreation zones and shared outdoor spaces, with additional project items sourced where required.

Explore project zone
15

Architectural systems

Apollo's existing architectural portfolio can support villas, restaurants, pool areas, arrival spaces and shared amenity zones without requiring a separate resort-only product range.

Explore project zone
16

Resort, Leisure & Waterfront Systems

TIRREN brings modular floating docks and walkways, PWC and drive-on boat docks, marina platforms, swim and event platforms, floating-leisure-pool pathways, aluminium-frame docks and custom floating configurations into one project-led resort and marine pathway.

Explore project zone
17

TIRREN resort, hospitality, leisure & waterfront systems

Hospitality solid-surface systems for bathrooms, baths, wet areas, reception, bars, kitchens and bespoke fabrication, plus modular docks, craft access, walkways and waterfront platforms.

Explore TIRREN systems
18

Sample & finish review

Request material, fabric, finish or product samples for a resort project where a physical review will help the design or procurement team.

Request sample / finish
19

Resort & destination development planning guide

Use the full planning reference for project zones, climate, guest operations, supply capability, freight, local responsibilities and RFP-led sourcing.

Open planning guide

Project priorities

Apollo's value is the ability to coordinate a broader package without pretending every item is permanently stocked.

01

RFP first

A BOQ, drawing set, product schedule or early project brief gives Apollo enough context to begin qualifying supply routes.

02

Existing + project-specific

Use established Apollo brands where they fit and review additional commercial products only where the project needs them.

03

Project fit before quotation

Product capability, documentation, export support, warranty and relevant engineering responsibilities are confirmed for the proposed supply pathway.

04

Supply-only clarity

Apollo coordinates the product supply pathway. Installation, site supervision, engineering sign-off and local statutory responsibilities remain with manufacturers, approved specialists or the client-side project team as applicable.

05

Destination-aware

Coastal salt, high UV, heat, severe wind, freight access and local standards are part of the project brief from the beginning.

06

Broader product capability

The RFP pathway allows Apollo to review suitable project products beyond the permanent published catalogue.

How Apollo fits

One RFP can become a multi-zone Apollo supply package.

Project-specific products are quoted against the actual brief. Final specifications, certifications, engineering and installation pathways remain product- and destination-specific.

01

Define the project

Country, project stage, key count, public areas, drawings, BOQ, timing and destination logistics establish the commercial brief.

02

Break it into zones

Apollo separates the requirement into villas, pool and beach, wellness, F&B, sports, family amenity, public realm, architecture and waterfront.

03

Match the supply pathway

Apollo matches established systems and project-specific supply options to each zone of the brief.

04

Prepare the project offer

Apollo quotes the products, documentation and supply responsibilities confirmed for the project.

Relevant Apollo systems

Products can be selected individually or combined around the project.

Resort Building Packages Apollo Building Shell Systems SARENTA RESORT TIRREN — Resort, Leisure & Waterfront Systems TIRREN Modular Floating Dock Systems TREVIK Architectural Opening Systems CADARN AUVENOR Architectural Systems Velaris Outdoor Blind Systems Architectural Façades & Surface Systems NORDVAL Outdoor Kitchens SVALDR CIVARO Street Furniture & Civic Amenities ORDRAN Pool SystemsComplete Wellness ZonesOutdoor Saunas Cold Plunge Systems Wood-Fired Hot TubsPickleball Multi-Sport Courts Modular Pump Tracks SLOPEspan SKELVAR interior furniture Resort furniture — project specificSpecialist wellness — project specificPlay & water play — project specific
Product snapshot

Resort & Destination Development Sourcing

Coordinated wholesale and project-supply sourcing for resorts, hospitality operators, developers and destination projects. Product packages are selected around project scope, environment, documentation, quantities, freight and local delivery responsibilities.

Apollo NZ GlobalResort & Development BuildingsListed product pathway
Applications

Hospitality Resort · Commercial Development · Resorts · Developers

Configuration

Project Reviewed

Environment

Project Specific · Coastal Review · High Heat Review · Resort Operations

TechnicalTechnical documents not yet centralisedDrawingsDrawing review by projectRegionalExplicit regional project mappingRelated4 controlled pathwaysSupply modelSupply-only · manual project quotation

This snapshot summarises the current Apollo product record. Final configuration, interfaces, engineering, certification and destination requirements are confirmed against the project.

Project planning

Useful product details at a glance.

Product information
OptionProject Ready

Apollo's catalogue owner, project-brief pathway and core product record are complete enough to progress into project review and manual quotation. This is not a statement of engineering approval or destination compliance.

DocumentationRegion Mapped

Apollo has an explicit regional priority map for this product. Regional mapping supports discovery and project review; it is not blanket compliance certification.

Project checkTechnical Review Required

Configuration, technical evidence, interfaces, exposure or destination requirements need product-specific review before the final supply package is confirmed.

Build project brief

Final engineering, testing, approvals and destination requirements are confirmed for the actual project where applicable.

Connected project pathway

Everything you need to take the next project step.

Resorts & Destination Developments
Planning & specification

Resort & Destination Development Sourcing: what to define before quotation.

Coordinated wholesale and project-supply sourcing for resorts, hospitality operators, developers and destination projects.

Applications
  • residential projects
  • commercial projects
  • hospitality projects
  • international projects
Specification evidence
  • Verified product specifications or documented product facts
  • Clear applications, limitations and configuration boundaries
  • Project inputs required for manual quotation or technical review
  • Apollo supply-only scope and purchaser/local-project responsibilities
Compare before selecting
  • Dimensions, capacity or coverage required for the real site.
  • Materials, finishes and environmental exposure.
  • Installation, interfaces, services and maintenance access.
  • Technical documents, local approvals and project responsibilities.
Regional project pathwayResort & Destination Development Sourcing for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Technical informationNeed a datasheet, drawing, test report or tender submittal?

No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.

Request technical information

Relevant project sectors

See this system in the buying context that matches the project.

Browse all sectors

Regional project authority

See how this product is planned for priority markets and countries.

These pages connect commercial search intent to destination-specific climate, site, freight, procurement and project-brief guidance without changing the wider global availability of the product.

Institutional & project buyers

Follow the pathway that matches the organisation buying the product.

New Zealand + international · Practical project supply

Send the brief before you have every detail resolved.

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Project