
COMPLETE FLOORBALL HALL SYSTEMS
LUTHVAR · FLOORBALL HALL PROJECT BRIEF
Build the hall around the rink and its changeover logistics.
Coordinate rink boards, gates, goals, ATHREN floor, FÍSVOR, seating, lighting, handling and storage before exact systems are selected.
LUTHVAR FLOORBALL · HALL PROJECT BRIEF
Define the rink logistics before the equipment order.
Floorball in a shared hall depends heavily on how the board system is assembled, moved and stored. Set the rink mode, board permanence, floor, scoring, spectators and storage before exact equipment is frozen.
BRIEF PREVIEW
What Apollo receives.
LUTHVAR COMPLETE FLOORBALL HALL PROJECT BRIEF Hall pathway: Club & League Hall Use / competition level: Club / league Client / organisation: Not supplied Destination: Not supplied Project stage: New hall / major redevelopment Rink / operating mode: Full-rink club / league pathway Hall dimensions / footprint: Not supplied Floor pathway: ATHREN recommendation required Board installation / changeover strategy: Removable modular rink with storage Seating strategy: Retractable / flexible seating Target spectator capacity: Not supplied Board / goal / equipment storage: Not supplied Target timing: Not supplied Requested hall systems: • Rink + hall layout — LUTHVAR • ATHREN resilient indoor floor — ATHREN • Rounded rink-board system — LUTHVAR • Gates, corners + panel interfaces — LUTHVAR • Floorball goal system — LUTHVAR • Team benches + substitution access — LUTHVAR / HLJÓÐ • Officials / scorer table — LUTHVAR / FÍSVOR • Divider curtains / hall zoning — HLJÓÐ / LUTHVAR • Scoreboard + game timing — FÍSVOR • Main LED / video + event displays — FÍSVOR • Sports / event lighting — LUTHVAR PROJECT • Spectator seating — HLJÓÐ / LUTHVAR • Board handling / trolley system — LUTHVAR • Board + goal storage — LUTHVAR • PA / venue audio + control — HLJÓÐ Additional notes: None supplied Apollo review required before quotation: exact competition / event pathway; rink geometry; current board and goal evidence; gates / team access; floor performance; scorer / FÍSVOR; spectators; lighting; board handling and storage; structure, fire/accessibility, electrical/data, installation and handover.
