Skip to main content
Apollo NZ GlobalStart Volleyball Brief
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

VOLLEYBALL EQUIPMENT · TECHNICAL CENTRE

LUTHVAR VOLLEYBALL · TECHNICAL CENTRE

Choose the post, net and storage pathway around the floor and operating model first.

One public technical workspace for socketed and portable posts, nets, antennae, tensioning, protection, referee systems, multi-court storage and FÍSVOR. Published specifications use LUTHVAR naming; exact equipment evidence is matched after the hall and event pathway is defined.

08equipment families · one evidence workflow
Public specifications use LUTHVAR namingApproval / homologation language is exact-system onlyFloor and socket interfaces close before releaseSupply-only scope remains explicit

EQUIPMENT FAMILIES

Eight controlled Volleyball pathways.

These families describe how the equipment works inside the hall while keeping posts, sleeves / bases, nets, protection and officials equipment tied to their real floor and event interfaces.

Socketed Competition Posts

Permanent floor-sleeve pathway for dedicated and higher-level courts where the floor build-up and structural interface can be coordinated before installation.

Exact post + sleeve evidence

Portable / Weighted Posts

Mobile pathway for schools, training centres and shared halls where permanent sockets are undesirable or frequent court relocation is required.

Stability + use-level review

Nets, Antennae + Tensioning

Matched net package covering net body, antennae, pockets, tensioning hardware and post interface rather than treating the net as a standalone item.

Exact system construction

Post Padding + Protection

Protective system matched to the post profile, court free-zone strategy and equipment operating method.

Exact fit + project material checks

Referee Stands + Officials Equipment

Referee platform, scorer and officials equipment coordinated with the free zone, post position, sightlines and storage.

Event suitability + protective details

Training + Adjustable Systems

Height-adjustable and teaching pathways for schools and academies where mixed ages, supervision and quick setup matter.

Use case + safe operation

Multi-Court Storage + Transport

Racks, trolleys and dedicated storage bays for posts, nets, padding and referee equipment across larger court banks.

Project handling plan

FÍSVOR Scoring + Venue Information

Scoring, match information, main displays and repeaters coordinated separately from the physical court-equipment approval pathway.

Protocol + product evidence separate

TECHNICAL SELECTION MATRIX

Match the post and net pathway to the floor, court bank and operating model first.

The matrix separates school, club, competition and arena pathways while keeping exact approval, homologation and product evidence tied to the system that will actually be supplied.

Core Recommended / option Exact model evidence requiredProject-specific = hall / event review first
Equipment familyInstallation pathwayMovement / storageKey interfacesEvidence gateSchoolClubCompetitionArena
01Socketed competition post systemsLUTHVARFloor-sleeve / socket pathway integrated with the sports-floor build-upPosts remove after play; sleeves remain as permanent floor interfacesSleeve depth, slab / subfloor, floor finish, net loads, cap detail, court geometryExact post, sleeve and competition evidence matched to the selected systemRecommendedCoreExact evidenceExact evidence
02Portable / weighted post systemsLUTHVARFloor-standing mobile pathway without permanent court socketsMove to dedicated storage / parking after useBase footprint, ballast, floor protection, free zone, handling route, stabilityExact stability, use-level and competition suitability confirmed by systemCoreRecommendedProject-specificProject-specific
03Net, antennae + tensioning packageLUTHVARMatched to selected post spacing, post geometry and use levelRemoved, rolled and stored after play where the hall changes sportNet height, tension path, cable / strap hardware, post load, antenna pocketsExact net and accessory construction matched to the required competition pathwayCoreCoreExact evidenceExact evidence
04Post padding + player protectionLUTHVARMatched protective system around each selected post configurationRemoves or travels with the post depending on equipment typePost profile, free-zone intrusion, attachment, finish, cleaning and storageExact padding fit and material evidence checked against project requirementsCoreCoreCoreCore
05Referee stands + officials equipmentLUTHVARCourtside platform / stand positioned outside the required playing envelopeMobile or demountable with dedicated storage positionFree zone, post / net position, scorer sightline, padding, floor protectionExact event suitability and protective details confirmed for the supplied standOptionRecommendedExact evidenceExact evidence
06Training + adjustable-height systemsLUTHVARSocketed or portable pathway selected around age group and timetableDesigned for repeat setup, height changes and shared-hall storageAdjustment range, supervision, net tension, floor sockets / bases and storageAge-group, local rules and safe operating method control selectionCoreOption——
07Multi-court storage + transport systemsLUTHVARDedicated racks / trolleys / storage bays sized to the court countPosts, nets, padding and referee equipment move along planned handling routesDoor widths, floor protection, storage depth, divider zones, court-changeover timeProject-specific handling plan rather than a competition approval claimRecommendedCoreRecommendedRecommended
08FÍSVOR scoring + venue informationFÍSVORCourtside, wall, suspended or arena-display pathwayFixed or event-configured depending on the hallPower, data, scorer table, sightlines, main display, repeater and control positionsCompetition protocol and exact product evidence checked separately from court equipmentOptionRecommendedExact evidenceExact evidence

EVIDENCE GATE

From court-bank planning to exact Volleyball equipment release.

The public pathway narrows the technical family. The exact system is released only after court geometry, floor interfaces, operating method and event evidence are matched to the real project.

01

Court bank + free zone

Freeze court count, spacing, free zones, divider lines and scorer / spectator positions.

02

Floor + post interface

Confirm ATHREN floor build-up, sockets / sleeves or portable-base pathway before product release.

03

Net + operating method

Confirm target net heights, tensioning, daily changeover, referee equipment and storage routine.

04

Exact equipment evidence

Match posts, sleeves / bases, nets, padding and referee systems to the exact project and event pathway.

05

FÍSVOR + handover

Close scoring, power/data, installation scope, documentation, testing and destination requirements.

INTERFACE LOGIC

The post system is a floor decision, a load decision and an operations decision.

Socketed and portable systems solve different problems. Net tension, free-zone control, divider paths, officials equipment and storage all need to be resolved around the selected pathway.

SOCKETED

Floor sleeve + slab

Coordinate sleeve depth, fixing / support, finished floor, removable caps, tolerance and long-term access before the floor is completed.

PORTABLE

Base stability + handling

Confirm base footprint, ballast, movement route, floor protection, free-zone intrusion and storage before selecting the system.

NET SYSTEM

Tension + post load

Treat net, antennae, tension hardware and post geometry as one assembly so the load path and operating method remain compatible.

MULTI-COURT

Storage + changeover

Size storage for the real number of posts, nets, pads and referee stands and protect the movement route through doors and shared-hall zones.

QUOTE-RELEASE CHECKLIST

What Apollo needs before exact Volleyball equipment is quoted.

Enough information is needed to avoid a post or socket solution that conflicts with the floor, divider layout, free zone or storage plan.

01

Project use level and intended competition / event pathway

02

Court count and whether courts operate concurrently

03

Hall plan with free zones, dividers, seating and scorer positions

04

ATHREN / existing floor build-up and slab information where available

05

Socketed, portable or recommendation-required post pathway

06

Required net-height range and any junior / training operation

07

Post, net, padding and referee-equipment storage location

08

FÍSVOR scoring, match information and main-display requirements

09

Destination, programme and installation responsibility

Competition approval is not a family-level claim.

A professional post, net or referee system is not automatically suitable for a named competition because another similar product is approved. Exact current evidence is checked against the system that will actually be supplied.

NEXT STEP

Move from the Technical Centre into the complete hall brief.

The technical matrix narrows the equipment family. The Volleyball Hall Brief adds court count, clear height, floor, dividers, spectators, FÍSVOR and storage so Apollo can move into exact controlled selection.

Open Complete Hall Build Hall Project Brief
Project