Design the shared hall around the conflicts between sports—not just the floor markings.
Most indoor sports can share a hall, but they do not share every equipment, clear-volume, service, storage or changeover requirement. This matrix keeps those interfaces visible before the building and floor are frozen.
Structure is supplied only. The purchaser arranges all local engineering, foundations, installation and building-services interfaces independently.
One hall, separate evidence paths.
The shared-hall package coordinates interfaces. It does not merge governing-body requirements or transfer an approval from one sport, product or competition level to another.
Primary sport still matters.
Flooring, lighting, hall geometry and equipment should be optimised around the agreed primary and secondary sport hierarchy rather than treating every marking on the floor as equally demanding.
TECHNICAL DIAGRAM PACK
Show the hall as an operating system—not a collection of products.
These diagrams make the hidden coordination work visible: equipment movement, court changeover, divider and overhead conflicts, storage logistics, and the digital control layer.
01
AXONOMETRIC SYSTEM OVERVIEW
One hall, multiple sport modes, one coordinated infrastructure layer.
LUTHVARsport equipment · storage · operations
ATHRENplaying floor · build-up · sockets
FÍSVORscoring · timing · displays · data
HLJÓÐdivider · audio · venue-control layer
SARENTAclear-span structure where new build is required
02
SPORT CHANGEOVER SEQUENCE
Make the changeover path explicit before selecting equipment.
01
Clear active sport
Remove balls, loose equipment and officials furniture from the playing envelope.
02
Retract / move fixed sport equipment
Move backstops, posts, goals or rink boards to their nominated park / storage zones.
03
Set dividers + protection
Deploy the court split, wall protection or containment required for the next operating mode.
04
Load the next sport
Bring the selected posts, goals, nets, benches and officials equipment into the hall.
05
Switch digital + lighting mode
Apply the correct FÍSVOR scoring / display mode and venue-lighting scene before handover.
Use the programme first, then geometry, system selection, evidence and local responsibilities.
01
Set sport mix
Identify primary and secondary sports, level of play and concurrent use.
02
Freeze court/hall geometry
Resolve playing area, run-offs, clear height, dividers, storage and spectator zones.
03
Choose floor + equipment
Coordinate floor system with sockets, hoops, posts, retractable gear and wall interfaces.
04
Integrate building systems
Lighting, acoustics, scoring, seating, changing and services follow the sports programme.
EVIDENCE & STANDARDS
Keep claims attached to the exact product and installed outcome.
Indoor hall dimensions, run-offs, clear heights, lighting conditions, floor performance and equipment requirements differ by sport and competition level. LUTHVAR therefore coordinates the shared hall first, then confirms each sport's exact governing-body and product evidence separately.
Hall geometry checked against intended sport/competition requirements.
Clear height and run-offs resolved before structure is frozen.
Floor system matched to sockets/equipment/substrate and sport performance.
Competition equipment is quoted only after the required sport/level and exact supplied product evidence are matched.
Lighting, acoustics, storage and building services coordinated together.
Local fire, accessibility, structural and building-consent responsibilities assigned.
CONNECTED SYSTEMS
Use the existing specialist platforms where they fit.
The programme coordinates the specialist systems that make up the complete facility.
Essential site functions work without analytics. With your permission, Apollo measures which products and project pages are useful. Analytics stays off unless you allow it.