Skip to main content
Apollo NZ Global
Request Project Pricing

RIDEspan PUMP · COMPLETE MODULAR PUMP TRACKS

RIDEspanActive Recreation SystemsA LUTHVAR sports brand

Complete modular pump tracks for schools, councils and community spaces.

RIDEspan is a relocatable, reconfigurable wheeled-recreation system built from connected modular sections for bicycles, BMX, scooters, skateboards and balance-bike riders. For schools and councils, the system can start compact, expand over time and be planned around rider age, supervision, community participation, site footprint and future growth.

Schools + councils Relocatable + reconfigurable Expandable modular system
RIDEspan modular pump track in a landscaped community park with riders following one-way flow

RIDEspan · direct answers

What project teams need to know before choosing a modular pump track.

RIDEspan PUMP is Apollo's complete modular pump-track pathway, kept separate from FLOW compact riding elements, STREET features and SKILLS development systems. School and council pages provide audience-specific planning support.
01

What is a modular pump track?

RIDEspan is a relocatable and reconfigurable wheeled-recreation system assembled from connected track modules for bicycles, BMX, scooters, skateboards and balance-bike riders. Layouts can start compact, expand later and be adapted around the available site.

02

Who are RIDEspan pump tracks designed for?

The current project pathways include schools, council parks, community reserves, bike and BMX facilities, resorts, holiday parks, developments and destination-recreation projects, with the final layout selected around rider group, supervision, footprint and future growth.

03

What should be supplied for a pump-track project review?

Provide the project location, target riders, available footprint, existing surface or base, access, preferred layout if known, timing, delivery region and any colour or branding requirements. Site drainage, clear zones and surrounding circulation should be considered alongside the track envelope.

04

Does Apollo install RIDEspan pump tracks?

Apollo supplies the modular system and project information. Base preparation, anchoring, site works, installation labour, local engineering and approvals remain project-specific and are assigned in the final project scope.

01SchoolsActive play · progression · shared use
02CouncilsParks · reserves · community recreation
03FormatModular · relocatable · expandable
04RidersBikes · BMX · scooters · skateboards · balance bikes

Why modular?

A recreation asset that can change with the site.

RIDEspan is strongest where a project needs more flexibility than a permanently formed track can offer. A modular approach can support staged investment, future expansion, relocation and individual component replacement while still creating a defined riding facility.

01

Start smaller

Select a compact layout now and retain a pathway to extend the system as demand, budget or available space changes.

02

Relocate

Where the project and site allow, the modular system can be considered for future relocation rather than being permanently tied to its first position.

03

Reconfigure

Connected modules create a pathway to alter the riding experience or adapt the arrangement as the programme develops.

04

Replace by component

Individual modules can be reviewed and replaced without treating the whole riding facility as one permanent site-built surface.

05

Stage the project

Schools, councils and developers can plan the track together with later shade, seating, hydration, bike parking and wider public-realm works.

06

Use the site intelligently

Existing prepared areas may be considered where the actual base, levels, drainage, clear zones and anchoring requirements are suitable.

RIDEspan learning centre

Learn the project before you specify the product.

Use the pathway that matches the decision-maker. Schools focus on teaching, supervision and progression; councils on need, site fit and lifecycle; developers on masterplanning, staging and handover.

Priority project pathways

Built around schools, public recreation and development projects.

RIDEspan is particularly strong where buyers need a compact recreation asset that supports participation now while retaining a pathway to reconfigure, relocate or expand later.

System construction

Connected modules. Fast assembly. A track that can change.

RIDEspan uses moulded modular track sections connected into linear pump cycles, compact loops and larger flow layouts. The system is designed for straightforward assembly, reconfiguration and future extension, with additional module combinations able to be developed around a project brief.

Weather-resistant modular construction Textured riding surface for grip Simple connection system for assembly Individual modules can be repositioned or replaced Layout can be modified as rider needs change Custom module combinations available by project
RIDEspan modular pump track system showing module types and connection detailRIDEspan indicative Starter Loop, School Circuit and Community Circuit planning configurations

Standard layout family

Eleven catalogue layouts, from compact pump cycles to Dual Turbo.

Nominal layout dimensions below are taken from the RIDEspan product catalogue and are useful for early site feasibility. They describe the track envelope only; final clear zones, access, drainage and local requirements must be added around the selected layout.

RIDEspan modular pump track configuration overview for early site planning

Choose by project scale

Start with the site, rider group and intended role.

The catalogue layout is the starting envelope. Apollo can then review the selected format against access, rider flow, surrounding circulation, supervision and the wider recreation brief.

Open Pump Track Planner

Start

Pump Cycle 112.6 × 1.0 m8 modulesEntry riding lines · very compact sites
Pump Cycle 216.4 × 1.0 m10 modulesLonger entry line · skills progression

School / compact

Velocity Loop 116.6 × 6.4 m34 modulesSchools · compact parks · first loop
Velocity Loop 220.4 × 6.4 m38 modulesSchools · community recreation
Wild Twist24.2 × 6.5 m49 modulesLinear sites · active recreation zones

Community

Nova Trek16.6 × 15.1 m39 modulesParks · reserves · mixed rider groups
Stellar19.6 × 11.6 m40 modulesCommunity facilities · progression
Cosmo20.4 × 12.4 m48 modulesLarger schools · public recreation
Viper16.4 × 12.6 m62 modulesHigher-capacity community riding

Destination

Primetime22.0 × 16.6 m96 modulesLarge parks · destination recreation
Dual Turbo35.5 × 23.0 m172 modulesMajor community and destination sites

Modular vs site-built

Choose the construction pathway that suits the project.

Modular is not automatically the right answer for every site. RIDEspan is strongest when adaptability, staging and relocation matter; permanent formed tracks remain strong where the brief calls for highly bespoke terrain and a fixed long-term destination asset.

Project considerationRIDEspan modularSite-built track
Relocation pathwayStrongGenerally fixed
ReconfigurationStrongLimited
Staged expansionStrongMore involved
Individual component replacementYesRepair / resurfacing
Potential use of suitable prepared areasProject-dependentTypically greater site works
Highly bespoke permanent terrainMore limitedStrong
Permanent destination-scale earth shapingNot the core roleStrong

Inclusive wheeled recreation

One facility. More than bicycles.

The modular track format is intended for a broad wheeled-sports audience, allowing a single recreation asset to support different ages, skills and riding styles.

Rider typeBicyclesRider typeBMXRider typeScootersRider typeSkateboardsEntry pathwayBalance bikesProgressionBeginner → experienced
RIDEspan modular pump-track system showing the supplied module family and connection approach

Plan beyond the track

The best facility works around the riding line.

RIDEspan planning includes the track itself plus circulation, safety, supervision and the surrounding public space.

DrainagePositive falls and subsurface drainage where required.SightlinesClear supervision from paths and key vantage points.AccessAccessible paths, entry points, parking and service access.ViewingSeating, bike racks, shade and places to gather.Track envelopeClear run-offs and safety zones around the perimeter.Entry / exitDefined rider flow and safe transition points.

Where RIDEspan fits

One system, a wide range of recreation environments.

The facility can be shaped around the user group, available area, progression goals, installation approach and future expansion plan.

SchoolsCouncil parksCommunity recreation reservesPublic parksBMX clubsBike parksDevelopmentsResortsSki resortsHoliday parksCommunity centresTemporary event venuesResidential developmentsDestination recreation

Council · school · developer procurement

Turn the layout into a project-ready supply package.

For procurement and early design, the useful output is not just a track name. Apollo can structure the supply proposal around the selected layout, the real site and the information the purchaser or consultant needs to review.

01

Selected layout

Track envelope, module count and project configuration.

02

Site interface

Base condition, access, drainage, clear zones and surrounding circulation.

03

Finish schedule

Confirmed colour selection and approved branding requirements where applicable.

04

Technical information

Available drawings, installation information, warranty and maintenance material for the selected system.

05

Supply scope

Clear separation between supplied RIDEspan components and local civil works, installation, engineering and approvals.

06

Delivery pathway

Project location, freight scope, programme stage and quotation requirements.

Installation pathways

Match installation to the site.

RIDEspan is designed around modular assembly and can suit permanent, relocatable and temporary/event pathways depending on the project. Final base preparation, anchoring, local works and installation responsibility are defined in the project scope.

Colour + identity

Make the facility belong to the place.

Documented colour options include blue, green, yellow, purple, red and black. Branding can be applied to module sides, entry features and signage subject to final artwork and project scope.

Care cycle

Inspect. Maintain. Record.

Routine care focuses on connections, fixings, riding-surface condition, surrounding site, cleaning, drainage and prompt replacement of damaged components. RIDEspan carries a 10-year component warranty*; final warranty terms are supplied with the project quotation.

Regional project authority

See how this product is planned for priority markets and countries.

These pages connect commercial search intent to destination-specific climate, site, freight, procurement and project-brief guidance without changing the wider global availability of the product.

Market Decision Centre

See where this system sits inside real destination decisions.

These guides connect the product to a specific market, project type and competing system pathway so buyers can narrow the brief before requesting pricing.

Plan · compare · specify

Go deeper before choosing the layout.

What Apollo needs to quote

Start with the site and the riders.

Send what you know. We can narrow the layout from there.

01Project name + site02Target users03Available footprint04Preferred layout05Current surface + preparation06Site access07Budget stage08Target timing09Colours / branding10Delivery region

RIDEspan · technical project checklist

What should be confirmed before the final supply package?

Use the RIDEspan handbook for early planning, then confirm the exact information that applies to the selected layout and site before specification, procurement or supply.

01

Layout + module schedule

Confirm: Exact selected layout, module count/types, track envelope, entry/exit orientation and any project-specific module substitutions.

Boundary: Catalogue envelope dimensions do not include all required circulation, clear zones or surrounding site works.

02

Module construction

Confirm: Current material/construction, riding-surface finish, connections/fasteners and replaceable-module details for the supplied system.

Boundary: Do not infer durability or performance from generic moulded-track descriptions.

03

Base + levels

Confirm: Required supporting surface, flatness/levels, edge transitions and any prepared-base requirements for permanent, relocatable or temporary use.

Boundary: The modular track still relies on a suitable site/base condition.

04

Drainage

Confirm: Site falls, runoff path, subsurface drainage where required and how water is kept from ponding around or beneath modules.

Boundary: Track modules do not replace the site's civil drainage design.

05

Anchoring + stability

Confirm: Exact anchoring or stabilisation method for the selected layout/site and any local engineering or public-space requirements.

Boundary: Temporary, relocatable and permanent installations may require different restraint strategies.

06

Assembly + tolerances

Confirm: Assembly sequence, connection checks, alignment/tolerance requirements, lifting/handling and installer responsibilities.

Boundary: Straightforward modular assembly still requires a controlled installation and inspection process.

07

Safety + site interfaces

Confirm: Rider flow, perimeter/clear zones, supervision sightlines, accessible circulation, signage and interaction with paths/seating/landscape.

Boundary: These are site-planning requirements and should not be inferred from track envelope alone.

08

Inspection + maintenance

Confirm: Routine inspection points, connection checks, surface/module damage criteria, cleaning, replacement module process and warranty requirements.

Boundary: Public and school installations need an owner inspection/maintenance regime after handover.

The RIDEspan handbook is the public planning reference. Project-specific technical information should always be matched to the selected configuration and actual site.

Complete the recreation site

Plan beyond the riding modules.

A stronger pump-track project considers the whole user journey: arrival, riding, supervision, rest, hydration, shade and movement through the surrounding public space.

RidingRIDEspan track

Selected layout, rider flow, entry and exit, clear zones and future expansion.

Public realmSeating + bike parking

Waiting areas, spectator positions, bike racks and practical gathering space.

ComfortShade + shelter

Consider shade and weather protection around waiting, viewing and rest areas.

AmenityHydration

Public drinking and bottle-filling can be coordinated where the wider site brief requires it.

OperationLighting + signage

Coordinate operating hours, rider information, rules, wayfinding and appropriate site lighting.

Project briefBring the site together

Send the footprint, user group, location and preferred layout so the supply scope can be structured around the project.

Start project brief
Apollo NZ Global

RIDEspan modular pump tracks for schools, councils, parks and community recreation · Global products. Global projects. Practical supply solutions.

sales@apollonzglobal.com
Project