HLJÓÐ · Event Surface Technical Diagrams

Seven diagrams for the decisions hidden beneath the event floor.

Original planning graphics for turf airflow and drainage, translucent field cover, production cable routing, edge transitions, vehicle loading, H4 cable-channel coordination and the complete P1→H5 duty progression.

07original technical diagrams
Original HLJÓÐ graphicsBased on documented product featuresPlanning reference · not construction drawingsNo unverified load figures

TECHNICAL DIAGRAM LIBRARY

Make the hidden event-surface decisions visible.

Seven original planning diagrams explain turf airflow and drainage, light-transmitting field cover, cable routing, perimeter transitions, vehicle-load thinking, large-format cable-channel logic and the P1→H5 duty progression. They show coordination principles only; final product geometry and engineering remain project-specific.

E-01
TURF AIR + WATER

Ventilated turf protection — airflow and drainage logic.

P2 is represented as an open event surface that allows air and water pathways through the panel while separating pedestrian/event traffic from the field.

HLJÓÐ · EVENT SURFACE SYSTEMSPLANNING REFERENCE / NOT FOR CONSTRUCTION
OPEN / VENTILATED PANEL FACENATURAL TURF / FIELDUNDERSIDE CABLE PATHWAYFIELD SUBSTRATEPlanning principle: maintain air/water pathways where the selected panel geometry allows. No universal turf-cover duration is implied.
E-02
LIGHT + WATER PATH

Translucent turf protection — keep light availability in the brief.

T1 is shown as a light-transmitting field-cover pathway with drainage/water-return logic. Quantified light transmission and safe turf-cover duration remain project-confirmed.

HLJÓÐ · EVENT SURFACE SYSTEMSPLANNING REFERENCE / NOT FOR CONSTRUCTION
LIGHT-TRANSMITTING PANEL PATHWAYFIELD / TURFWATER RETURN / DRAINAGE CONCEPTSource supports the existence of a light-transmitting version; quantified transmission is not stated in the current catalogue.
E-03
CABLE ROUTING

Route production services before the deck layout is frozen.

P2 provides an underside cable-routing feature and H4 includes a dedicated cable-channel configuration. The actual cable schedule determines capacity and crossing strategy.

HLJÓÐ · EVENT SURFACE SYSTEMSPLANNING REFERENCE / NOT FOR CONSTRUCTION
EVENT FLOOR FIELDPANEL GRIDCONCEPT SECTIONNOMINATED CABLE CORRIDORCABLE CHANNEL / VOIDConfirm cable count, diameter, connector size, bend radius, separation and access before selecting channel configuration.
E-04
EDGE + RAMP TRANSITION

The perimeter is a safety interface, not an afterthought.

Plan the deck-to-ground transition for pedestrians, accessible routes, trolleys, emergency access and selected vehicles. Exact ramp geometry depends on the chosen system.

HLJÓÐ · EVENT SURFACE SYSTEMSPLANNING REFERENCE / NOT FOR CONSTRUCTION
TAPERED / RAMPED TRANSITIONEVENT DECK FIELDEXISTING SURFACEEDGE LOCK / INTERFACERamp slope, accessibility, wheel loading and emergency access remain project-specific.
E-05
VEHICLE LOAD PLANNING

Translate the vehicle into wheel loads before talking about deck capacity.

A distributed panel rating is not an axle limit. Heavy-access review starts with the actual vehicle, tyre contact, route and supporting ground.

HLJÓÐ · EVENT SURFACE SYSTEMSPLANNING REFERENCE / NOT FOR CONSTRUCTION
WHEEL / AXLE INPUTWHEEL / AXLE INPUTVEHICLEmass + axlesTYREScontact + pressureMOVEMENTturn + brake + parkSUBSTRATEsupport conditionPanel + support layer + substrate form one temporary build-up. Final permitted vehicles require project-specific review.
E-06
H4 CABLE-CHANNEL LOGIC

Large-format deck with a dedicated services corridor.

H4 is documented as a 1000 × 500 × 50 mm PP pathway with a separate cable-channel configuration and bottom-plate option. This diagram shows coordination logic, not factory cross-section geometry.

HLJÓÐ · EVENT SURFACE SYSTEMSPLANNING REFERENCE / NOT FOR CONSTRUCTION
DEDICATED CABLE-CHANNEL PATHWAYLARGE-FORMAT DECK FIELDBOTTOM / SUPPORT LAYER PATHWAYDocumented module pathway: approx. 1000 × 500 × 50 mm. Cable capacity and support arrangement remain project-confirmed.
E-07
P1 → H5 SELECTION

Duty progression — a pathway, not a numerical load ladder.

The public range progresses from pedestrian/turf protection toward heavier event and vehicle-access applications. The visual intentionally avoids unverified load numbers.

HLJÓÐ · EVENT SURFACE SYSTEMSPLANNING REFERENCE / NOT FOR CONSTRUCTION
LIGHTER DUTY / TURF PRIORITYHEAVIER ACCESS / TEMPORARY WORKS REVIEWEVENT P1
Pedestrian
EVENT P2
Ventilated turf
EVENT T1
Translucent turf
EVENT H1
Heavy event
EVENT H2
Stadium heavy
EVENT H3
Event + vehicle
EVENT H4
Large format
EVENT H5
Extreme duty
Move up the pathway when traffic, vehicle access, large-area coverage, cable management or temporary-works demands increase. Final selection remains project-specific.
Technical intent only.These diagrams are original HLJÓÐ planning graphics derived from the currently documented product features. They do not reproduce factory drawings and do not establish final dimensions, load limits, turf performance, fire classification, slip resistance, vehicle approval or temporary-works design.

From diagram to project scope

Use the graphics with the data sheets and project brief.

The diagrams make coordination logic visible; the technical sheets hold the current source-backed product information and the project brief records the actual event conditions.

Technical Data Sheets Project Brief
Project