Skip to main content
Apollo NZ GlobalStart Project Brief

DORVARN · Sliding Gate Automation

Sliding-gate automation built around the actual gate, track and operating duty.

DORVARN Sliding Gate Automation provides residential, commercial and heavier project pathways coordinated with racks, magnetic limit-switch logic, access credentials, photocells, vehicle detection and local safety commissioning.

Residential → commercial → industrial pathwaysMagnetic limit-switch reference platformVehicle detection integrationExact gate-mass limits verified per operator
DORVARN sliding gate automation at a premium architectural entrance

Project priorities

The gate condition determines whether automation will work well.

01

Gate alignment

The gate must run freely, remain level and use appropriate mechanical stops before an operator is selected.

02

Rack + limit logic

Coordinate rack position, pinion engagement and opening/closing limit-switch placement to the final gate geometry.

03

Safety devices

Photocells, safety edges, vehicle detection and emergency/manual release are selected around the actual hazard zones.

How Apollo fits

Automate a sound gate rather than using the motor to compensate for a poor one.

Gate mass, maximum travel, power, duty cycle and environmental limits are operator-specific. Final figures are published only after the exact automation reference is locked.

01

Confirm gate mechanics

Check travel, mass, track, stops, stiffness, wind exposure and manual movement.

02

Select operator family

Choose the operator according to exact gate mass, use frequency and destination conditions.

03

Install + commission

Set limits, control logic and safety devices on the completed gate and test the whole movement sequence.

Relevant Apollo systems

Products can be selected individually or combined around the project.

DORVARN Vehicle Detection DORVARN Access Control

Institutional & project buyers

Follow the pathway that matches the organisation buying the product.

New Zealand + international · Practical project supply

Send the brief before you have every detail resolved.

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Project