Identify the playing surface
Record natural turf, synthetic turf or mixed field conditions. The documented product range includes perforated, ventilated and light-transmitting pathways, but the correct field-management approach is project-specific.
Start Event ProjectHLJÓÐ · Natural turf · temporary cover · event conversion
Planning framework for temporary event flooring over turf, including ventilation, drainage, light-transmission and traffic considerations.
Planning sequence
The current source catalogue documents ventilated, drainage and light-transmitting product pathways, but it does not provide a universal grass-survival timetable. The project brief therefore starts with the field and event conditions.
Record natural turf, synthetic turf or mixed field conditions. The documented product range includes perforated, ventilated and light-transmitting pathways, but the correct field-management approach is project-specific.
Map the exact footprint, installation sequence and expected time under cover. The current catalogue does not establish a universal safe maximum cover duration for natural turf.
Choose whether the brief is primarily pedestrian protection, air/water movement, light transmission, heavier production access or a combination of these requirements.
Separate audience, seating, carts, production equipment and any vehicles. A turf-friendly panel choice does not by itself establish the traffic capacity of the complete field build-up.
Document irrigation, drainage, weather exposure, access points and the field team's pre-event and post-event requirements. P2 and H5 show ventilation/drainage features; T1 shows a light-transmitting pathway.
Before quotation, match the selected panel to the exact product version, supporting technical documentation, edge/transition layout and venue requirements.
Turf-focused pathways
These distinctions come from the documented product geometry and features. They are not statements of guaranteed turf outcomes.
| Pathway | Documented characteristic | Use in the brief |
|---|---|---|
| P1 Pedestrian Turf | Lightweight roll-out modular cover | Short-duration pedestrian/event circulation starting pathway. |
| P2 Ventilated Turf | Air/water openings plus underside cable-routing feature | Where drainage/ventilation and general event use are priorities. |
| T1 Translucent Turf | Light-transmitting panel pathway plus water-return/drainage concept | Where maintaining light availability is specifically part of the field-management brief. |