HLJÓÐ · Event Flooring Technical Centre
Plan the surface before selecting the panel.
One technical workspace for turf protection, temporary event decks, vehicle-access review, cable and edge coordination, technical data and project briefing.
Technical workflow
Seven tools around the same project brief.
Use the selector for a starting pathway, then move through the relevant turf, loading and accessory checks before producing the project brief. Technical data sheets show what is documented today and what still needs model-specific evidence.
Event Surface Selector
Narrow the starting pathway by substrate, traffic, turf priorities, cable routing and vehicle access.
Open resource Technical libraryTechnical Data Sheets
Eight clean product-family data sheets separating catalogue-documented facts from project confirmation items.
Open resource Visual technical layerTechnical Diagram Library
Seven original planning diagrams for turf airflow, translucent cover, cable routing, transitions, vehicle loading, H4 cable-channel logic and duty selection.
Open resource Natural turfTurf Protection Planning Guide
Plan cover duration, light, air, water, traffic and field recovery before selecting a temporary surface.
Open resource Vehicle accessVehicle + Loading Brief
Structure the vehicle, wheel-load, tyre, turning, braking and ground-support information needed for heavy-access review.
Open resource Edges + servicesAccessories & Transitions
Coordinate ramps, perimeter edges, cable pathways, bottom plates and transitions as part of the event layout.
Open resource Project intakeEvent Flooring Project Brief
Create a structured project summary covering venue, substrate, duration, traffic, vehicles, cables and destination.
Open resourceProject sequence
From field condition to supply release.
The surface family is only one part of the decision. Installation sequence, substrate protection, loading, edge transitions, cable routes and event duration need to close together.
Separate pedestrians, furniture, trolleys, production equipment, forklifts and road vehicles.
Plan cable routes, perimeter edges, ramps, emergency access, turning areas, drainage and field operations.
Match the selected product configuration to load, fire, slip, UV and destination documentation before quotation.
Start with the application
Not sure which deck pathway fits?
The selector is deliberately conservative. It narrows the starting family without turning catalogue load claims into engineering conclusions.