Skip to main content
Apollo NZ GlobalSports Project Brief
SARENTAARCHITECTURAL STRUCTURE SYSTEMS

Covered pickleball

Turn court density into an all-weather commercial pickleball venue.

SARENTA SPORT combines a clear-span prefabricated aluminium hall with the wider Apollo pickleball package. The supplier's pickleball system is specifically presented around dense multi-court layouts, PVC-coated roof fabric, professional hard flooring, low-glare lighting and optional acoustic lining.

Clear-span platform Project engineering Complete sports-package pathway
Product-faithful clear-span aluminium multi-court pickleball hall

Supplier-supported capability

What the current material actually supports.

Supplier sports catalogue pages 8–10 support the pickleball-specific structure, surface, lighting, acoustic and court-density statements.

High-strength aluminium frame with project-specific wind design pathway

PVC-coated polyester roof cover

Professional hard-flooring package available

Low-glare lighting available

Acoustic lining available

Prefabricated planning aimed at maximising court density and site utilisation

Facility planning

Freeze the hall only after the sport brief is clear.

01Court count + operating model
02Overall playing envelope + run-off
03Clear side / ridge height
04Acoustic strategy
05Lighting + glare control
06HVAC / ventilation
07Spectator + social zones
08Destination engineering + approvals

Complete Apollo facility stack

The structure is only one layer of the sports venue.

Connect SARENTA SPORT to Apollo's existing court, lighting, seating, acoustic, containment and equipment pathways instead of sourcing each layer independently.

Shared SARENTA technical foundation

Known platform data. Final design remains project-specific.

These are supplier-confirmed planning references, not universal design ratings. Wind, snow, fire, profile sizing, foundations and statutory compliance are resolved against the destination project.

01 · Main-series span5–60 m

Overall SARENTA supplier-confirmed clear-span reference range; sport-specific geometry remains project-led.

02 · Frame6061-T6 aluminium

Supplier-confirmed standard high-strength extruded aluminium structural frame.

03 · Membrane650–1250 gsm PVC

Multiple PVC membrane weights are available, with optional PVDF top coat.

04 · EngineeringProject-specific

Structural calculations, structural drawings, base-positioning and embedment drawings can be supplied.

05 · WallsFabric · panel · glass · ABS

Envelope pathway is selected around sport, climate, security and thermal requirements.

06 · AnchoringConcrete · screw · ballast · temporary

Final foundation / anchoring method is selected against site, loads and intended duration.

SARENTA

Start SARENTA SPORT

Send the destination, sport mix, court count and approximate hall dimensions.

Apollo NZ Global is supply-only. Final structural design, foundations, anchoring, erection, electrical / mechanical services, local engineering, fire strategy, accessibility and statutory approvals remain project-specific.

Start sports brief
Project