Skip to main content
Apollo NZ GlobalStart a brief
Industrial doors & loading bays

SYSTEM 05 / Controlled dock movement

Loading Bay Safety Systems

Complement door and dock hardware with site-appropriate safety architecture: vehicle restraints, truck guides, red/green traffic lights, wheel chocks, controls, sensors, barriers and communications.

Applications

Where this system fits.

Busy distribution and dispatch docksFacilities with multiple vehicle typesHigh pedestrian/forklift conflict areasSites seeking coordinated operating sequences

01 / Selection inputs

What needs to be understood first.

  • Vehicle restraint method and compatibility
  • Traffic light and interlock operating logic
  • People/forklift exclusion zones and signage
  • Manual overrides, emergency release and fail-safe behaviour

02 / Indicative supply scope

What the package may include.

  • Restraint and signalling options for specification review
  • Detection and control interfaces
  • Safety accessories and physical guides as required
  • Controls/operating sequence proposal

03 / Documentation to request

Evidence before commitment.

  • Applicable safety and test evidence by model
  • Functional sequence and wiring diagram
  • Operation, emergency and inspection procedures
  • Site commissioning checklist

04 / Local project interfaces

Responsibilities to coordinate.

  • Dock door and leveller interlocking
  • Existing building management and fire controls
  • Local hazard assessment, installation and operator training

Project supply, not a certified standard kit. Selection must follow site-specific risk assessment, not a generic safety package claim. Manufacturer capabilities, maximum sizes, duty ratings, test certificates, drawings and warranties must be verified for the selected equipment before any binding performance claim or order.

Related Apollo pathways

Connect the complete loading-bay scope.

Have dimensions, a layout or a dock schedule?

Start simply or prepare a detailed technical brief if the project has reached specification stage.

Start an enquiry Detailed technical brief
Project