Public coordination diagram available now. It shows design intent, not final construction geometry.

BIM · CAD · TECHNICAL DRAWING LIBRARY
LUTHVAR COMPLETE · CONTROLLED DRAWING ACCESS
Use planning drawings now. Release exact CAD and BIM only when the system is real.
This library separates public planning references from exact-system and project-specific drawings across Basketball, Netball, Volleyball, Badminton, Futsal, Handball and Floorball. Native CAD / BIM availability is confirmed against the exact selected equipment; it is never assumed from a product-family page.
DRAWING STATUS
Know exactly what each status means.
Every drawing resource should carry one of these states so architects and contractors can tell a planning reference from an exact technical deliverable.
Exact geometry or technical drawing may be released once the supplied system is selected and verified documentation is available.
Drawing depends on the actual hall, equipment layout, structure, floor or services coordination.
A controlled exact-system drawing is available for the selected supplied configuration.
No verified public CAD / BIM file is currently published for this item.
AVAILABLE NOW · PLANNING REFERENCES
Five indoor-hall diagrams already available for coordination.
These are public technical-intent diagrams. They are useful for design coordination and briefing but do not replace exact equipment, structural or construction drawings.
Axonometric System Overview
Multi-sport hall overview showing equipment, dividers, ATHREN floor, FÍSVOR and storage / parking relationships.
Open Planning DiagramSport Changeover Sequence
Operational sequence for clearing one sport, moving equipment, setting dividers and deploying the next mode.
Open Planning DiagramStorage + Movement
Storage / parking concept showing the protected movement route between the active hall and equipment storage.
Open Planning DiagramDivider + Overhead Conflicts
Elevation concept showing divider travel, structure, lighting / services and suspended-equipment conflict zones.
Open Planning DiagramFÍSVOR Digital System Topology
Venue-control concept linking scorer console, clocks, scoreboards, repeaters, video / LED and HLJÓÐ interfaces.
Open Planning DiagramSPORT DRAWING LIBRARY
Seven sports. Three drawing layers for each.
Planning, interface and exact-system information become progressively more specific as the project moves through equipment selection and technical submittal.
Backstop location, operating / parked envelopes and floor / wall / roof interface zones.
Mounting zones, sleeve / anchor locations, wall or roof support relationship and FÍSVOR positions.
Backstop GA, applicable reactions / loads, mounting detail and board / ring geometry where verified.
Court-bank post positions, free-zone relationship, portable / socketed pathway and storage route.
Sleeve / socket setting-out, portable-base envelope, net / post interface and referee position.
Selected post / base / sleeve geometry and setting-out information where verified.
Court-bank layout, post locations, umpire positions, roll-floor strategy and equipment storage.
Post / base relationship, floor protection, roll-floor extents and lighting / background coordination zones.
Selected equipment and event-floor setting-out information where verified.
Indoor post locations, bench / scorer zones, shared-court layout and post-storage route.
Sleeve / post support relationship, floor cap strategy, padding envelope and floor build-up coordination.
Selected post / sleeve / support information where verified.
Goal line, goal-end protection, team zones, goal movement / parking and storage.
Goal restraint / substrate relationship, protection zones and operating clearances.
Selected Futsal goal and restraint information where verified.
Goal line, goal-end protection, team zones, goal movement / parking and storage.
Goal restraint / substrate relationship, protection zones and operating clearances.
Selected Handball goal and restraint information where verified.
Rink perimeter, gates, goals, team / officials zones, trolley paths and storage access.
Panel / corner / gate relationships, loaded trolley routes, door clearances and storage-bay geometry.
Selected rink-board / goal geometry and handling information where verified.
SHARED HALL DRAWINGS
Coordinate the systems that cross sport boundaries.
These categories belong at hall level because one floor, divider, display network or storage route may serve several sports while retaining separate technical evidence.
ATHREN Floor + Socket Coordination
ATHRENProject-SpecificFloor build-up, line-marking hierarchy, socket / sleeve interfaces, caps, rolling routes and equipment loading zones are coordinated against the selected floor and equipment.
Divider Curtain + Overhead Coordination
HLJÓÐ / LUTHVARProject-SpecificDivider track, curtain travel, parked condition and conflict zones depend on the actual hall structure, lighting, HVAC, suspended equipment and service layout.
FÍSVOR Power / Data / Display Coordination
FÍSVORProject-SpecificScorer, scoreboard, shot-clock, repeater, video / LED and control-point locations are coordinated against the final hall and services design.
Storage + Changeover Drawings
LUTHVARProject-SpecificEquipment parking, trolley routes, storage bays, doors, turning zones and temporary staging depend on the selected equipment and building geometry.
Structural Equipment Interfaces
Project structural engineer + ApolloAvailable After Product SelectionExact equipment loads / reactions and fixing information can be supplied where verified; the project engineer remains responsible for the building structure and connection design.
Native DWG / DXF / BIM Objects
Exact systemNot Yet AvailableNo blanket native indoor-sports DWG / Revit library is published. File availability is confirmed against the exact selected system rather than promised at family level.
NATIVE CAD / BIM CONTROL
Do not download a generic file and assume it represents the quoted equipment.
At present, no blanket native indoor-sports DWG / Revit library is published. Where exact files exist, availability is confirmed against the selected supplied system and intended project use before release.
DWG / DXFReleased only where an exact controlled drawing exists for the selected system.
IFC / BIM / RevitOnly offered where a genuine verified object or model is available; native Revit is never implied by a PDF or DWG.
Setting-out drawingsUsually project-specific because floor, structure, court geometry and selected equipment determine the final coordinates.
Construction useProject team must confirm revision, scale, exact system and engineering responsibility before relying on a released technical drawing.
DRAWING REQUEST PACK
What to provide when exact CAD / BIM or a project-specific drawing is required.
The clearer the requested use and current project geometry, the easier it is to return the correct drawing rather than a generic file that creates a coordination error.
Project name, destination and current design stage
Sport mix and required use / competition level
Latest hall GA and relevant floor / structure / services drawings
Equipment family or exact selected system if already known
Required file type: PDF detail, DWG / DXF, IFC / BIM / Revit where genuinely available
Specific purpose: concept coordination, structural review, services coordination, tender, construction or as-built record
Drawing scale / units and project coordinate requirements where relevant
Required-by date and consultant contact responsible for coordination
PROJECT PATHWAY
Start with planning references. Move into exact drawings through the controlled submittal path.
The Technical Centres identify the equipment pathway, the Architect & Specifier Centre closes building interfaces, and the Submittal Centre controls drawing revisions and exact-system release.
