Skip to main content
Apollo NZ GlobalStart Hall Brief
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

BIM · CAD · TECHNICAL DRAWING LIBRARY

LUTHVAR COMPLETE · CONTROLLED DRAWING ACCESS

Use planning drawings now. Release exact CAD and BIM only when the system is real.

This library separates public planning references from exact-system and project-specific drawings across Basketball, Netball, Volleyball, Badminton, Futsal, Handball and Floorball. Native CAD / BIM availability is confirmed against the exact selected equipment; it is never assumed from a product-family page.

04drawing classes · controlled availability
Planning diagrams are not construction drawingsExact drawings follow exact productsNative CAD / BIM is availability-controlledProject engineering remains separate

DRAWING STATUS

Know exactly what each status means.

Every drawing resource should carry one of these states so architects and contractors can tell a planning reference from an exact technical deliverable.

01Planning Reference

Public coordination diagram available now. It shows design intent, not final construction geometry.

02Available After Product Selection

Exact geometry or technical drawing may be released once the supplied system is selected and verified documentation is available.

03Project-Specific

Drawing depends on the actual hall, equipment layout, structure, floor or services coordination.

04Exact Drawing Available

A controlled exact-system drawing is available for the selected supplied configuration.

05Not Yet Available

No verified public CAD / BIM file is currently published for this item.

AVAILABLE NOW · PLANNING REFERENCES

Five indoor-hall diagrams already available for coordination.

These are public technical-intent diagrams. They are useful for design coordination and briefing but do not replace exact equipment, structural or construction drawings.

01Planning Reference

Axonometric System Overview

Multi-sport hall overview showing equipment, dividers, ATHREN floor, FÍSVOR and storage / parking relationships.

Open Planning Diagram
02Planning Reference

Sport Changeover Sequence

Operational sequence for clearing one sport, moving equipment, setting dividers and deploying the next mode.

Open Planning Diagram
03Planning Reference

Storage + Movement

Storage / parking concept showing the protected movement route between the active hall and equipment storage.

Open Planning Diagram
04Planning Reference

Divider + Overhead Conflicts

Elevation concept showing divider travel, structure, lighting / services and suspended-equipment conflict zones.

Open Planning Diagram
05Planning Reference

FÍSVOR Digital System Topology

Venue-control concept linking scorer console, clocks, scoreboards, repeaters, video / LED and HLJÓÐ interfaces.

Open Planning Diagram

SPORT DRAWING LIBRARY

Seven sports. Three drawing layers for each.

Planning, interface and exact-system information become progressively more specific as the project moves through equipment selection and technical submittal.

BasketballAvailable After Product Selection
PLANNING DRAWING

Backstop location, operating / parked envelopes and floor / wall / roof interface zones.

INTERFACE DRAWING

Mounting zones, sleeve / anchor locations, wall or roof support relationship and FÍSVOR positions.

EXACT-SYSTEM DRAWING

Backstop GA, applicable reactions / loads, mounting detail and board / ring geometry where verified.

Open Technical Centre
VolleyballAvailable After Product Selection
PLANNING DRAWING

Court-bank post positions, free-zone relationship, portable / socketed pathway and storage route.

INTERFACE DRAWING

Sleeve / socket setting-out, portable-base envelope, net / post interface and referee position.

EXACT-SYSTEM DRAWING

Selected post / base / sleeve geometry and setting-out information where verified.

Open Technical Centre
BadmintonProject-Specific
PLANNING DRAWING

Court-bank layout, post locations, umpire positions, roll-floor strategy and equipment storage.

INTERFACE DRAWING

Post / base relationship, floor protection, roll-floor extents and lighting / background coordination zones.

EXACT-SYSTEM DRAWING

Selected equipment and event-floor setting-out information where verified.

Open Technical Centre
NetballAvailable After Product Selection
PLANNING DRAWING

Indoor post locations, bench / scorer zones, shared-court layout and post-storage route.

INTERFACE DRAWING

Sleeve / post support relationship, floor cap strategy, padding envelope and floor build-up coordination.

EXACT-SYSTEM DRAWING

Selected post / sleeve / support information where verified.

Open Technical Centre
FutsalAvailable After Product Selection
PLANNING DRAWING

Goal line, goal-end protection, team zones, goal movement / parking and storage.

INTERFACE DRAWING

Goal restraint / substrate relationship, protection zones and operating clearances.

EXACT-SYSTEM DRAWING

Selected Futsal goal and restraint information where verified.

Open Technical Centre
HandballAvailable After Product Selection
PLANNING DRAWING

Goal line, goal-end protection, team zones, goal movement / parking and storage.

INTERFACE DRAWING

Goal restraint / substrate relationship, protection zones and operating clearances.

EXACT-SYSTEM DRAWING

Selected Handball goal and restraint information where verified.

Open Technical Centre
FloorballProject-Specific
PLANNING DRAWING

Rink perimeter, gates, goals, team / officials zones, trolley paths and storage access.

INTERFACE DRAWING

Panel / corner / gate relationships, loaded trolley routes, door clearances and storage-bay geometry.

EXACT-SYSTEM DRAWING

Selected rink-board / goal geometry and handling information where verified.

Open Technical Centre

SHARED HALL DRAWINGS

Coordinate the systems that cross sport boundaries.

These categories belong at hall level because one floor, divider, display network or storage route may serve several sports while retaining separate technical evidence.

01

ATHREN Floor + Socket Coordination

ATHRENProject-Specific

Floor build-up, line-marking hierarchy, socket / sleeve interfaces, caps, rolling routes and equipment loading zones are coordinated against the selected floor and equipment.

02

Divider Curtain + Overhead Coordination

HLJÓÐ / LUTHVARProject-Specific

Divider track, curtain travel, parked condition and conflict zones depend on the actual hall structure, lighting, HVAC, suspended equipment and service layout.

03

FÍSVOR Power / Data / Display Coordination

FÍSVORProject-Specific

Scorer, scoreboard, shot-clock, repeater, video / LED and control-point locations are coordinated against the final hall and services design.

04

Storage + Changeover Drawings

LUTHVARProject-Specific

Equipment parking, trolley routes, storage bays, doors, turning zones and temporary staging depend on the selected equipment and building geometry.

05

Structural Equipment Interfaces

Project structural engineer + ApolloAvailable After Product Selection

Exact equipment loads / reactions and fixing information can be supplied where verified; the project engineer remains responsible for the building structure and connection design.

06

Native DWG / DXF / BIM Objects

Exact systemNot Yet Available

No blanket native indoor-sports DWG / Revit library is published. File availability is confirmed against the exact selected system rather than promised at family level.

NATIVE CAD / BIM CONTROL

Do not download a generic file and assume it represents the quoted equipment.

At present, no blanket native indoor-sports DWG / Revit library is published. Where exact files exist, availability is confirmed against the selected supplied system and intended project use before release.

DWG / DXFReleased only where an exact controlled drawing exists for the selected system.

IFC / BIM / RevitOnly offered where a genuine verified object or model is available; native Revit is never implied by a PDF or DWG.

Setting-out drawingsUsually project-specific because floor, structure, court geometry and selected equipment determine the final coordinates.

Construction useProject team must confirm revision, scale, exact system and engineering responsibility before relying on a released technical drawing.

DRAWING REQUEST PACK

What to provide when exact CAD / BIM or a project-specific drawing is required.

The clearer the requested use and current project geometry, the easier it is to return the correct drawing rather than a generic file that creates a coordination error.

01

Project name, destination and current design stage

02

Sport mix and required use / competition level

03

Latest hall GA and relevant floor / structure / services drawings

04

Equipment family or exact selected system if already known

05

Required file type: PDF detail, DWG / DXF, IFC / BIM / Revit where genuinely available

06

Specific purpose: concept coordination, structural review, services coordination, tender, construction or as-built record

07

Drawing scale / units and project coordinate requirements where relevant

08

Required-by date and consultant contact responsible for coordination

PROJECT PATHWAY

Start with planning references. Move into exact drawings through the controlled submittal path.

The Technical Centres identify the equipment pathway, the Architect & Specifier Centre closes building interfaces, and the Submittal Centre controls drawing revisions and exact-system release.

Open Specification Writer Build Indoor Hall Brief
Project