Full Rink-Board Systems
Rounded modular board pathway for club, competition and arena use, coordinated as a complete perimeter rather than loose panels.
Start Floorball Brief
FLOORBALL EQUIPMENT · TECHNICAL CENTRE
LUTHVAR FLOORBALL · TECHNICAL CENTRE
One public technical workspace for full and compact rink boards, gates, corners, goals, handling trolleys, storage, team / officials systems and FÍSVOR. Floorball is unusually dependent on how the complete perimeter is assembled, moved and stored, so logistics are treated as a core technical requirement.
EQUIPMENT FAMILIES
The centre treats the board perimeter, gates, corners, goals, trolleys and storage as an operating system, then adds the team, officials and digital layers around it.
Rounded modular board pathway for club, competition and arena use, coordinated as a complete perimeter rather than loose panels.
Reduced-format board pathway for schools and training environments where a full competition rink is unnecessary or the hall is constrained.
Entry gates, team access, rounded corners and panel junctions matched to the selected rink rather than treated as generic accessories.
Sport-specific goals selected independently from the rink-board approval pathway and matched to the intended level of play.
Transport and stacking systems sized around the real board set, door widths, turning space and floor-protection requirements.
Bench, substitution, scorer and officials infrastructure coordinated with board gates, circulation and spectator edges.
Dedicated storage sized for the complete panel count, trolleys, goals, sticks and shared-hall equipment—not leftover room.
Scoreboard, timing, scorer control, repeaters and event displays coordinated separately from physical rink and goal approvals.
TECHNICAL SELECTION MATRIX
The Floorball equipment pathway is driven by panel count, gates, corners, goals, handling trolleys and storage logistics as much as by the playing dimensions.
| Equipment family | Installation pathway | Movement / storage | Key interfaces | Evidence gate | School | Club | Competition | Arena |
|---|---|---|---|---|---|---|---|---|
| 01Full rink-board systemsLUTHVAR | Modular rounded perimeter pathway for full-rink club, competition and arena use | Panel-by-panel setup / pack-down or semi-permanent venue operation | Panel support, corner geometry, gates, floor contact, team-zone openings, hall clearances | Exact rink-board approval and construction evidence matched to the supplied system | Option | Core | Exact evidence | Exact evidence |
| 02Compact / teaching rink-board systemsLUTHVAR | Reduced-format modular perimeter for schools, academies and limited-space halls | Frequent setup / pack-down with compact storage pathway | Hall dimensions, teaching format, panel count, access gates, dividers and storage route | Use-level and exact construction confirmed without implying full-rink competition approval | Core | Option | — | — |
| 03Gates, corners + panel interfacesLUTHVAR | Matched components within the selected rink-board system | Travels and stores with the parent board set | Player entry, team access, corner radius, panel junctions, latch / hinge details, floor clearance | Exact compatibility and competition evidence tied to the parent rink system | Core | Core | Exact evidence | Exact evidence |
| 04Floorball goal systemsLUTHVAR | Floor-standing Floorball-specific goal pathway | Move to dedicated storage / parking after use where the hall changes sport | Goal position, net support, floor protection, player zone, storage and handling route | Exact goal approval / competition evidence verified independently of rink-board approval | Core | Core | Exact evidence | Exact evidence |
| 05Board trolleys + handling systemsLUTHVAR | Dedicated transport and stacking pathway sized around the real board set | Moves the board system between hall and storage while protecting panels and floor | Trolley dimensions, turning radius, door width, floor thresholds, storage rack geometry | Project handling plan and exact board-system compatibility | Recommended | Core | Core | Core |
| 06Team benches + officials / scorer systemsLUTHVAR / HLJÓÐ / FÍSVOR | Courtside support-zone pathway coordinated with board gates and substitution access | Portable, retractable or event-configured depending on venue operation | Team zones, gate positions, scorer table, officials, sightlines, circulation and spectators | Event layout and exact equipment scope confirmed against the intended competition level | Option | Recommended | Core | Core |
| 07Board + goal storage systemsLUTHVAR | Dedicated storage bay / rack pathway sized to panel count, trolleys, goals and shared equipment | Boards and goals move along protected routes without blocking hall circulation | Storage depth, rack geometry, door widths, trolley access, floor protection, changeover time | Project storage and handling plan rather than a competition approval claim | Core | Core | Core | Core |
| 08FÍSVOR scoring + match-control systemsFÍSVOR | Scorer-table, wall, suspended or arena-display pathway | Fixed or event-configured according to venue operation | Power, data, scorer position, scoreboard sightlines, repeaters, main display and control | Match protocol and exact product evidence checked separately from rink and goal approvals | Option | Recommended | Exact evidence | Exact evidence |
EVIDENCE GATE
The public pathway narrows the equipment family. Exact boards and goals are released only after the rink envelope, movement route, storage volume and evidence path are matched to the real venue.
Freeze full or compact rink, gates, team zones, officials and spectator edges.
Select the exact rink-board system and goals separately, including panel count, corner geometry and access points.
Confirm trolley type, handling route, doors, turning space, floor protection and storage volume.
Validate rink boards, gates / corners and goals independently against the intended competition pathway.
Close scorer positions, power/data, match control, installation scope, documentation and destination requirements.
MOVEMENT + STORAGE INTERFACES
Floorball storage should be designed from the panel count, trolley geometry and handling route outward rather than assigned whatever room remains after the building is designed.
Check corridors, thresholds, door leaves, corners and floor protection against the actual loaded trolley—not an empty schematic.
Size the storage around the complete rink, goals, trolleys and accessories with enough working clearance to load and unload safely.
Gate positions should work with benches, substitution zones, scorer positions and emergency / operational circulation.
Coordinate divider lines, floor markings, parking and storage so board setup does not damage the floor or conflict with other sports equipment.
QUOTE-RELEASE CHECKLIST
Enough information is needed to avoid choosing a rink that fits the playing area but cannot move through the building or fit into the available storage.
School, club, competition or arena operating level
Full, compact or mixed rink operating mode
Hall plan showing rink, team zones, officials, spectators and circulation
Required rink-board system, gate count and preferred access locations
Goal pathway and any competition evidence requirement
Existing / proposed floor and divider interfaces
Board trolley and handling-route requirements
Dedicated board / goal storage dimensions or available room
FÍSVOR, destination, programme and installation responsibility
A similar-looking board set, corner module, gate or goal is not automatically IFF-approved because another product in the same category is approved. Current evidence is checked against the exact system that will actually be supplied.
NEXT STEP
The matrix narrows the rink and equipment families. The Hall Brief adds operating mode, board handling, storage, floor, FÍSVOR, lighting and spectators so Apollo can move into exact controlled selection.