Four standard sizes keep the starting point controlled
Auremont uses the current standard-size family rather than promising arbitrary custom widths and lengths. This helps keep product, transport and handling pathways clearer.
Start Project BriefAuremont · Project pathway · Supply-only
Auremont projects start with one of four current standard external pool sizes. The selected standard shell then moves through compatible option selection, review of client-provided project information and destination requirements, approved project CAD, manufacture, freight, destination lifting, utility connection, filling and local commissioning. Auremont is supply-only and does not include physical site inspection.

Product details
The sequence can vary by project, but manufacture should not begin until the main shell, equipment, option and site-interface decisions are sufficiently resolved.
Auremont is a supply-only modular pool pathway. Final dimensions, equipment, freight, lifting data, warranties and installation requirements are confirmed for the actual supplied configuration. Local foundations, lifting, installation, connections, barriers, approvals and statutory work are not included unless expressly stated in the quotation.
Applications + project fit
Auremont uses the current standard-size family rather than promising arbitrary custom widths and lengths. This helps keep product, transport and handling pathways clearer.
Viewing windows, Baja shelves, pool + spa layouts and some cover pathways should be resolved before project CAD and production are frozen.
Pump, filter, heater, treatment, controls and other equipment are locked on the final schedule rather than assumed from one generic pool specification.
The client and local project team should confirm truck access, crane setup, overhead obstacles and final placement before fences, decks, roofs or planting remove the required access. Auremont project planning works from the information they provide.
Foundations, retaining, crane work, utility connections, barriers, inspections, landscaping and other local works remain separate destination responsibilities unless the written scope says otherwise.
Approved drawings, equipment references, manuals, warranty terms and commissioning notes should stay together for future servicing, spares and warranty review.
Connected project pathway
Four fixed external standard pool formats with installation, equipment and compatible options configured around the selected modular shell.
Open pathway Planning guideComplete Modular Pool Planning GuidePlan the pool, foundation, access, lifting, services, barriers and surrounding works before the final configuration is released.
Open pathway ReadinessAUREMONT Site ReadinessCheck support, access, services, safety planning and exposure before the selected standard pool is configured.
Open pathway TechnicalTechnical & Specifier CentreUse current product information, technical documentation and professional project resources.
Open pathway Project briefAUREMONT Project Brief BuilderCompile the selected standard size, site, access, services and project-stage information for review.
Open pathwayReview this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.
Global supply
Open the relevant market page for regional product information, project examples and supply enquiries.
Ready to review the project?