Support / foundation
A local engineer or suitably qualified project team should design the final support around the configured pool, site soils, levels, loads, drainage and destination requirements.
Start Project BriefAuremont · Installation pathways · Supply-only
Auremont arrives as a factory-prepared modular pool and is placed onto the destination site's prepared support using suitable lifting equipment. AUREMONT project review works from client-provided dimensions, drawings, photos, access information and other project details; physical site inspection is not included. Foundations, retaining, crane or lifting work, electrical, plumbing, drainage, barriers, installation, approvals and local commissioning remain the destination project's responsibility unless expressly stated otherwise.

Product details
These pathways describe how the supplied pool can relate to the site. They are not generic foundation details: the final support, retaining, drainage, crane plan and local compliance solution must follow the configured pool and destination conditions.
AUREMONT is supply-only and is not sold as an installed turnkey pool unless a written project scope expressly says otherwise. Final support, crane / lifting, retaining, drainage, utility connections, barriers, installation, regulated trade work, approvals and commissioning remain destination-site responsibilities.
Applications + project fit
A local engineer or suitably qualified project team should design the final support around the configured pool, site soils, levels, loads, drainage and destination requirements.
Truck route, turning area, lifting-provider setup, overhead obstacles, underground services, lift radius and final set-down position should be checked before access is closed.
The final equipment schedule establishes the pool-side electrical demand; destination connection, protection, isolation and regulated work remain local responsibilities.
Fill, top-up, waste / backwash and surrounding drainage routes should be allowed for before decks, walls or landscaping are finished.
Pump, filter, heater, treatment and controls need ventilation, drainage and realistic maintenance / replacement access for the life of the pool.
Pool fencing, barriers, permits, inspections and authority requirements vary by jurisdiction and are coordinated by the destination project team.
Connected project pathway
Four fixed external standard pool formats with installation, equipment and compatible options configured around the selected modular shell.
Open pathway Planning guideComplete Modular Pool Planning GuidePlan the pool, foundation, access, lifting, services, barriers and surrounding works before the final configuration is released.
Open pathway ReadinessAUREMONT Site ReadinessCheck support, access, services, safety planning and exposure before the selected standard pool is configured.
Open pathway TechnicalTechnical & Specifier CentreUse current product information, technical documentation and professional project resources.
Open pathway Project briefAUREMONT Project Brief BuilderCompile the selected standard size, site, access, services and project-stage information for review.
Open pathwayReview this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.
Global supply
Open the relevant market page for regional product information, project examples and supply enquiries.
Ready to review the project?