Specifier evidence checklist
Confirm the exact RIDEspan Pump Tracks for Councils project evidence before release.
Use this checklist to turn an early product choice into a project-ready brief. Only exact registered evidence should be relied on for specification, tender or order.
01Application & use
Confirm: Intended users / buyers: councils-public-realm. Confirm the actual application, operating intensity and project outcome.
Boundary: A product-category match is not a final suitability confirmation.
02Site & environment
Confirm: Confirm the actual site, exposure, climate, drainage and destination conditions.
Boundary: Environmental performance claims must match the exact selected system and current evidence.
03Configuration & dimensions
Confirm: Confirm configuration: modular-configurable, together with dimensions, quantities, interfaces and required options.
Boundary: Do not infer available sizes, spans, loads or options from representative imagery.
04Materials, finishes & maintenance
Confirm: Confirm material, finish, corrosion, cleaning, maintenance and replacement requirements.
Boundary: Material suitability can change with exposure, assemblies and maintenance conditions.
05Technical evidence
Confirm: Use the current registered product documents and confirm that every cited value applies to the selected configuration.
Boundary: CAD, shop drawings, structural calculations, certificates and testing are included only where they exist for the exact system and are expressly identified.
06Project interface & delivery
Confirm: Confirm destination, receiving point, unloading, local contractor, foundations / supports, services, installation responsibility and target programme.
Boundary: Freight, local works, engineering, commissioning and installation scope must be confirmed in the written quotation.
Apollo is supply-only unless the written project scope states otherwise. Local engineering, statutory approvals, site works and installation remain project-specific.