
COMPLETE INDOOR SPORTS HALLS
LUTHVAR COMPLETE · INDOOR HALL SELECTOR
Route the project into the right hall architecture before product selection.
Choose the primary sport, operating level, spectator scale and shared-hall model to identify the best starting pathway and the first coordination risks to resolve.
LUTHVAR COMPLETE · INDOOR HALL SELECTOR
Choose the hall operating model before choosing the products.
The selector identifies a sensible Apollo planning pathway. It does not determine governing-body compliance, certification, engineering or final project scope.
Club & Training Basketball Hall
Use the sport-specific hall as the primary design path, then coordinate secondary sports against the master multi-sport compatibility matrix.
- Primary
- Basketball
- Level
- Club / academy
- Sharing
- Primary sport + selected secondary sports
- Spectators
- 500
Basketball
These are the first interfaces to resolve before committing to floor build-up, structure, services or fixed equipment.
- 01
- Backstop movement + floor loading
- 02
- Shot clocks / scoring / FÍSVOR
- 03
- Wall protection + seating
- 04
- Backstop and shared-equipment storage
