Footprint + rider flow
Define the usable footprint, entry and exit points, circulation and separation from pedestrians or other recreation activities.
Start NZ Project BriefNew Zealand / Active recreation
RIDEspan provides a modular pathway for staged, relocatable and expandable pump-track projects. New Zealand planning should start with riders, footprint, base, drainage, supervision, circulation and the surrounding public space.

New Zealand project context
This pathway adds local project context while current specifications, options and technical evidence remain on the main Apollo product pages so project teams work from one current source.
Define the usable footprint, entry and exit points, circulation and separation from pedestrians or other recreation activities.
A modular system still depends on a suitable prepared base and a drainage strategy for the site.
Supervision, age groups, signage, maintenance and surrounding public-realm elements should be considered with the track layout.
Product pathways
Use these pages for current product scope, options and technical information.
Project brief
A clear first brief makes it easier to confirm product fit, freight, documentation and local-work interfaces before pricing.
New Zealand questions
Yes. Apollo reviews New Zealand enquiries for modular pump tracks through the RIDEspan pathway. Final availability, configuration, freight and documentation are confirmed for the actual project.
Apollo is primarily a supply-only specialist. Local site works, foundations, electrical work, engineering, approvals and installation are coordinated separately unless a project-specific written scope says otherwise.
Send the town or region, intended use, dimensions or drawings, site photographs, quantities, target timing and any known coastal, wind, drainage, access or local-compliance requirements.
New Zealand project supply
Apollo can review the relevant product pathway, available documentation, freight and supply scope. Local engineering, approvals, civil works, electrical work and installation remain with the appointed New Zealand project team unless expressly included in writing.