HLJÓÐ · Architects · AV consultants · specifiers · contractors
Specifier & Tender Centre
Package the LED project around the exact platform, evidence, interfaces and responsibilities rather than a loose product description. Use the clauses and registers here from early tender through technical submittal and production release.
These clauses preserve the technical checks already built into the HLJÓÐ platform. They can be copied into an early specification, then completed against the exact project configuration.
01LED SYSTEM CLAUSE
LED display system selection
Provide an HLJÓÐ LED display system selected for the stated application, viewing distance, physical screen size, indoor / outdoor environment, daylight conditions, camera requirements, mounting method and service-access strategy. Pixel pitch, cabinet family, brightness, refresh rate, ingress protection and service pathway shall match the selected project configuration rather than a generic product-family claim.
02LED SYSTEM CLAUSE
Cabinet construction & service access
Provide the nominated cabinet format and material with front, rear or front-and-rear maintenance access as stated in the accepted project data sheet. Coordinate the service strategy before final support design. Where rear maintenance is required, provide an accessible service zone sized from the final manufacturer drawings; no generic clearance dimension shall be assumed.
03LED SYSTEM CLAUSE
Brightness, refresh & camera suitability
Confirm brightness and refresh rate for the exact offered LED configuration. Where professional cameras, streaming or broadcast workflows apply, submit the proposed controller, receiving-card, refresh and scan configuration for project review. Camera suitability shall be treated as configuration-specific and shall not be inferred from product-family marketing alone.
04LED SYSTEM CLAUSE
Outdoor protection & exposure
For outdoor display, provide the specified IP-rated cabinet family and confirm the final model-specific protection level. IP rating establishes ingress protection only and shall not be used as evidence of marine or salt-fog corrosion resistance. Coastal projects require a separate corrosion package covering relevant test evidence, coatings, fasteners, PCB protection and material compatibility.
05LED SYSTEM CLAUSE
Power & control architecture
Submit the final controller / processor schedule, receiving-card map, signal distribution, power architecture, redundancy level and input requirements for the selected display. Electrical load shall use the exact project BOM and manufacturer electrical schedule. Circuiting, protection, phase distribution, cable sizing, earthing, inrush, power factor and local electrical compliance remain project-specific.
06LED SYSTEM CLAUSE
Structure, mounting & installation
Coordinate the LED cabinet array with the project-specific support structure, attachments, load path, deflection criteria, service access and cable routing. Wind design, support steel, brackets, rigging, ballast, foundations, anchors and primary-structure capacity are outside the LED cabinet specification unless explicitly included in the project scope and shall be designed by the responsible project professionals.
07LED SYSTEM CLAUSE
Technical submittals & evidence
Before production release, submit the final product data sheet, cabinet / module drawing, project cabinet matrix, processor / receiving-card schedule, electrical schedule, applicable certificates, structural / support information, installation guidance, spare-parts schedule and export packing schedule. Each document shall be checked against the exact offered configuration and revision.
08LED SYSTEM CLAUSE
Freight, spares & handover
Provide a final packing list showing case / pallet count, dimensions, net and gross weight, total CBM, largest and heaviest packed unit and separate identification of LED cabinets, spares, processors, receiving cards, power supplies, cabling and project hardware. Final spare quantities shall be confirmed from the selected BOM rather than from a generic percentage alone.
Coordination templates only. They do not replace project contracts, local engineering, electrical design, statutory review or model-specific manufacturer documentation.
HLJÓÐ · Professional project resource
Platform Tender Pack Register
Use this register to nominate the product-family starting point while keeping final project selections visible. The linked technical data sheet is the current public reference; the project BOM remains subject to technical review.
Final pixel pitch and BOM · Processor / receiving-card architecture · Wind and structural design · Electrical distribution and protection · Service access
/hljod/technical-data/outdoor-aluminium-led
Outdoor Fixed Steel LED
Pixel pitch: P2.5 / P3 / P4 / P5 / P6.67 / P8 / P10 · Current verified cabinet: 960 × 960 × 120 mm · Cabinet weight: Approx. 33 kg for current 960 mm format · Brightness: 5500+ nits · Refresh rate: 1920–3840 Hz · Greyscale: 13–14 bit · Viewing angle: Up to 160° · Operating temperature: -40°C to +60°C
Rear service corridor · Final cabinet / module format · Brightness requirement · Camera / broadcast refresh requirement · Support steel and wind loading
Hanging vs ground support · Rigging / ballast design · Camera refresh requirement · Indoor vs outdoor cabinet · Flight-case schedule
/hljod/technical-data/rental-led
Flexible Curved Rental LED
Pixel pitch: P2.6 / P2.97 / P3.91 · Cabinet: 500 × 500 × 68 mm · Module: 250 × 250 mm · Weight: 7.3 kg · Refresh rate: 3840 Hz published standard · Greyscale: 16 bit · Indoor: 800 nits · IP30 · Outdoor: 4500 nits · IP65
Final screen radius / diameter · Cabinet count and lock-angle geometry · Indoor vs outdoor configuration · Support / hanging system · Content mapping for curved canvas
Closest viewer · Screen size / native resolution · Ambient light · Camera / streaming use · Wall depth and front service
/hljod/technical-data/indoor-smd-led
Indoor COB Fine-Pitch LED
Pixel pitch: P0.7 / P0.9 / P1.2 / P1.5 · Module: 150 × 168.75 mm · Cabinet: 600 × 337.5 × 35 mm · Weight: Approx. 6.5 kg · Brightness: Up to 600 nits · Refresh rate: 3840–7680 Hz · Greyscale: 16 bit · Construction: Die-cast aluminium
Closest viewing distance · Target native resolution · Room brightness · Camera / streaming requirement · Wall depth and service access
/hljod/technical-data/indoor-cob-led
The product-family data sheet is not an approved-for-construction specification. Final configuration, drawings, controller, compliance and project interfaces are confirmed before quotation / production release.
HLJÓÐ · Professional project resource
Technical Evidence & Compliance Register
Track what is currently verified, what is project-specific and what must remain pending. Do not treat a certificate, report or test from one model as evidence for an unrelated configuration.
Evidence / submittal
Status at tender stage
Required closure
Owner / source
Public HLJÓÐ technical data sheet
Available
Confirm selected platform / pitch / cabinet against quote
Apollo
Public technical diagrams
Available / planning
Use for coordination only; replace with final shop drawings where required
Apollo
Final product BOM / model schedule
Pending project selection
Issue exact production BOM and revision
Apollo / manufacturer
Cabinet / module dimensional drawing
Project-specific
Issue final selected-model drawing
Apollo / manufacturer
Processor / receiving-card map
Project-specific
Confirm controller, outputs, ports, receiver cards and redundancy
Apollo / AV integrator
Electrical schedule
Project-specific
Confirm exact W/m² / cabinet load, distribution and input requirements
Apollo / manufacturer / electrician
IP rating evidence
Platform-specific
Match evidence to exact outdoor platform
Manufacturer
CE / FCC / RoHS or destination compliance
Pending exact configuration
Provide model-specific documents where contract / destination requires
Manufacturer / project team
Salt-fog / marine corrosion evidence
Not established by current public IP data
Required for beachfront / marine corrosion claim
Manufacturer
Structural / wind calculations
Project-specific
Use site criteria, final screen geometry and support concept
Issue final warranty and recommended spare BOM with quote / order
Apollo / manufacturer
Export packing schedule
Pending final BOM
Issue cases / pallets, dimensions, net / gross weight, CBM, largest unit
Manufacturer / freight team
Status should move from Pending / Project-specific to Verified only when the exact project configuration and current document revision support that change.
HLJÓÐ · Professional project resource
Project Responsibility Matrix
Use this as an early scope-allocation schedule. Contract wording and local professional appointments take precedence where they assign responsibility differently.
Work / deliverable
Apollo supply-side role
Project / local role
Tender note
LED cabinets & modules
Supply selected display hardware
Receive, protect and coordinate into project works
Final quantity from approved cabinet matrix
Processor / control hardware
Supply / nominate as quoted
AV integration, content sources and local network coordination as applicable
Exact architecture confirmed before quotation
LED power supplies / cabinet wiring
Included within selected display system as quoted
Local incoming supply, distribution, circuit protection and code compliance
Electrical interface to final manufacturer schedule
Support steel / frame
Provide interface information / cabinet geometry where available
Design, fabricate and certify unless explicitly quoted otherwise
Engineer to final loads / wind criteria
Foundations / anchors / primary structure
Interface information only
Design and construction by project team
Project-specific
Rigging / hoists / truss
Display interface information where relevant
Rated rigging system and suspended-load engineering
Route, contain and install as contract scope assigns
Confirm maximum cable lengths / topology
Installation
Supply-only unless separately stated
Local installer / AV integrator / contractor
Use final installation documentation
Commissioning
Remote / technical support as quoted
On-site integrator, electrician and project team as applicable
Confirm scope before order
Structural / wind engineering
Provide screen geometry and cabinet data
Responsible local engineer
Required for outdoor / freestanding / suspended projects
Local approvals / permits
Provide product information reasonably available
Client / consultant / contractor / local professionals
Destination-specific
Import / customs / onward freight
Supply agreed shipping documents / delivery scope
Importer / receiver responsibilities per quotation
Confirm Incoterm / handover point in quote
Unloading / storage / site handling
Provide packing information before dispatch
Receiver provides suitable handling and dry secure storage
Match plant to largest / heaviest package
Final content / CMS operation
Display/control capability as quoted
Client / AV operator / content team
Training and CMS scope to be defined
Apollo is a supply-side project partner. Installation, engineering, approvals and local works are only included where explicitly stated in the project quotation.
HLJÓÐ · Professional project resource
Tender / Submittal Checklist
Use this list to control the information required from tender return through production release and delivery.
Unknown items should stay visibly open. Do not close a line by assumption.
HLJÓÐ · Professional project resource
CAD / BIM / Drawing Register
Use these slots to define the drawing and model outputs needed for the project. Availability depends on the selected platform and what the manufacturer can provide for the exact configuration.
Document / format
Current status
Purpose
Release condition
2D cabinet GA · PDF
Public planning diagrams available; exact GA pending
Dimensions / coordination
Final selected platform
2D cabinet outline · DWG / DXF
Pending manufacturer file
Consultant / fabricator coordination
Exact cabinet model confirmed
Module layout · PDF / DWG
Public planning diagram available; exact CAD pending
Panel / service coordination
Selected pitch and module
Project cabinet matrix · PDF / DWG
Project-specific
Screen geometry / support coordination
Final dimensions approved
Support-interface drawing · PDF / DWG
Project-specific
Secondary steel / bracket coordination
Mounting pathway defined
3D cabinet model · STEP / IFC / Revit where available
Pending manufacturer capability
BIM coordination
Exact model and project need confirmed
Power / signal schematic · PDF / DWG
Public architecture diagram available; exact schematic pending
Electrical / AV coordination
Final processor / power BOM
Rigging / hanging detail · PDF / DWG
Project-specific
Event / suspended system coordination
Final rigging system selected
Do not promise a native Revit / IFC / STEP file until the exact manufacturer model and available source format are confirmed.
Tender-to-release workflow
Move from intent to an evidence-backed production release.
01Tender basis
Select the platform family, application, pitch pathway, screen size and project interfaces.
02Technical submittal
Close exact BOM, drawings, controls, power, certificates and support / installation inputs.
Essential site functions work without analytics. With your permission, Apollo uses analytics to understand which products, guides and project pathways are useful. Analytics stays off until you allow it.