Skip to main content
Apollo NZ GlobalStart Project Brief

DORVARN · Swing Gate Automation

Swing-gate automation for single and paired leaves, selected around hinge geometry and wind exposure.

DORVARN Swing Gate Automation covers articulated and linear-style project pathways for residential, hospitality, commercial and controlled development entrances, with access control and safety interfaces coordinated from the outset.

Single + paired leaf pathwaysLinear + articulated automation familiesAccess-control integrationExact leaf limits verified per operator
DORVARN swing gate automation with linear actuators at a premium entrance

Project priorities

Swing gates are highly sensitive to geometry and wind.

01

Hinge geometry

Post depth, hinge position, opening angle and actuator mounting points determine the usable operator pathway.

02

Leaf area + wind

A large infilled gate can create substantially more wind load than an open-frame gate of similar weight.

03

Safe movement

Closing forces, entrapment zones, photocells, safety edges and manual release must be resolved on the installed gate.

How Apollo fits

Select the operator from the gate geometry outward.

Maximum leaf length, leaf mass, hinge geometry and wind suitability vary by operator. Final values remain exact-model confirmation items.

01

Measure the gate

Confirm leaf width, mass, hinge offset, required angle and available mounting structure.

02

Choose automation type

Select linear or articulated architecture around the geometry and expected operating duty.

03

Commission safety

Set force, limits, controls and safety devices on the final installation before handover.

Relevant Apollo systems

Products can be selected individually or combined around the project.

DORVARN Vehicle Detection DORVARN Access Control

Institutional & project buyers

Follow the pathway that matches the organisation buying the product.

New Zealand + international · Practical project supply

Send the brief before you have every detail resolved.

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Project