RIDEspan · technical project checklist
What should be confirmed before the final supply package?
Use the RIDEspan handbook for early planning, then confirm the exact information that applies to the selected layout and site before specification, procurement or supply.
01Layout + module schedule
Confirm: Exact selected layout, module count/types, track envelope, entry/exit orientation and any project-specific module substitutions.
Boundary: Catalogue envelope dimensions do not include all required circulation, clear zones or surrounding site works.
02Module construction
Confirm: Current material/construction, riding-surface finish, connections/fasteners and replaceable-module details for the supplied system.
Boundary: Do not infer durability or performance from generic moulded-track descriptions.
03Base + levels
Confirm: Required supporting surface, flatness/levels, edge transitions and any prepared-base requirements for permanent, relocatable or temporary use.
Boundary: The modular track still relies on a suitable site/base condition.
04Drainage
Confirm: Site falls, runoff path, subsurface drainage where required and how water is kept from ponding around or beneath modules.
Boundary: Track modules do not replace the site's civil drainage design.
05Anchoring + stability
Confirm: Exact anchoring or stabilisation method for the selected layout/site and any local engineering or public-space requirements.
Boundary: Temporary, relocatable and permanent installations may require different restraint strategies.
06Assembly + tolerances
Confirm: Assembly sequence, connection checks, alignment/tolerance requirements, lifting/handling and installer responsibilities.
Boundary: Straightforward modular assembly still requires a controlled installation and inspection process.
07Safety + site interfaces
Confirm: Rider flow, perimeter/clear zones, supervision sightlines, accessible circulation, signage and interaction with paths/seating/landscape.
Boundary: These are site-planning requirements and should not be inferred from track envelope alone.
08Inspection + maintenance
Confirm: Routine inspection points, connection checks, surface/module damage criteria, cleaning, replacement module process and warranty requirements.
Boundary: Public and school installations need an owner inspection/maintenance regime after handover.
The RIDEspan handbook is the public planning reference. Project-specific technical information should always be matched to the selected configuration and actual site.