HLJÓÐ · Event Surface Selector
Start with the surface, traffic and event operation.
Use five project inputs to identify the right starting pathway. The result is a planning recommendation, not an engineering approval or final product selection.
Project conditions
This tool deliberately does not use the supplier's headline distributed-load numbers. Vehicle, point-load and temporary-works decisions require the actual project loads and supporting technical evidence.
Selector guardrail
What this tool does not decide.
- It does not certify vehicle or forklift access.
- It does not convert a distributed-load claim into a wheel or axle limit.
- It does not determine safe natural-turf cover duration.
- It does not confirm fire classification, slip resistance or local compliance.
- It does not replace temporary-works, structural, field-management or venue-engineering review where required.
Continue the specification
Turn the starting pathway into a complete project brief.
Carry the selected surface family into the dedicated project brief, then add duration, area, loads, cable routes, ramps, destination and operational constraints.
