Base + drainage
Existing asphalt, concrete or new-build bases need to be assessed before a surface or court package is selected.
Start NZ Project BriefNew Zealand / Sport + recreation
Apollo's New Zealand pickleball pathway connects court surfaces with nets, fencing, lighting, covers, acoustic planning and supporting facility infrastructure. The right package starts with the site, player demand and whether the project is indoor, outdoor, converted or purpose-built.

New Zealand project context
This pathway adds local project context while current specifications, options and technical evidence remain on the main Apollo product pages so project teams work from one current source.
Existing asphalt, concrete or new-build bases need to be assessed before a surface or court package is selected.
Outdoor pickleball can require early consideration of operating hours, nearby receivers, screening and acoustic treatment.
Clubs and councils should plan court count, lighting, spectators, storage and possible future expansion together.
Product pathways
Use these pages for current product scope, options and technical information.
Project brief
A clear first brief makes it easier to confirm product fit, freight, documentation and local-work interfaces before pricing.
New Zealand questions
Yes. Apollo reviews New Zealand enquiries for pickleball courts through the Apollo Pickleball Systems pathway. Final availability, configuration, freight and documentation are confirmed for the actual project.
Apollo is primarily a supply-only specialist. Local site works, foundations, electrical work, engineering, approvals and installation are coordinated separately unless a project-specific written scope says otherwise.
Send the town or region, intended use, dimensions or drawings, site photographs, quantities, target timing and any known coastal, wind, drainage, access or local-compliance requirements.
New Zealand project supply
Apollo can review the relevant product pathway, available documentation, freight and supply scope. Local engineering, approvals, civil works, electrical work and installation remain with the appointed New Zealand project team unless expressly included in writing.