Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Request Project Pricing

DORVARN · Access & Perimeter Systems

Control today. Protect tomorrow.

DORVARN brings barriers, bollards, gate automation, vehicle detection, credential access, connected controls and acoustic boundary systems into one project-led access and perimeter platform for commercial, hospitality, industrial, residential, sports and institutional sites.

New Zealand + global project supplyVehicle + pedestrian accessProject-led system selectionDestination compliance verified
DORVARN integrated access and perimeter system design

Quick project answers

Key questions, answered clearly.

01

What is DORVARN Access & Perimeter Systems?

Access, perimeter and acoustic/noise-control project supply for commercial, sports, industrial and public environments.

02

What projects are suitable for dorvarn access & perimeter systems?

Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.

03

What information is needed to specify dorvarn access & perimeter systems?

Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.

04

Can Apollo NZ Global supply dorvarn access & perimeter systems internationally?

Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.

DORVARN

ACCESS & PERIMETER SYSTEMSCONTROL TODAY. PROTECT TOMORROW.

New Zealand + international project supply

One controlled pathway from site approach to authorised entry.

DORVARN groups physical access hardware, automation, sensing and control around the way people and vehicles actually move through a site. Products are selected around the project brief rather than treated as isolated catalogue items.

Supporting systems

Build the access point as a complete operating system.

Solar & off-grid access

Solar-capable automation pathways for selected gates, barriers and remote access points where grid power is impractical or unavailable.

Explore pathway

Readers & credentials

RFID, QR, NFC, keypad and compatible biometric reader pathways coordinated with the controller and user model.

Explore pathway

Multi-door access

Scalable controller architecture for larger sites with multiple controlled entries, schedules and visitor permissions.

Explore pathway

DORVARN is available for New Zealand and international project supply. Impact ratings, hostile-vehicle mitigation classifications, duty-cycle claims, wireless ranges and connected-service features are only published when verified for the exact selected configuration and destination.

Complete access architecture

One site, several control layers.

The illustration shows how DORVARN hardware can be coordinated across the same entrance. It is a system-planning visual, not a claim that every project requires every component.
DORVARN access architecture showing vehicle detection, automatic barriers, sliding gates, pedestrian access, readers, connected control and solar off-grid power
01Approach sensing

Vehicle presence and direction inputs begin before the controlled line.

02Credential decision

RFID, QR, keypad, reception release or other authorised access logic determines entry.

03Physical control

Barrier, bollard, chain barrier or automated gate manages the vehicle path.

04Pedestrian control

Turnstiles or controlled pedestrian entrances are coordinated separately from vehicle movement.

05Connected management

Remote administration, event visibility and diagnostics can sit above the local control layer where required.

06Local safety + commissioning

Photocells, safety edges, emergency release, force settings and final behaviour are validated at the installed site.

Hardware selection, lane geometry, sensors, cables, foundations, drainage and safety devices are determined for the actual site.

Planning your project

Plan your DORVARN Access & Perimeter Systems project.

These are the useful details to share when enquiring. We'll help confirm the appropriate options, information and supply quotation.

01

Application & use

Intended users / buyers: commercial-development. Confirm the actual application, operating intensity and project outcome.

Please note: A product-category match is not a final suitability confirmation.

02

Site & environment

Confirm the actual site, exposure, climate, drainage and destination conditions.

Please note: Environmental performance depends on the selected system and its confirmed technical specifications.

03

Configuration & dimensions

Confirm configuration: project-reviewed, together with dimensions, quantities, interfaces and required options.

Please note: Available sizes, spans, loads and options are confirmed for the selected system.

04

Materials, finishes & maintenance

Confirm material, finish, corrosion, cleaning, maintenance and replacement requirements.

Please note: Material suitability can change with exposure, assemblies and maintenance conditions.

05

Product guides & specifications

Tell us which product information you need, such as a datasheet, specification, guide or test report for your chosen model.

Please note: Technical documents, calculations, certificates and tests are only provided where available for the selected system and confirmed in the quotation.

06

Drawings & installation requirements

If your project needs dimensions, fixing details, shop drawings or installation information, include these requirements in your enquiry.

Please note: Final dimensions, fixing details, structural requirements and installation drawings are confirmed for each project.

07

Country & delivery location

Tell us where the products will be used and delivered so we can check availability, freight, climate considerations and applicable product information.

Please note: Local building requirements, engineering and approvals must be confirmed with the appropriate professionals in the destination country.

08

Commercial project requirements

For tenders or larger projects, share the model, dimensions, finishes, required documents, expected delivery date and the scope you would like Apollo to supply.

Please note: Specifications and any required test information must match the final model and written quotation.

09

Project interface & delivery

Confirm destination, receiving point, unloading, local contractor, foundations / supports, services, installation responsibility and target programme.

Please note: Freight, local works, engineering, commissioning and installation scope must be confirmed in the written quotation.

Apollo is supply-only unless the written project scope states otherwise. Local engineering, statutory approvals, site works and installation remain project-specific.

Project pathways

Start with how the site needs to move, separate and authorise people and vehicles.

The system family is deliberately organised by function so the project can combine hardware, sensing and controls without treating each item as a separate procurement decision.

Project priorities

Specify the access logic before selecting the hardware.

01

Movement pattern

Map vehicles, pedestrians, deliveries, visitors, staff and emergency movement before choosing the physical control system.

02

Duty + environment

Match operating frequency, gate or boom geometry, exposure, corrosion risk, temperature and maintenance access to the selected configuration.

03

Control + safety

Coordinate credentials, detection, safety devices, backup power, remote management and local compliance as one access architecture.

How Apollo fits

Apollo coordinates the system around the project brief.

DORVARN is supply-only. Civil works, foundations, wiring, local electrical work, installation, safety validation, commissioning and regulatory approvals remain project-specific unless expressly included in the quoted scope.

01

Define the controlled edge

Confirm entrances, exits, lanes, pedestrian interfaces, opening geometry, security intent and operating hours.

02

Build the hardware pathway

Select the appropriate barrier, bollard, chain, gate operator, detector, reader and control architecture.

03

Verify the exact configuration

Confirm electrical supply, accessories, communications, safety devices, documentation, destination requirements and project responsibilities before order.

Relevant Apollo systems

Products can be selected individually or combined around the project.

DORVARN Vehicle Access Systems DORVARN Vehicle Detection DORVARN Access Control DORVARN Pedestrian Access DORVARN Connected Systems DORVARN Solar & Off-Grid Access DORVARN Acoustic & Noise Control TREVIK Architectural Opening Systems
Product snapshot

DORVARN Access & Perimeter Systems

Access, perimeter and acoustic/noise-control project supply for commercial, sports, industrial and public environments. Exact product type, configuration, tested performance, structure, fixing and destination suitability are confirmed before quotation.

Apollo NZ GlobalAccess & Perimeter SystemsExplore product options
Applications

Commercial Development · Developers · Commercial · Hospitality

Configuration

Project Reviewed

Environment

Outdoor Project Review · Coastal Review · High Ambient Review · Power / Networking Review

Related4 related product optionsHow we supplyProduct supply only · quotation tailored to your project
Project markets

New Zealand · Australia · Pacific Islands · singapore · India

Final configuration, engineering, certification and destination requirements are reviewed for each project.

Connected project pathway

Everything you need to take the next project step.

DORVARN · Access & Perimeter Systems
Planning & specification

DORVARN Access & Perimeter Systems: what to define before quotation.

Access, perimeter and acoustic/noise-control project supply for commercial, sports, industrial and public environments.

Applications
  • residential projects
  • commercial projects
  • hospitality projects
  • international projects
Specification evidence
  • Verified product specifications or documented product facts
  • Clear applications, limitations and configuration boundaries
  • Project inputs required for manual quotation or technical review
  • Apollo supply-only scope and purchaser/local-project responsibilities
Compare before selecting
  • Dimensions, capacity or coverage required for the real site.
  • Materials, finishes and environmental exposure.
  • Installation, interfaces, services and maintenance access.
  • Technical documents, local approvals and project responsibilities.
Related pathwayProject Upload Tool
Regional project pathwayDORVARN Access & Perimeter Systems for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Product informationNeed a datasheet, drawing or technical guide?

Tell us the product or model, project location and what information you need. We'll confirm what can be provided for your chosen system and quotation.

Request product information

Relevant project sectors

See this system in the buying context that matches the project.

Browse all sectors

Institutional & project buyers

Follow the pathway that matches the organisation buying the product.

New Zealand + international · Practical project supply

Send the brief before you have every detail resolved.

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Project