Skip to main content
Apollo NZ Global
My Project
Request Project Pricing
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

LUTHVAR · COMPLETE BASKETBALL HALL SYSTEMS

One coordinated basketball hall — from playing floor and backstops to scoring, seating, lighting, storage and FÍSVOR venue technology.

LUTHVAR Complete Basketball Hall Systems is the building-level pathway for schools, clubs, competition venues and arenas. Court, equipment, ATHREN flooring, protection, dividers, shot clocks, scoring, FÍSVOR displays, lighting, spectator systems and storage are planned around one operating brief instead of being specified in isolation.

4 hall package pathwaysComplete system matrixATHREN · FÍSVOR · HLJÓÐ integrationSupply-only project coordination
Empty professional indoor basketball arena with full court, backstops, spectator seating and sports lighting

Product details

Treat the hall as one operating system.

Backstop movement, floor loading, shot clocks, scorer positions, wall protection, lighting, spectator seating, digital systems and storage all interact with the building. They should be coordinated before structure and services are fixed.

01Court
28 × 15 m referenceFull 5-on-5 geometry is planned with the minimum boundary and intended competition level.
02Backstops
Mobile · floor-fixed · wall/ceilingSystem choice follows competition, storage, structure and changeover requirements.
03Floor
Wood · synthetic multi-sportPerformance, floor loading, maintenance and secondary sports are coordinated together.
04Protection
Wall + support paddingBuilding interfaces and impact zones are reviewed around the field of play.
05Scoring
Shot clocks · scoreboard · game clockPower, data and mounting are integrated into the hall.
06Lighting
Training · competition · mediaOne design should support the venue's operating modes without glare.
07Seating
Portable · retractable · fixedCapacity and sightlines follow the facility brief.
08Storage
Backstops + shared sports equipmentMobile systems and multi-sport changeover need real storage volume.

Apollo is supply-only. Building design, structure, backstop engineering, fire and egress, HVAC, electrical/data, floor installation, accessibility and destination approvals remain project-specific unless expressly included.

Complete hall package matrix

Specify the whole basketball hall — not a collection of disconnected products.

Start with the way the building will operate, then coordinate the court, basketball equipment, digital game systems, spectators, lighting and storage around the same brief. The matrix is a planning framework; exact inclusions remain project-specific.

01 · Community + School

Community & School Hall

A durable shared-hall package for teaching, training, school competition and community use, with simple changeover and practical storage.

Build this pathway
02 · Club + Academy

Club & Training Hall

A repeat-use basketball environment with stronger backstops, scoring, team areas, spectator provision and a floor selected around frequent training.

Build this pathway
03 · Competition

Competition Hall

A formal event pathway coordinating the field of play, exact equipment evidence, shot clocks, scoring, seating, lighting and operational zones.

Build this pathway
04 · Arena + Broadcast

Arena & Broadcast Hall

The full venue layer: premium playing environment, integrated FÍSVOR display and scoring systems, higher-capacity seating and event-ready technical interfaces.

Build this pathway
Core package Recommended / optionProject-specific = confirm against venue, event and technical brief
System layerCommunity
+ School
Club
+ Academy
Competition
Hall
Arena
+ Broadcast
01 · PLAYPlaying court + line planATHRENCoreCoreCoreCore
02 · PLAYIndoor sports flooringATHRENCoreCoreCoreCore
03 · PLAYSprung timber basketball floor pathwayATHRENOptionRecommendedRecommendedRecommended
04 · PLAYFloor protection for non-sport eventsATHRENOptionOptionRecommendedCore
05 · EQUIPMENTMain backstopsLUTHVARCoreCoreCoreCore
06 · EQUIPMENTBackboards, rings + netsLUTHVARCoreCoreCoreCore
07 · EQUIPMENTPractice / side-court basketsLUTHVAROptionRecommendedRecommendedRecommended
08 · SAFETYWall + column protectionLUTHVARCoreCoreCoreCore
09 · VENUEDivider curtains / multi-court separationHLJÓÐRecommendedRecommendedOptionProject-specific
10 · DIGITALGame clock + scoreboardFÍSVORRecommendedCoreCoreCore
11 · DIGITALShot clocksFÍSVOROptionRecommendedCoreCore
12 · DIGITALScorer control consoleFÍSVOROptionRecommendedCoreCore
13 · DIGITALMain video / LED displayFÍSVOR—OptionRecommendedCore
14 · DIGITALRepeater displaysFÍSVOR—OptionOptionRecommended
15 · DIGITALLED perimeter / event displayFÍSVOR——OptionRecommended
16 · SPECTATORSTeam benches + scorer tableHLJÓÐ / LUTHVARCoreCoreCoreCore
17 · SPECTATORSSpectator seatingHLJÓÐOptionRecommendedCoreCore
18 · LIGHTSports lightingLUTHVAR PROJECTCoreCoreCoreCore
19 · LIGHTMedia / broadcast lighting layerLUTHVAR PROJECT——OptionProject-specific
20 · OPERATIONSBasketball + equipment storageLUTHVARCoreCoreCoreCore
21 · OPERATIONSPA / venue audio interfaceHLJÓÐOptionOptionRecommendedCore
22 · OPERATIONSIntegrated control + data interfacesFÍSVOR—OptionRecommendedCore

ATHREN timber floor branch

Two documented sprung timber constructions - one controlled competition-evidence pathway.

The basketball hall can now route into ATHREN's single-batten and double-batten floor systems. Selection stays based on hall depth, slab, equipment interfaces and verified performance evidence rather than assuming one construction is superior.

ATHREN T-S1

Single-Keel / Single-Batten Timber

Approx. 105 mm adjustable suspended timber pathway for projects where available build-up height is a key constraint.

Open T-S1
ATHREN T-D2

Double-Keel / Double-Batten Timber

Approx. 158 mm adjustable suspended pathway with upper/lower timber support layers and intermediate resilient pads.

Open T-D2
CONTROLLED FIBA TEST EVIDENCE

2020 Level 2 Laboratory Reference

Manufacturer single-keel and double-keel samples both recorded PASS against the submitted Level 2 wooden-floor test requirements. The reports are not Certificates of Approval; current approval/listing is checked separately where required.

Review evidence
PROJECT TOOL

Timber Floor Selection Guide

Narrow the starting pathway using sport, competition requirement, available floor depth, event use and floor interfaces.

Open selector
MASTER SPORTS SYSTEMLUTHVAR

Owns the complete basketball-hall brief and ties every project layer together.

PLAYING SURFACEATHREN

Indoor playing floor, court build-up and event floor-protection pathway.

DIGITAL GAME + VISIONFÍSVOR

Scoring, timing, shot clocks, control, repeater displays and LED/video systems.

VENUE LAYERHLJÓÐ

Seating, hall division, team/official areas and connected venue systems.

Build the brief

Turn the matrix into one coordinated basketball-hall specification.

Define hall type, court count, competition level, seating, flooring, backstops, scoring, displays, dividers, lighting and storage before individual products are selected.

Build My Basketball Hall Package

“Core”, “recommended” and “option” describe Apollo package-planning roles, not automatic regulatory requirements. Formal competition and approval claims are confirmed only against the exact supplied product, current supporting evidence and the project's governing rules.

Applications + project fit

Basketball-first without making the building single-purpose.

Complete coordination

Resolve backstops, floor, padding, lighting, scoring, seating and storage as one plan.

Multi-sport by design

Netball, volleyball, futsal, handball and badminton can remain part of the hall programme.

Flexible seating

Retractable seating can recover floor area between events.

Backstop storage

Mobile units need structural floor loading, movement routes and dedicated storage.

New-build pathway

Where no suitable hall exists, the project can connect into Apollo's SARENTA clear-span sports structures.

Competition upgrade

A FIBA-approved equipment pathway, competition floor and arena technology can be layered onto the core hall where exact current evidence supports the selected systems.

Applications
SchoolsBasketball clubsUniversitiesCommunity sports hallsIndoor arenasCommercial sports venuesNew-build sports facilitiesInternational projects

Plan · compare · specify

Continue through the strongest Apollo project pathways.

Use the category page, technical resources and project tools around this product rather than treating the page as an isolated endpoint.

Digital game + vision

FÍSVOR Sport

Coordinate scoreboards, timing, shot clocks, venue displays and the wider digital game layer.

Connected project pathway

Everything you need to take the next project step.

LUTHVAR · Basketball Systems
Regional project pathwayLUTHVAR Basketball Systems for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Product informationNeed a datasheet, drawing or technical guide?

Tell us the product or model, project location and what information you need. We'll confirm what can be provided for your chosen system and quotation.

Request product information

BUILT INTELLIGENCE

Research connected to this project pathway.

Open Sports & Recreation

Ready to review the project?

Send the dimensions, quantity, destination and the information you already have.

Project