Skip to main content
Apollo NZ GlobalStart Project Brief

DORVARN · Gate Automation

Sliding, swing and industrial gate automation selected around geometry, duty and safety.

DORVARN Gate Automation covers project-led automation for sliding gates, swing gates and heavier commercial or industrial entrances, coordinated with access credentials, vehicle detection and local safety interfaces.

Sliding gate automationSwing gate automationCommercial + industrial pathwaysExact duty and gate-mass limits verified per operator

Project pathways

Choose the automation family around how the gate moves.

Project priorities

Start with the gate, not the motor.

01

Gate geometry

Confirm opening width, leaf type, travel, hinges or track, slope, wind exposure, gate mass and physical stops before selecting an operator.

02

Operating duty

Match residential, commercial or industrial opening frequency to the appropriate automation and backup-power pathway.

03

Safety + control

Coordinate photocells, safety edges, detection, emergency release and authorised opening as one control sequence.

How Apollo fits

Select the operator after the access sequence is understood.

Maximum gate mass, travel length, cycles, wind exposure and safety configuration are exact-model parameters and are confirmed from current technical documentation before supply.

01

Survey opening conditions

Document gate geometry, site constraints, power location, approach traffic and surrounding pedestrian movement.

02

Select automation pathway

Match operator type and accessories to the exact gate and expected operating demand.

03

Commission locally

Final force settings, safety behaviour, travel limits and connected controls must be commissioned on the installed gate.

Relevant Apollo systems

Products can be selected individually or combined around the project.

DORVARN Vehicle Detection DORVARN Access Control DORVARN Vehicle Access Systems

Institutional & project buyers

Follow the pathway that matches the organisation buying the product.

New Zealand + international · Practical project supply

Send the brief before you have every detail resolved.

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Project