Project countryNot supplied
Facility / buyer typeSports club / venue
Primary sport / activityPickleball
Court / facility pathwayClub / multi-court facility
Court count / activity zonesNot supplied
Available footprint / dimensionsNot supplied
Existing base / surfaceExisting concrete / asphalt
EnvironmentOutdoor
Playing surface directionNeed recommendation
COURT PLAY · sport equipmentInclude sport-equipment review
COURT LIGHT · lightingInclude project-lighting review
COURT EDGE · fencing / containmentReview perimeter and gates
COURT OPERATE · daily operationsInclude operations review
COURT COVER · hall / structure intentNo new structure required
Hall clear span / clear-height requirementNot supplied
COURT VENUE · spectators / player areasBasic player + spectator review
Acoustic / neighbour planningStandard site review
Sports technology / venue mediaNeed recommendation
Commercial / hospitality interfaceNot applicable / standard sports facility
Overall supply scopeComplete court package
Project stage / target timingNot supplied
Site conditions, user groups and project prioritiesNot supplied
Destination *Not supplied
Multi-site / staged procurementNot supplied
Freight & receivingNot supplied
Local project teamNot supplied
Required standards / evidenceNot supplied
Plans / court layoutsNot supplied
Maintenance & sparesNot supplied
Before final reviewCustomer project briefs define the sport, performance requirement and project scope rather than selecting an upstream supplier model. Where an exact supplier model is commercially required, Apollo assigns it internally only after the model passes the controlled supplier-evidence and commercial-release gates.
Court lines are not the full site requirement: run-off, circulation, base, drainage, lighting and neighbouring uses remain part of the project.
For club and commercial facilities, plan the customer and operating journey around the courts: player waiting, spectators, storage, acoustics, technology, hospitality interfaces and future expansion can materially change the layout.
For SARENTA SPORT, court count, clear span, playing clearance, enclosure, wind / snow criteria, foundations, lighting, HVAC and local building requirements must be resolved against the destination project.
Final surface suitability follows the actual base, sport mix, indoor/outdoor environment and exact product system rather than a generic surface label.
Local civil works, installation, electrical work and statutory requirements remain project-specific unless expressly included in the quoted supply scope.
This brief organises project information for manual Apollo review. It does not calculate price, approve engineering, certify compliance or transfer local design and installation responsibilities.